ASME PTC 1 2015

$98.04

ASME PTC 1 – 2015: General Instructions

Published By Publication Date Number of Pages
ASME 2015 26
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

PTC 1, General Instructions, provides direction to users and code-writing committees of Performance Test Codes. Code’s users shall consider it as part of each test. The objectives of PTC 1 are to define the purpose and scope of ASME Performance Test Codes, to list major industry applications where PTCs can be used, and to provide direction on the use of equipment Performance Test Codes concerning the planning, preparation, implementation, and reporting of test results. Most ASME Performance Test Codes are applicable to a specific type of equipment defined by the Code. There may be several subcategories of equipment covered by a single Code. Types of equipment for which PTCs apply can be classified into five broad categories: (a) electrical or mechanical power producing; (b) combustion and heat transfer; (c) fluid handling; (d) emission control, and; (e) allied equipment. The quantities, which characterize performance, defined in each code for the equipment within its scope. Performance characteristics determined by adherence to a PTC can be evaluated as compared to design or predicted characteristics, to previous test results, or they can be used to benchmark or ascertain performance at a particular time. Some PTCs are written as general documents for reference, in support of the equipment PTCs. These can be considered as technical reference material for the equipment codes. Reference material codes can be divided into three types. The first type addresses the measurement of phenomena closely associated with the equipment, such as emissions. The second type covers instrumentation used in the measurement of thermodynamic or process fluid parameters, such as pressure, temperature, flow, and steam quality, and how to analyze the uncertainties associated with measurement of all primary parameters to develop overall test uncertainty is included in this type. Such individual codes referring to process or thermodynamic quantities are known as Performance Test Code Instruments and Apparatus Supplements. They are supplementary to the information on mandatory instrumentation requirements contained in the equipment codes. Instrumentation information in equipment test codes can supersede the information given in these supplements, or these supplements may be referenced by an equipment Test Code where deemed appropriate by the committee. The third type covers miscellaneous general information, and currently consists of PTC 1and PTC 2, “Definitions and Values.” PTC 2 contains standards for terms, units, values of constants, and technical nomenclature.

PDF Catalog

PDF Pages PDF Title
4 CONTENTS
5 FOREWORD
7 COMMITTEE ROSTER
8 CORRESPONDENCE WITH THE PTC COMMITTEE
9 INTRODUCTION
10 Section 1 Purpose, Scope, and Organization
1-1 DEFINITION AND PURPOSE
1-2 STANDARDS COMMITTEES
1-3 SCOPE AND ORGANIZATION OF PTCs
1-4 PHILOSOPHY
11 Figures
Fig. 1-3-1 Organization of Equipment Performance Test Codes
12 Fig. 1-3-2 Organization of Supplemental Documents
13 1-5 APPLICATIONS OF PTCs
1-6 TEST UNCERTAINTY
1-6.1 Definition
1-6.2 Applications of Test Uncertainty Analysis — General
1-6.2.1 Pretest Uncertainty Analysis.
1-6.2.2 Post-Test Uncertainty Analysis.
1-6.3 ASME PTC Treatment and Uses of Test Uncertainty
1-6.3.1 Permissible Uses of Test Uncertainty.
14 1-6.3.2 Nonpermissible Uses of Test Uncertainty.
1-7 OTHER CODES AND STANDARDS
15 Section 2 Standard Form of Individual Equipment Test Codes
2-1 INTRODUCTION
2-2 SECTION 1, OBJECT AND SCOPE
2-2.1 Object
2-2.2 Scope
2-2.3 Uncertainty
2-3 SECTION 2, DEFINITIONS AND DESCRIPTIONS OF TERMS
2-4 SECTION 3, GUIDING PRINCIPLES
16 2-5 SECTION 4, INSTRUMENTS AND METHODS OF MEASUREMENT
2-6 SECTION 5, COMPUTATION OF RESULTS
2-7 SECTION 6, REPORT OF RESULTS
2-8 SECTION 7, TEST UNCERTAINTY
2-9 ADDITIONAL SECTIONS AND APPENDICES
2-10 ALTERNATIVE METHOD
17 Section 3 Information for ASME Performance Test Code Users
3-1 INTRODUCTION
3-2 PARTIES TO A TEST
3-3 PREPARATIONS FOR TESTING
3-3.1 General Precaution
3-3.2 Agreements
3-3.3 Timing
18 3-3.4 Preparation
3-3.5 Starting and Stopping
3-3.6 Acceptability of Equipment and Instruments
3-3.7 Preliminary Test Runs
3-4 TESTS
3-4.1 Readjustments
3-4.2 Data Collection
3-4.3 Conduct of Test
3-5 INSTRUMENTS
3-5.1 Use of Supplements on Instrumentation and Apparatus
19 3-5.2 Location and Identification of Instruments
3-5.3 Frequency and Timing of Observations
3-6 OPERATING CONDITIONS
3-6.1 Operating Philosophy
3-6.2 Permissible Deviations
3-6.3 Inconsistent Measurements
3-7 RECORDS
3-7.1 Data Records and Test Log
3-8 TESTING TECHNIQUE
3-8.1 Technical Considerations
3-8.2 Precision and Accuracy
20 3-9 ERRORS
3-9.1 Sources of Errors
3-9.2 Proper Identification and Propagation of Errors
3-10 COMPUTATION OF RESULTS
3-10.1 Data Reduction
3-10.2 Inconsistencies in Test Results
3-10.2.1 Recorded Data.
3-10.2.2 Analysis and Interpretation.
3-10.3 Data Presentation
3-10.4 Graphical Presentation and Scales
3-10.5 Analysis Requirements
3-10.6 Data Reduction and Averaging
21 3-10.7 Curve Construction
3-11 TEST REPORT
3-11.1 Completion and Approval
3-11.2 Test Report Contents
22 Section 4 Acceptance Tests: Responsibilities and Purchase Contracts
4-1 INTRODUCTION
4-2 COST AND LOCATION OF ACCEPTANCE TESTS
4-3 TEST RESPONSIBILITIES
4-4 DISPUTE RESOLUTION
4-5 COMPARISON OF TEST RESULTS TO CONTRACTUAL GUARANTEES
4-6 SUGGESTED CLAUSE FOR INCORPORATING ASME PTCs IN EQUIPMENT PURCHASE CONTRACTS