ASME B30.27 2014

$98.04

ASME B30.27 Material Placement Systems

Published By Publication Date Number of Pages
ASME 2014 40
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

B30.27 applies to the construction, installation, operation, inspection, testing, and maintenance of trailer and truck-mounted material placement systems. Included in this are mechanical and hydraulic pea gravel systems, mobile telescoping boom conveyors, separate placing booms, and material placement accessories. Truck-mounted material placement systems can be either with or without an integral placing boom. This Volume does not apply to conveyor parts of mobile telescoping boom conveyors, mortar conveying or spraying machines, or dry mix shotcreting machines. The conveyor section of these machines is covered by ASME B20.1.

PDF Catalog

PDF Pages PDF Title
5 CONTENTS
7 FOREWORD
9 COMMITTEE ROSTER
11 B30 STANDARD INTRODUCTION
14 SUMMARY OF CHANGES
15 Chapter 27-0 Scope, Definitions, References, and Personnel Competence
SECTION 27-0.1: SCOPE
SECTION 27-0.2: DEFINITIONS
16 Figures
Fig. 27-0.1-1 Material Placement System: Truck-Mounted Concrete Pump With Integrated Placing Boom
Fig. 27-0.1-2 Material Placement System: Separate Placing Boom
Fig. 27-0.1-3 Material Placement System: Truck-Mounted Telescopic Conveyor System
17 SECTION 27-0.3: REFERENCE TO OTHER CODES AND STANDARDS
Fig. 27-0.1-4 Material Placement System: Examples of Delivery System Components
18 27-0.4: PERSONNEL COMPETENCE
19 Chapter 27-1 Construction and Installation
SECTION 27-1.1: MARKINGS
20 SECTION 27-1.2: MOBILE MATERIAL PLACING BOOM CONSTRUCTION
27-1.2.1 Structural
27-1.2.2 Stability
27-1.2.3 Lifting Attachments
27-1.2.4 Replacement Parts
SECTION 27-1.3: WORK PLATFORMS, ACCESS WALKWAYS, AND GANGWAYS
SECTION 27-1.4: ELECTRICAL INSTALLATIONS
SECTION 27-1.5: ERGONOMICS
21 SECTION 27-1.6: OUTRIGGERS
SECTION 27-1.7: CONTROLS AND INDICATORS
27-1.7.1 Emergency Stops
27-1.7.2 Outriggers
27-1.7.3 General Control Requirements
27-1.7.4 Hour Meters
27-1.7.5 Standardized Joystick Movements
SECTION 27-1.8: GUARDS
SECTION 27-1.9: MOBILE AND STATIONARY PLACING BOOMS
27-1.9.1 Placing Booms
22 27-1.9.2 Boom Tip Attachments
SECTION 27-1.10: DELIVERY SYSTEMS
27-1.10.1 Delivery Line
27-1.10.2 Delivery System Components
SECTION 27-1.11: LOSS OF POWER
SECTION 27-1.12: REMOTE STARTING
SECTION 27-1.13: MANUALS
Fig. 27-1.7.5-1 Standardized Joystick Movement
23 SECTION 27-1.14 TRANSLATION OF NON-ENGLISH DOCUMENTATION INTO ENGLISH
SECTION 27-1.15: FUEL AND EXHAUST SYSTEMS
SECTION 27-1.16: HOPPERS
SECTION 27-1.17: PUMP PRESSURE RELEASE
27-1.17.1 Reversible Pumps
27-1.17.2 Nonreversible Pumps
24 Fig. 27-1.16-1 Grates and Hoppers
25 Chapter 27-2 Inspection, Testing, and Maintenance
SECTION 27-2.1: INSPECTION
27-2.1.1 Inspection Classifications
27-2.1.2 Frequent Inspection
27-2.1.2.1
27-2.1.2.2
27-2.1.2.3
27-2.1.2.4
27-2.1.2.5
26 27-2.1.3 Periodic Inspections
27-2.1.3.1
27-2.1.3.2
27-2.1.3.3
27-2.1.3.4
27-2.1.3.5
27-2.1.4 Material Placement Systems Not in Regular Use
27-2.1.5 Inspection Records
SECTION 27-2.2: TESTING
27-2.2.1 Operational Testing
27 27-2.2.2 ManufacturerŒs Stability Test
27-2.2.3 Postmaintenance Test
SECTION 27-2.3: MAINTENANCE
28 Chapter 27-3 Operation
SECTION 27-3.1: QUALIFICATIONS FOR AND CONDUCT OF OPERATORS AND OPERATING PRACTICES
27-3.1.1 Operators
27-3.1.2 Qualifications for Operators
29 27-3.1.3 Responsibilities
27-3.1.3.1 Responsibilities of the Material Placement System Owner and Material Placement System User.
27-3.1.3.1.1
30 27-3.1.3.1.2
27-3.1.3.2 Responsibilities of Site Supervisor and Pour Supervisor.
27-3.1.3.2.1
31 27-3.1.3.2.2
32 27-3.1.3.3 Responsibilities of Material Placement System Operators.
27-3.1.3.3.1
27-3.1.3.4 Responsibilities of Liquid Structural Material Suppliers.
27-3.1.3.4.1
27-3.1.3.4.2
33 27-3.1.3.5 Responsibilities of the Placing Crew.
27-3.1.4 Conduct of Operators
27-3.1.5 Operating Practices
34 Fig. 27-3.1.5-1 Area of Extended Outriggers
35 27-3.1.6 Operating of Boom or Conveyor Near Electric Power Lines
27-3.1.6.1
27-3.1.6.2
27-3.1.6.3
27-3.1.6.4
27-3.1.6.5
27-3.1.7 Cleaning Pipeline
27-3.1.7.1
27-3.1.7.2 Compressed Air
27-3.1.8 Knowledge of Manual Content
SECTION 27-3.2: MATERIAL PLACEMENT SYSTEM LOCKOUT/TAGOUT
36 Fig. 27-3.1.6.1-1 Danger Zone for Material Placement Systems and Delivery System Operating Near Electrical Transmission Lines
37 SECTION 27-3.3: SIGNALS
27-3.3.1 Standard Signals
27-3.3.2 Hand Signals
27-3.3.3 Special Signals
27-3.3.4 Instructions
Fig. 27-3.3.2-1 Material Placement System Hand Signals
Table
Table 27-3.1.6.3-1 Minimum Required Clearances
ASME B30.27 2014