{"id":98669,"date":"2024-10-18T11:55:13","date_gmt":"2024-10-18T11:55:13","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ashrae-202-2013\/"},"modified":"2024-10-24T21:12:44","modified_gmt":"2024-10-24T21:12:44","slug":"ashrae-202-2013","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ashrae\/ashrae-202-2013\/","title":{"rendered":"ASHRAE 202 2013"},"content":{"rendered":"

New ASHRAE Standard 202-2013, Commissioning Process for Buildings and Systems, describes how to plan, conduct, and document this vital part of a successful project. Informative appendices provide sample documentation, including checklists, systems manual, reports, training plan, and more. Supplementary guidelines (Guidelines 0, 1.1, and 1.5) are available in the ASHRAE Bookstore and provide specific and detailed information on how to implement the commissioning process for each major building\/facility, system or assembly, and for various stages of facility development and operation. Keywords: building performance, performance testing, building system verification, Owner’s Project Requirements<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\nANSI\/ASHRAE\/IES Standard 202-2013 <\/td>\n<\/tr>\n
3<\/td>\nContents <\/td>\n<\/tr>\n
4<\/td>\nForeword
1. Purpose <\/td>\n<\/tr>\n
5<\/td>\n2. Scope
3. Definitions <\/td>\n<\/tr>\n
6<\/td>\n4. Utilization <\/td>\n<\/tr>\n
7<\/td>\n5. Initiating the Commissioning Process <\/td>\n<\/tr>\n
8<\/td>\n6. Owner’s Project Requirements <\/td>\n<\/tr>\n
9<\/td>\n7. Commissioning Plan
8. Basis of Design
9. Contractor, Supplier, and Manufacturer Commissioning Requirements <\/td>\n<\/tr>\n
10<\/td>\n10. Design Review
11. Commissioning Submittal Review
12. Construction Observation and Testing <\/td>\n<\/tr>\n
11<\/td>\n13. Issues and Resolutions Documentation
14. Systems Manual <\/td>\n<\/tr>\n
12<\/td>\n15. Training
16. Postoccupancy Operation
17. Commissioning Report <\/td>\n<\/tr>\n
14<\/td>\nInformative Appendix A\u2014Commissioning Process Documentation Matrix <\/td>\n<\/tr>\n
17<\/td>\nInformative Appendix B\u2014Quality Based Sampling Process <\/td>\n<\/tr>\n
21<\/td>\nInformative Appendix C\u2014Initiating the Commissioning Process <\/td>\n<\/tr>\n
23<\/td>\nInformative Appendix D\u2014Owner’s Project Requirements <\/td>\n<\/tr>\n
25<\/td>\nInformative Appendix E\u2014Commissioning Plan <\/td>\n<\/tr>\n
27<\/td>\nInformative Appendix F\u2014Basis of Design <\/td>\n<\/tr>\n
29<\/td>\nInformative Appendix G\u2014Commissioning Specifications <\/td>\n<\/tr>\n
31<\/td>\nInformative Appendix H\u2014Design Review and Report <\/td>\n<\/tr>\n
33<\/td>\nInformative Appendix I\u2014Submittal Review and Report <\/td>\n<\/tr>\n
34<\/td>\nInformative Appendix J\u2014Construction Observation and Testing Checklists and Reports <\/td>\n<\/tr>\n
37<\/td>\nInformative Appendix K\u2014Issues and Resolution Log <\/td>\n<\/tr>\n
38<\/td>\nInformative Appendix L\u2014Systems Manual <\/td>\n<\/tr>\n
41<\/td>\nInformative Appendix M\u2014Training Plans and Records <\/td>\n<\/tr>\n
45<\/td>\nInformative Appendix N\u2014End of Warranty Commissioning <\/td>\n<\/tr>\n
46<\/td>\nInformative Appendix O\u2014Commissioning Report <\/td>\n<\/tr>\n
48<\/td>\nInformative Appendix P\u2014Commissioning Resources <\/td>\n<\/tr>\n
49<\/td>\nInformative Appendix Q\u2014References <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

ANSI\/ASHRAE\/IES Standard 202-2013 Commissioning Process for Buildings and Systems<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
ASHRAE<\/b><\/a><\/td>\n2013<\/td>\n54<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":98670,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2719],"product_tag":[],"class_list":{"0":"post-98669","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-ashrae","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/98669","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/98670"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=98669"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=98669"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=98669"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}