{"id":198431,"date":"2024-10-19T12:37:55","date_gmt":"2024-10-19T12:37:55","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/asme-b30-27-2019\/"},"modified":"2024-10-25T05:10:55","modified_gmt":"2024-10-25T05:10:55","slug":"asme-b30-27-2019","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/asme\/asme-b30-27-2019\/","title":{"rendered":"ASME B30.27 2019"},"content":{"rendered":"
B30.27 applies to the construction, installation, operation, inspection, testing, and maintenance of trailer and truck-mounted material placement systems. Included in this are mechanical and hydraulic pea gravel systems, mobile telescoping boom conveyors, separate placing booms, and material placement accessories. Truck-mounted material placement systems can be either with or without an integral placing boom. This Volume does not apply to conveyor parts of mobile telescoping boom conveyors, mortar conveying or spraying machines, or dry mix shotcreting machines. The conveyor section of these machines is covered by ASME B20.1.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
4<\/td>\n | CONTENTS <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | FOREWORD <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | ASME B30 COMMITTEE ROSTER <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | B30 STANDARD INTRODUCTION <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | ASME B30.27-2019 SUMMARY OF CHANGES <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | Chapter 27-0 Scope, Definitions, References, and Personnel Competence SECTION 27-0.1: SCOPE SECTION 27-0.2: DEFINITIONS <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | SECTION 27-0.3: REFERENCE TO OTHER CODES AND STANDARDS SECTION 27-0.4: PERSONNEL COMPETENCE <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | Figures Figure 27-0.1-1 Material Placement System: Truck-Mounted Boom Pump Figure 27-0.1-2 Material Placement System: Separate Placing Boom Figure 27-0.1-3 Material Placement System: Truck-Mounted Telescopic Conveyor System <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | Figure 27-0.1-4 Material Placement System: City Pump Figure 27-0.1-5 Material Placement System: High-Pressure Trailer Pump Figure 27-0.1-6 Material Placement System: General Purpose Trailer Pump <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | Figure 27-0.1-7 Material Placement System: Ball Valve Pump Figure 27-0.1-8 Material Placement System: Examples of Delivery System Components <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | Chapter 27-1 Construction and Installation SECTION 27-1.1: MARKINGS 27-1.1.1 Placing Boom Rating and Identification Markings 27-1.1.2 Material Placement System Rating and Identification Markings 27-1.1.3 Straight Delivery Pipes Rating and Identification Markings 27-1.1.4 Delivery System Elbow Rating and Identification Markings 27-1.1.5 Delivery System Hose Rating and Identification Markings 27-1.1.6 Safety Signs 27-1.1.7 Hand Signals <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 27-1.1.8 Delivery System Accessory Identification Markings 27-1.1.9 Air Compressor Rating Markings SECTION 27-1.2: MOBILE MATERIAL PLACING BOOM CONSTRUCTION 27-1.2.1 Structural Design and Construction 27-1.2.2 Stability 27-1.2.3 Lifting Attachments 27-1.2.4 Replacement Parts SECTION 27-1.3: WORK PLATFORMS, ACCESS WALKWAYS, AND GANGWAYS SECTION 27-1.4: ELECTRICAL INSTALLATIONS <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | SECTION 27-1.5: ERGONOMICS SECTION 27-1.6: OUTRIGGERS SECTION 27-1.7: CONTROLS AND INDICATORS 27-1.7.1 Emergency Stops 27-1.7.2 Outriggers 27-1.7.3 General Control Requirements 27-1.7.4 Hour Meters 27-1.7.5 Standardized Joystick Movements SECTION 27-1.8: GUARDS SECTION 27-1.9: MOBILE AND STATIONARY PLACING BOOMS 27-1.9.1 Placing Booms <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 27-1.9.2 Boom Tip Attachments SECTION 27-1.10: DELIVERY SYSTEMS 27-1.10.1 Delivery Line 27-1.10.2 Delivery System Components SECTION 27-1.11: LOSS OF POWER SECTION 27-1.12: REMOTE STARTING SECTION 27-1.13: MANUALS Figure 27-1.7.5-1 Standardized