{"id":98669,"date":"2024-10-18T11:55:13","date_gmt":"2024-10-18T11:55:13","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ashrae-202-2013\/"},"modified":"2024-10-24T21:12:44","modified_gmt":"2024-10-24T21:12:44","slug":"ashrae-202-2013","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ashrae\/ashrae-202-2013\/","title":{"rendered":"ASHRAE 202 2013"},"content":{"rendered":"
New ASHRAE Standard 202-2013, Commissioning Process for Buildings and Systems, describes how to plan, conduct, and document this vital part of a successful project. Informative appendices provide sample documentation, including checklists, systems manual, reports, training plan, and more. Supplementary guidelines (Guidelines 0, 1.1, and 1.5) are available in the ASHRAE Bookstore and provide specific and detailed information on how to implement the commissioning process for each major building\/facility, system or assembly, and for various stages of facility development and operation. Keywords: building performance, performance testing, building system verification, Owner’s Project Requirements<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | ANSI\/ASHRAE\/IES Standard 202-2013 <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | Foreword 1. Purpose <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | 2. Scope 3. Definitions <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | 4. Utilization <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | 5. Initiating the Commissioning Process <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 6. Owner’s Project Requirements <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 7. Commissioning Plan 8. Basis of Design 9. Contractor, Supplier, and Manufacturer Commissioning Requirements <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 10. Design Review 11. Commissioning Submittal Review 12. Construction Observation and Testing <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 13. Issues and Resolutions Documentation 14. Systems Manual <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 15. Training 16. Postoccupancy Operation 17. Commissioning Report <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | Informative Appendix A\u2014Commissioning Process Documentation Matrix <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | Informative Appendix B\u2014Quality Based Sampling Process <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | Informative Appendix C\u2014Initiating the Commissioning Process <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | Informative Appendix D\u2014Owner’s Project Requirements <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | Informative Appendix E\u2014Commissioning Plan <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | Informative Appendix F\u2014Basis of Design <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | Informative Appendix G\u2014Commissioning Specifications <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | Informative Appendix H\u2014Design Review and Report <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | Informative Appendix I\u2014Submittal Review and Report <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | Informative Appendix J\u2014Construction Observation and Testing Checklists and Reports <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | Informative Appendix K\u2014Issues and Resolution Log <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | Informative Appendix L\u2014Systems Manual <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | Informative Appendix M\u2014Training Plans and Records <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | Informative Appendix N\u2014End of Warranty Commissioning <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | Informative Appendix O\u2014Commissioning Report <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | Informative Appendix P\u2014Commissioning Resources <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | Informative Appendix Q\u2014References <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" ANSI\/ASHRAE\/IES Standard 202-2013 Commissioning Process for Buildings and Systems<\/b><\/p>\n |