Shopping Cart

No products in the cart.

AABC NationalStandards 7thEdition 2021

$46.04

AABC National Standards for Total System Balance, 7th Edition

Published By Publication Date Number of Pages
AABC 2021 546
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

The 7th Edition of AABC’s National Standards for Total System Balance is now available! Completely rewritten and reorganized, the Standard is also the first AABC standard to achieve designation as an approved American National Standard through ANSI. This comprehensive manual details the minimum standards for total system balance. The Standards will assist the design professional in achieving design intent, provide a better understanding of the scope of work required of the TAB agency, and ensure that proper methods and procedures are followed in the test and balance process.

PDF Catalog

PDF Pages PDF Title
1 Cover
3 Copyright
4 Preface
5 Acknowledgements
6 Table of Contents
8 Chapter 1. Total System Balancing
1.1 Purpose
1.2 Scope
1.3 Overview
9 1.4 Design Phase
1.5 Construction Phase
1.6 Total System Balancing Phase
10 1.7 The Report
23 1.8 Final Acceptance
24 Chapter 2. Instrumentation and TAB Tolerances
2.1 Overview
2.2 Terminology
26 2.3 Temperature Measuring Instruments
28 2.4 Air Measuring Instruments
34 2.5 Hydronic Pressure Measuring Instruments
36 2.6 Electrical Measuring Devices
37 2.7 Rotational Speed Measuring Instruments
38 2.8 Test and Balance Tolerances
40 Chapter 3. Airside Volume Measurement
3.1 Overview
3.2 Pitot Tube Traverses
47 3.3 Density Correction
48 3.4 Anemometer Coil Traverse
50 3.5 Flow Factors for Airflow Measuring Devices
51 3.6 Airflow Measuring Stations
3.7 Measured System Static Pressure
52 3.8 Fan Curves
53 3.9 System Effect
54 3.10 Diversity
55 3.11 References
56 Chapter 4. Basic Measurements
4.1 Overview
4.2 Rotational Measurements
61 4.3 Electrical Measurements
66 4.4 Temperature Measurements
68 4.5 Electric Duct Heaters
70 Chapter 5. Leakage Testing
5.1 Overview
71 5.2 Test Equipment
72 5.3 Test Parameters
73 5.4 Testing Procedures
74 5.5 Report Data
5.6 AHU Pressure Testing
75 5.7 Rooms, Floor and Building Pressure Testing
76 5.8 References
78 Chapter 6. The Foundation of Total System Balancing
6.1 Overview
6.2 Document Review
79 6.3 Construction Observation
81 6.4 System Components
83 6.5 Developing the Data Sheets
86 6.6 Contractors’ Responsibilities Prior to Balancing
88 6.7 Pre-Balance Site Review
90 6.8 Economizer Cycle Testing
92 Chapter 7. Constant Volume Systems
7.1 Overview
7.2 Incremental and Stand-Alone Components
93 7.3 Basic Fan System
95 7.4 Constant Volume Air Handling Units
98 7.5 Multi-Zone Units
103 7.6 Constant Volume Single Duct Systems
110 7.7 Dual Duct Constant Volume System
112 7.8 High-Pressure System with Induction Units
116 Chapter 8. Terminal Boxes for Constant Volume and Variable Systems
8.1 Overview
8.2 Single Duct Constant Primary, Constant Secondary
117 8.3 Single Duct Variable Primary, Variable Secondary
119 8.4 Single Duct Constant Primary, Variable Secondary Bypass Systems
120 8.5 Single Duct Variable Primary, Constant Secondary Induction Systems
122 8.6 Single Duct Variable Primary/Constant Secondary Fan Powered Series Terminal boxes
124 8.7 Variable Primary/Variable Secondary Fan Powered Parallel Terminal Box
126 8.8 Dual Duct Terminal boxes
128 Chapter 9. Variable Volume
9.1 Overview
