BS IEC 63277:2021
$102.76
Binary power generation systems with capacity less than 100 kW. Performance test methods
Published By | Publication Date | Number of Pages |
BSI | 2021 | 20 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | undefined |
4 | CONTENTS |
5 | FOREWORD |
7 | INTRODUCTION |
8 | 1 Scope 2 Normative references 3 Terms and definitions |
10 | 4 Construction, power of binary power generation system 4.1 General construction of binary power generation system 4.2 Net power (Sending-end output) / Gross power (Generating power) 5 Test condition 5.1 General test condition Figures Figure 1 – Binary power generation system |
11 | 5.2 Rated test condition 5.2.1 General 5.2.2 Tolerance of the rated net power 5.3 Accuracy of instruments used for measurement 5.3.1 Thermometer 5.3.2 Flowmeter 5.3.3 Three-phase power meter Table 1 – Test conditions |
12 | 5.3.4 Calibration 6 Measurement and calculation method of power output and power generation efficiency 6.1 Measurement method of net power (sending-end output) |
13 | 6.2 Measurement method of flow rate and temperature of hot water 6.2.1 Temperature measurement of hot water Figure 2 – Performance measuring method |
14 | 6.2.2 Flow rate measurement of hot water 6.3 Measurement method of flow rate and temperature of cooling water 6.4 Calculation method of power output and power generation efficiency 6.4.1 Receiving heat amount from hot water in the evaporator QH (kW) 6.4.2 Net power (sending-end output) Lnet (kW) Figure 3 – Example of arrangement of hot water flowmeter |
15 | 6.4.3 Power generation efficiency ηeout 7 Marking documentation 7.1 Marking on the product 7.2 Description in the technical documentation |
17 | Annex A (informative)Specification of grid-connected inverterfor power generation systems A.1 Outline of the equipment A.2 Required specification Figure A.1 – Interconnection circuit diagram using grid-connect inverter |
18 | Annex B (informative)Calculation of electric power efficiency |
19 | Annex C (informative)Items of test report |