Joystick Movement <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | SECTION 27-1.14: TRANSLATION OF TECHNICAL AND SAFETY-RELATED INFORMATION SECTION 27-1.15: FUEL AND EXHAUST SYSTEMS SECTION 27-1.16: HOPPERS SECTION 27-1.17: PUMP PRESSURE RELEASE 27-1.17.1 Reversible Pumps 27-1.17.2 Nonreversible Pumps <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | Figure 27-1.16-1 Grates and Hoppers <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | Chapter 27-2 Inspection, Testing, and Maintenance SECTION 27-2.1: INSPECTION 27-2.1.1 Inspection Classifications 27-2.1.2 Frequent Inspection <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 27-2.1.3 Periodic Inspections 27-2.1.4 Material Placement Systems Not in Regular Use 27-2.1.5 Inspection Records SECTION 27-2.2: TESTING 27-2.2.1 Operational Testing <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 27-2.2.2 Manufacturer\u2019s Stability Test 27-2.2.3 Postmaintenance Test SECTION 27-2.3: MAINTENANCE <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | Chapter 27-3 Operation SECTION 27-3.1: QUALIFICATIONS FOR AND CONDUCT OF OPERATORS AND OPERATING PRACTICES 27-3.1.1 Operators 27-3.1.2 Qualifications for Operators <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 27-3.1.3 Responsibilities <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 27-3.1.4 Conduct of Operators 27-3.1.5 Operating Practices <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 27-3.1.6 Operating of Boom or Conveyor Near Electric Power Lines 27-3.1.7 Cleaning Pipeline <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | Figure 27-3.1.5-1 Area of Extended Outriggers <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 27-3.1.8 Knowledge of Manual Content SECTION 27-3.2: MATERIAL PLACEMENT SYSTEM LOCKOUT\/TAGOUT SECTION 27-3.3: SIGNALS 27-3.3.1 Standard Signals 27-3.3.2 Hand Signals 27-3.3.3 Special Signals 27-3.3.4 Instructions Figure 27-3.1.6.1-1 Danger Zone for Material Placement Systems and Delivery System Operating Near Electrical Transmission Lines <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | Figure 27-3.3.2-1 Material Placement System Hand Signals Table Table 27-3.1.6.3-1 Minimum Required Clearances <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | Chapter 27-4 Separate Placing Booms SECTION 27-4.1: DESIGN AND CONSTRUCTION 27-4.1.1 Placing Boom Rating and Identification Markings 27-4.1.2 Straight Delivery Pipes Rating and Identification Markings 27-4.1.3 Delivery System Elbow Rating and Identification Marking 27-4.1.4 Delivery System Hose Rating and Identification Marking 27-4.1.5 Separate Placing Boom Structural Component Marking 27-4.1.6 Safety Signs 27-4.1.7 Hand Signals 27-4.1.8 Structural Design and Construction <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 27-4.1.9 Stability 27-4.1.10 Lifting Attachments 27-4.1.11 Work Places, Access Walkways, and Gangways 27-4.1.12 Electrical Installations 27-4.1.13 Ergonomics 27-4.1.14 Emergency Stops 27-4.1.15 General Control Requirements <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | Figure 27-4.1.11-1 Common Separate Placing Boom Components <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | 27-4.1.16 Hour Meters 27-4.1.17 Guards 27-4.1.18 Placing Boom 27-4.1.19 Boom Tip Attachments 27-4.1.20 Delivery System Components 27-4.1.21 Delivery Systems 27-4.1.22 Loss of Power 27-4.1.23 Manuals <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | 27-4.1.24 Translation of Technical and Safety-Related Information SECTION 27-4.2: INSPECTION, TESTING, AND MAINTENANCE 27-4.2.1 Inspection 27-4.2.2 Testing <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | 27-4.2.3 Maintenance SECTION 27-4.3: OPERATION 27-4.3.1 Qualifications for and Conduct of Operators and Operating Practices 27-4.3.2 Responsibilities 27-4.3.3 Conduct of Operators 27-4.3.4 Operating Practices 27-4.3.5 Operating of Boom Near Electric Power Lines 27-4.3.6 Cleaning of Pipeline 27-4.3.7 Lockout\/Tagout 27-4.3.8 Signals <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" ASME B30.27-2019 Material Placement Systems<\/b><\/p>\n |