{"id":29872,"date":"2024-10-17T03:23:06","date_gmt":"2024-10-17T03:23:06","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/asme-b30-12-06\/"},"modified":"2024-10-24T14:15:35","modified_gmt":"2024-10-24T14:15:35","slug":"asme-b30-12-06","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/asme\/asme-b30-12-06\/","title":{"rendered":"ASME B30.12 06"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
4<\/td>\n | CONTENTS FIGURES <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | TABLE <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | FOREWORD <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | COMMITTEE ROSTER <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | B30 STANDARD INTRODUCTION SECTION I: SCOPE SECTION II: SCOPE EXCLUSIONS SECTION III: PURPOSE SECTION IV: USE BY REGULATORY AGENCIES SECTION V: EFFECTIVE DATE <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | SECTION VI: REQUIREMENTS AND RECOMMENDATIONS SECTION VII: USE OF MEASUREMENT UNITS SECTION VIII: REQUESTS FOR REVISION SECTION IX: REQUESTS FOR INTERPRETATION SECTION X: ADDITIONAL GUIDANCE <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | Chapter 12-0 Scope, Definitions, and References SECTION 12-0.1: SCOPE OF B30.12 SECTION 12-0.2: DEFINITIONS 12-0.2.1 Rotorcraft External Load Classifications 12-0.2.2 General Definitions <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 1 Hook With Closed Throat Load Beam <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 2 Hook With Open Throat Load Beam <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | SECTION 12-0.3: REFERENCES <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | Chapter 12-1 External Load Ratings and Characteristics SECTION 12-1.1: LOAD RATINGS 12-1.1.1 Rotorcraft 12-1.1.2 External Load Attaching Means 12-1.1.3 Primary Hooks 12-1.1.4 Hoist 12-1.1.5 Sling Materials SECTION 12-1.2: LOAD CHARACTERISTICS <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | Chapter 12-2 Lifting Components SECTION 12-2.1: PRIMARY CARGO HOOKS 12-2.1.1 System Requirements 12-2.1.2 Multiple Primary Hooks SECTION 12-2.2: HOIST\/WINCH 12-2.2.1 Construction 12-2.2.2 Load Rating 12-2.2.3 Load Markings <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 12-2.2.4 Limit Switches 12-2.2.5 Breaking Strength 12-2.2.6 Rope Marking 12-2.2.7 Rope Attachment 12-2.2.8 Storage SECTION 12-2.3: ROTORCRAFT SECTION 12-2.4: SLINGS 12-2.4.1 Types of Slings 3 Vertical Hitch 4 Two-Leg Sling <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 12-2.4.2 Sling Materials 12-2.4.3 Sling Strength 5 Three-Leg Sling 6 Four-Leg Sling <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 7 Two-Leg Spreader Sling 8 Four-Leg Spreader Sling 1 Determining Sling Strength <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | Chapter 12-3 Inspection and Maintenance SECTION 12-3.1: ROTORCRAFT INSPECTION AND MAINTENANCE SECTION 12-3.2: PRIMARY HOOKS AND ATTACHING MEANS INSPECTION AND MAINTENANCE 12-3.2.1 Inspection 12-3.2.2 Maintenance SECTION 12-3.3: HOIST AND HOIST ROPE INSPECTION AND MAINTENANCE SECTION 12-3.4: SLING INSPECTION, REPLACEMENT, AND MAINTENANCE 12-3.4.1 Sling Inspection 12-3.4.2 Rope or Chain Maintenance <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | Chapter 12-4 Operations SECTION 12-4.1: PILOTS AND CREW 12-4.1.1 Pilots 12-4.1.2 Crew SECTION 12-4.2: PILOT QUALIFICATIONS 12-4.2.1 General Qualification 12-4.2.2 Load-Handling Qualification 12-4.2.3 External Load Qualification SECTION 12-4.3: SIGNALPERSON QUALIFICATIONS AND RESPONSIBILITIES 12-4.3.1 Precision Lifts 12-4.3.2 General Lifts 12-4.3.3 Radio Communication 12-4.3.4 Hand Signals 12-4.3.5 Rigging and Emergency Procedures 12-4.3.6 Responsibility <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 9 Helicopter Hand Signals <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | SECTION 12-4.4: OPERATING PRACTICES 12-4.4.1 Preflight Inspection 12-4.4.2 Logs 12-4.4.3 Operational Test 12-4.4.4 Plans 12-4.4.5 Personal Protective Equipment 12-4.4.6 Hazard Surveillance 12-4.4.7 Rigging Authority 12-4.4.8 Work Area Clearance 12-4.4.9 Refueling 12-4.4.10 Suspending Operations <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 12-4.4.11 Evacuation 12-4.4.12 Operating Near Electrical Power Lines 12-4.4.13 Pre-Job Coordination: Pilot-in-Command and Signalpersons 12-4.4.14 Pre-Job Coordination: Rotorcraft Operator and Contractor <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 12-4.4.15 Pre-Job Coordination: Instructions to the Ground Crew 12-4.4.16 Transportation of Ground Crew 10 Personnel Approach\/Departure Path (Level Ground) 11 Personnel Approach\/Departure Path (Sloping Ground) 12 Personnel Approach\/Departure With Tools <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 12-4.4.17 Precautions to Prevent Hazards to Rotorcraft and Ground Personnel <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | Chapter 12-5 Handling the Load SECTION 12-5.1: HOOKING AND UNHOOKING LOADS SECTION 12-5.2: TAG LINES SECTION 12-5.3: ATTACHMENT METHODS 13 Helicopter Station <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | Chapter 12-6 Signals and Communication SECTION 12-6.1: SIGNAL SYSTEMS 12-6.1.1 General 12-6.1.2 Hand Signal Communication 12-6.1.3 Signalperson Identification 12-6.1.4 Radio Communication 12-6.1.5 Secondary Communication 12-6.1.6 Regulatory Requirements SECTION 12-6.2: PERSONNEL SECTION 12-6.3: HUMAN EXTERNAL CARGO COMMUNICATIONS <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | Chapter 12-7 Fueling and Ground-Based Facilities at the Work Area SECTION 12-7.1: FUELING OPERATIONS 12-7.1.1 Regulatory Requirements 12-7.1.2 Equipment 12-7.1.3 Bonding 12-7.1.4 Ignition Hazards 12-7.1.5 Fire Extinguishers SECTION 12-7.2: PERSONNEL TRAINING 12-7.2.1 Fueling Training 12-7.2.2 Fire Training 12-7.2.3 Ignition Hazards SECTION 12-7.3: GROUND-BASED FACILITIES ARRANGEMENT 12-7.3.1 Clearances 12-7.3.2 Grades 12-7.3.3 Wind Indicator 12-7.3.4 Wheel Chocks 12-7.3.5 Warning Signs 12-7.3.6 Dust Control 12-7.3.7 Debris <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | How can you reach us? <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" ASME B30.12 Handling Loads Suspended From Rotorcraft <\/b><\/p>\n |