{"id":182941,"date":"2024-10-19T11:27:01","date_gmt":"2024-10-19T11:27:01","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/asme-b30-16-2017\/"},"modified":"2024-10-25T03:48:12","modified_gmt":"2024-10-25T03:48:12","slug":"asme-b30-16-2017","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/asme\/asme-b30-16-2017\/","title":{"rendered":"ASME B30.16 2017"},"content":{"rendered":"

B30.16 includes provisions that apply to the construction, installation, operation, inspection, testing, and maintenance of overhead underhung and stationary hoists including hand chain-operated, electric-powered and air-powered chain and wire rope hoists used for, but not limited to, vertical lifting and lowering of freely suspended, unguided loads that consist of equipment and materials. Requirements for a hoist that is used for a special purpose, such as, but not limited to, tensioning a load, non-vertical lifting service, lifting a guided load, lifting personnel, or drawing both the load and the hoist up or down   the load chain  or rope when the hoist is attached to the load, are not included in this Volume.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
4<\/td>\nCONTENTS <\/td>\n<\/tr>\n
5<\/td>\nFOREWORD <\/td>\n<\/tr>\n
7<\/td>\nASME B30 COMMITTEE ROSTER <\/td>\n<\/tr>\n
9<\/td>\nB30 STANDARD INTRODUCTION
SECTION I: SCOPE
SECTION II: SCOPE EXCLUSIONS
SECTION III: PURPOSE
SECTION IV: USE BY REGULATORY AGENCIES
SECTION V: EFFECTIVE DATE <\/td>\n<\/tr>\n
10<\/td>\nSECTION VI: REQUIREMENTS AND RECOMMENDATIONS
SECTION VII: USE OF MEASUREMENT UNITS
SECTION VIII: REQUESTS FOR REVISION
SECTION IX: REQUESTS FOR INTERPRETATION
SECTION X: ADDITIONAL GUIDANCE <\/td>\n<\/tr>\n
12<\/td>\nSUMMARY OF CHANGES <\/td>\n<\/tr>\n
14<\/td>\nOVERHEAD UNDERHUNG AND STATIONARY HOISTS
Chapter 16-0 Scope, Definitions, Personnel Competence, and References
SECTION 16-0.1: SCOPE OF B30.16
SECTION 16-0.2: DEFINITIONS <\/td>\n<\/tr>\n
16<\/td>\nSECTION 16-0.3: PERSONNEL COMPETENCE
SECTION 16-0.4: REFERENCES <\/td>\n<\/tr>\n
17<\/td>\nFigures
Fig. 16-0.1-1 Hand-Chain-Operated Chain Hoist
Fig. 16-0.1-2 Electric-Powered Chain Hoist <\/td>\n<\/tr>\n
18<\/td>\nFig. 16-0.1-3 Air-Powered Chain Hoist <\/td>\n<\/tr>\n
19<\/td>\nFig. 16-0.1-4 Electric-Powered Wire Rope Hoist <\/td>\n<\/tr>\n
20<\/td>\nFig. 16-0.1-5 Air-Powered Wire Rope Hoist <\/td>\n<\/tr>\n
21<\/td>\nFig. 16-0.1-6 Stationary Hoist <\/td>\n<\/tr>\n
24<\/td>\nChapter 16-1 Marking, Construction, and Installation
SECTION 16-1.1: MARKING
16-1.1.1 Rated Load
16-1.1.2 Controls
16-1.1.3 Identification
16-1.1.4 Product Safety Information
16-1.1.5 Technical and Safety-Related Information <\/td>\n<\/tr>\n
25<\/td>\nSECTION 16-1.2: CONSTRUCTION
16-1.2.1 Mechanical Design
16-1.2.2 Electrical Design (Electric-Powered Hoists Only)
16-1.2.3 Controls (Electric- or Air-Powered Hoists Only)
16-1.2.4 Rope Sheaves (Electric- or Air-Powered Hoists Only) <\/td>\n<\/tr>\n
26<\/td>\n16-1.2.5 Rope Drum (Electric- or Air-Powered Hoists Only)
16-1.2.6 Ropes (Electric- or Air-Powered Hoists Only)
16-1.2.7 Load Sprockets
16-1.2.8 Load Chain
16-1.2.9 Hooks
16-1.2.10 Load Blocks
16-1.2.11 Brakes <\/td>\n<\/tr>\n
27<\/td>\n16-1.2.12 Hand Chain (Hand-Chain-Operated Hoists Only)
16-1.2.13 Overtravel Restraint (Hand-Chain-Operated Hoists Only)
16-1.2.14 Overtravel Protection (Electric- or Air-Powered Hoists Only)
16-1.2.15 Power Failure Protection (Electric- or Air-Powered Hoists Only)
16-1.2.16 Lubrication
16-1.2.17 Manual
SECTION 16-1.3: INSTALLATION
16-1.3.1 Procedure <\/td>\n<\/tr>\n
