{"id":347241,"date":"2024-10-20T00:25:13","date_gmt":"2024-10-20T00:25:13","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iso-iec-ieee-152892017\/"},"modified":"2024-10-25T23:54:58","modified_gmt":"2024-10-25T23:54:58","slug":"bs-iso-iec-ieee-152892017","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iso-iec-ieee-152892017\/","title":{"rendered":"BS ISO\/IEC\/IEEE 15289:2017"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | National foreword <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 1 Scope <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 2 Normative references 3 Terms, definitions, and abbreviated terms 3.1 Terms and definitions <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 3.2 Abbreviated terms 4 Applicability 4.1 Purpose 4.2 Intended users of this document <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 4.3 Applicability to work efforts 4.4 Applicability to information item audiences 5 Conformance 5.1 Definition of conformance <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 5.2 Conformance situations <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 5.3 Type of conformance 6 Life-cycle data and information items 6.1 Life-cycle data characteristics 6.2 Records compared to information items (documents) <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 6.3 Management of life-cycle data (records) 6.4 Management of information items (documents) 6.4.1 Developing the documentation plan <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 6.4.2 Managing and controlling information items 7 Generic types of information items 7.1 General 7.2 Description \u2013 generic content <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 7.3 Plan \u2013 generic content <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 7.4 Policy \u2013 generic content <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 7.5 Procedure \u2013 generic content <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 7.6 Report \u2013 generic content <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 7.7 Request \u2013 generic content 7.8 Specification \u2013 generic content <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 8 Mapping of information items to the life cycle and service management processes <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 8.1 Mapping of information items to the system life cycle <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 8.2 Mapping of information items to the software life cycle <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | 8.3 Mapping of information items to the service management processes <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | 9 Records 9.1 Record \u2013 generic content <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | 9.2 Specific record contents <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | 10 Specific information item (document) contents 10.1 General 10.2 Acceptance plan 10.3 Acceptance report <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | 10.4 Acquisition plan 10.5 Asset management plan 10.6 Audit acknowledgement report <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | 10.7 Audit plan 10.8 Audit procedure 10.9 Audit report 10.10 Capacity plan <\/td>\n<\/tr>\n | ||||||
54<\/td>\n | 10.11 Capacity management procedure 10.12 Change request 10.13 Communication procedure 10.14 Complaint procedure <\/td>\n<\/tr>\n | ||||||
55<\/td>\n | 10.15 Concept of operations 10.16 Configuration management plan and policy <\/td>\n<\/tr>\n | ||||||
56<\/td>\n | 10.17 Configuration management procedure <\/td>\n<\/tr>\n | ||||||
57<\/td>\n | 10.18 Configuration status report 10.19 Contract <\/td>\n<\/tr>\n | ||||||
58<\/td>\n | 10.20 Customer satisfaction survey 10.21 Database design description <\/td>\n<\/tr>\n | ||||||
59<\/td>\n | 10.22 Development plan 10.23 Disposal plan <\/td>\n<\/tr>\n | ||||||
60<\/td>\n | 10.24 Documentation plan 10.25 Documentation procedure 10.26 Domain engineering plan 10.27 Evaluation report <\/td>\n<\/tr>\n | ||||||
61<\/td>\n | 10.28 Implementation procedure 10.29 Improvement plan 10.30 Improvement procedure <\/td>\n<\/tr>\n | ||||||
62<\/td>\n | 10.31 Incident management procedure 10.32 Incident report <\/td>\n<\/tr>\n | ||||||
63<\/td>\n | 10.33 Information management plan 10.34 Information management procedure 10.35 Information security plan <\/td>\n<\/tr>\n | ||||||
64<\/td>\n | 10.36 Information security policy 10.37 Information security procedure <\/td>\n<\/tr>\n | ||||||
65<\/td>\n | 10.38 Installation plan 10.39 Installation report 10.40 Integration and test report 10.41 Integration plan <\/td>\n<\/tr>\n | ||||||
66<\/td>\n | 10.42 Interface description 10.43 Life-cycle policy and procedure 10.44 Maintenance plan <\/td>\n<\/tr>\n | ||||||
67<\/td>\n | 10.45 Maintenance procedure 10.46 Measurement plan 10.47 Measurement procedure 10.48 Monitoring and control report <\/td>\n<\/tr>\n | ||||||
68<\/td>\n | 10.49 Operational test procedure 10.50 Problem management procedure 10.51 Problem report <\/td>\n<\/tr>\n | ||||||
69<\/td>\n | 10.52 Process assessment procedure 10.53 Process improvement report 10.54 Product need assessment <\/td>\n<\/tr>\n | ||||||
70<\/td>\n | 10.55 Progress report 10.56 Project management plan <\/td>\n<\/tr>\n | ||||||
71<\/td>\n | 10.57 Proposal 10.58 Qualification test procedure <\/td>\n<\/tr>\n | ||||||
72<\/td>\n | 10.59 Qualification test report 10.60 Quality management plan 10.61 Quality management policy and procedure <\/td>\n<\/tr>\n | ||||||
73<\/td>\n | 10.62 Release plan (and policy) <\/td>\n<\/tr>\n | ||||||
74<\/td>\n | 10.63 Request for proposal (RFP) 10.64 Resource request 10.65 Reuse plan <\/td>\n<\/tr>\n | ||||||
75<\/td>\n | 10.66 Review minutes 10.67 Risk action request 10.68 Risk management policy and plan 10.69 Service catalog 10.70 Service continuity and availability plan <\/td>\n<\/tr>\n | ||||||
76<\/td>\n | 10.71 Service level agreement (SLA) <\/td>\n<\/tr>\n | ||||||
77<\/td>\n | 10.72 Service management plan (and policy) 10.73 Service plan <\/td>\n<\/tr>\n | ||||||
78<\/td>\n | 10.74 Service report 10.75 Software architecture description <\/td>\n<\/tr>\n | ||||||
79<\/td>\n | 10.76 Software design description <\/td>\n<\/tr>\n | ||||||
80<\/td>\n | 10.77 Software requirements specification <\/td>\n<\/tr>\n | ||||||
81<\/td>\n | 10.78 Software unit description 10.79 Software unit test procedure 10.80 Software unit test report 10.81 Supplier management procedure <\/td>\n<\/tr>\n | ||||||
82<\/td>\n | 10.82 Supplier selection procedure 10.83 System architecture description <\/td>\n<\/tr>\n | ||||||
83<\/td>\n | 10.84 System element description 10.85 System requirements specification <\/td>\n<\/tr>\n | ||||||
84<\/td>\n | 10.86 Training documentation 10.87 Training plan 10.88 User documentation <\/td>\n<\/tr>\n | ||||||
85<\/td>\n | 10.89 User notification 10.90 Validation plan 10.91 Validation procedure (validation test specification) 10.92 Validation report 10.93 Verification plan <\/td>\n<\/tr>\n | ||||||
87<\/td>\n | 10.94 Verification procedure 10.95 Verification report <\/td>\n<\/tr>\n | ||||||
88<\/td>\n | Annex A <\/td>\n<\/tr>\n | ||||||
90<\/td>\n | Annex B <\/td>\n<\/tr>\n | ||||||
94<\/td>\n | Bibliography <\/td>\n<\/tr>\n | ||||||
99<\/td>\n | Blank Page <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Systems and software engineering. Content of life-cycle information items (documentation)<\/b><\/p>\n |