28<\/td>\n16-1.3.2 Support
16-1.3.3 Location
16-1.3.4 Power Connections
16-1.3.5 Direction of Motion (Electric- or Air-Powered Hoists Only)
16-1.3.6 Checkpoints <\/td>\n<\/tr>\n
29<\/td>\nChapter 16-2 Inspection and Testing
SECTION 16-2.1: INSPECTION
16-2.1.1 General
16-2.1.2 Inspection Classification
16-2.1.3 Preoperation Inspection
16-2.1.4 Frequent Inspection (See Also Tables 16-2.1.4-1 and 16-2.1.4-2) <\/td>\n<\/tr>\n
30<\/td>\nTables
Table 16-2.1.4-1 Inspection for Hand-Chain-Operated Hoists <\/td>\n<\/tr>\n
31<\/td>\nTable 16-2.1.4-2 Inspection for Electric- or Air-Powered Hoists <\/td>\n<\/tr>\n
32<\/td>\n16-2.1.5 Periodic Inspection (See Also Tables 16-2.1.4-1 and 16-2.1.4-2) <\/td>\n<\/tr>\n
33<\/td>\n16-2.1.6 Hoists Not in Regular Service
16-2.1.7 Inspection Records
SECTION 16-2.2: TESTING
16-2.2.1 Operational Tests
16-2.2.2 Load Test <\/td>\n<\/tr>\n
35<\/td>\nChapter 16-3 Operator Training and Operation
SECTION 16-3.1: OPERATOR TRAINING
16-3.1.1 Purpose of Operator Training
16-3.1.2 Operator Training — General
16-3.1.3 Sources of Training Material
SECTION 16-3.2 TRAINING FOR PERSONS OTHER THAN HOIST OPERATORS
SECTION 16-3.3 OPERATION
16-3.3.1 Scope of Hoist Operation
16-3.3.2 General Requirements to Be Followed During Hoist Operation <\/td>\n<\/tr>\n
36<\/td>\n16-3.3.3 Responsibilities of Management Owners\/Users
16-3.3.4 Responsibilities of Operators <\/td>\n<\/tr>\n
38<\/td>\n16-3.3.5 Responsibilities of Riggers
16-3.3.6 Responsibilities of Signalpersons
SECTION 16-3.4 SIGNALS
16-3.4.1 Standard Signals
16-3.4.2 Hand Signals
SECTION 16-3.5 PLANNED ENGINEERED LIFTS <\/td>\n<\/tr>\n
39<\/td>\nFig. 16-3.4.1-1 Standard Hand Signals for Controlling Hoists <\/td>\n<\/tr>\n
40<\/td>\nSECTION 16-3.6 EQUIPMENT LOCKOUT\/TAGOUT <\/td>\n<\/tr>\n
41<\/td>\nChapter 16-4 Maintenance Training and Maintenance
SECTION 16-4.1: MAINTENANCE TRAINING AND MAINTENANCE REQUIREMENTS
SECTION 16-4.2: MAINTENANCE TRAINING
16-4.2.1 Purpose of Maintenance Training
16-4.2.2 Hoist Maintenance Training — General
16-4.2.3 Sources of Training Material
16-4.2.4 Responsibilities of Maintenance Persons
SECTION 16-4.3 EQUIPMENT MAINTENANCE
16-4.3.1 General Maintenance <\/td>\n<\/tr>\n
42<\/td>\n16-4.3.2 Preventive Maintenance
16-4.3.3 Maintenance Procedure
16-4.3.4 Adjustments, Repairs, and Replacements
16-4.3.5 Lubrication
SECTION 16-4.4: ROPE REPLACEMENT AND MAINTENANCE
16-4.4.1 Rope Replacement <\/td>\n<\/tr>\n
43<\/td>\n16-4.4.2 Rope Maintenance
SECTION 16-4.5: WELDED LINK CHAIN REPLACEMENT AND MAINTENANCE
16-4.5.1 Welded Link Chain Replacement <\/td>\n<\/tr>\n
44<\/td>\n16-4.5.2 Welded Link Chain Maintenance
SECTION 16-4.6: ROLLER CHAIN REPLACEMENT AND MAINTENANCE
16-4.6.1 Roller Chain Replacement
16-4.6.2 Roller Chain Maintenance <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

ASME B30.16 Overhead Underhung and Stationary Hoists<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
ASME<\/b><\/a><\/td>\n2017<\/td>\n45<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":182945,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2643],"product_tag":[],"class_list":{"0":"post-182941","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-asme","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/182941","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/182945"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=182941"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=182941"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=182941"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}