9.2 Single Duct Air Valve with Variable Primary, Variable Secondary
131 9.3 Bypass Air Valve Constant Primary, Variable Secondary Bypass Systems
134 9.4 Variable Primary/Constant Secondary Fan Powered Series Terminal Boxes
137 9.5 Variable Primary/Variable Secondary Fan Powered Parallel Terminal Box
141 9.6 Dual Duct Variable Volume
144 9.7 Fan Wall Systems
9.8 Underfloor Air Distribution Systems
152 Chapter 10. Fan Systems: Supply/Return/Relief/Exhaust
10.1 Overview
10.2 Air Handling Unit Systems
155 10.3 Utility Vent Sets
159 10.4 Tubular Centrifugal Fans
160 10.5 Power Roof Ventilators
162 10.6 Propeller Fans
163 10.7 Axial Fans
164 10.8 Variable Volume
165 10.9 Manifolded Systems
168 Chapter 11. Energy Recovery Systems/Panels/Chilled Beams
11.1 OVERVIEW
11.2 Rotating Wheel and Rotating Desiccant Wheel
170 11.3 Air-to-Air Plate Heat Recovery Units
174 11.4 Thermosiphon Heat Exchangers
176 11.5 Run Around Coil
178 11.6 Panels Used for Sensible Heating and Cooling
11.7 Chilled Beams
180 11.8 References
182 Chapter 12. Temperature Control Systems
12.1 Overview
12.2 Basic Verification of Controls
183 12.3 Verification and Documentation
188 Chapter 13. Hydronic Pumps and Pumping Circuits
13.1 Overview
13.2 Pump Head Measurement
189 13.3 Verification of Impeller Size
191 13.4 Determine Pump Flow
194 13.5 Piping Circuits
199 13.6 Pump Circuits
202 Chapter 14. Hydronic Devices
14.1 Hydronic Devices
221 14.2 Hydronic Flow Measuring
228 Chapter 15. Hydronic Procedures
15.1 Overview
15.2 Hydronic System Readiness
229 15.3 Constant Volume Water Balancing Procedure (Two-Pipe System, Direct or Reverse Return)
232 15.4 Variable Volume Water Balancing Procedure
235 15.5 Heating Terminal Temperature Balance
15.6 Steam
237 15.7 Capacity Testing
238 Chapter 16. Chiller Testing
16.1 Overview
16.2 Basic Testing
240 16.3 Field Performance Testing Of Chillers
246 Chapter 17. Cooling Tower Testing
17.1 Overview
17.2 Basic Test
247 17.3 Performance Test Parameters
251 17.4 AABC Performance Test
252 17.5 CTI Performance Test
264 Chapter 18. Boiler Testing
18.1 Overview
18.2 Basic Test for Hot Water Boilers
265 18.3 Boiler Performance Calculations
266 18.4 Efficiency Test
18.5 Boiler Testing Procedures
270 Chapter 19. Domestic Water Balance Preparation & Procedures
19.1 Overview
19.2 Document Review
19.3 Plan Review
271 19.4 Submittal Review
19.5 Domestic Hot Water Test Plan
272 19.6 Instrumentation
273 19.7 Testing Procedure for Domestic Hot Water Systems
274 Chapter 20. Kitchen Systems
20.1 Overview
20.2 The Heating, Cooling, and Ventilating System
275 20.3 Kitchen Hoods
282 20.4 Hoods With Make-Up Air Provisions
283 20.5 Final Balance Procedures
20.6 References
284 Chapter 21. Laboratory Systems (Constant Volume & Variable Volume
21.1 Overview
21.2 Terminology
286 21.3 Testing the Lab Exhaust
287 21.4 Testing the Lab Supply
21.5 Pressurization
288 21.6 Testing Exhaust Systems
289 21.7 Testing Supply Systems
21.8 Stack Velocity
21.9 Tracking the Systems and Certifying
291 21.10 Bio-safety Cabinets
21.11 References
292 Chapter 22. Sound
22.1 Overview
22.2 Sound Measuring Instruments
293 22.3 Sound Rating Methods
296 22.4 Acceptable Noise
298 22.5 Testing Procedures for Measuring Sound Levels
300 Chapter 23. Vibration Testing
23.1 Overview
23.2 Vibration Meters
301 23.3 Test Points
302 23.4 Testing Procedures for Vibration Measurements
306 Chapter 24. Smoke Control Testing
24.1 Overview
24.2 Basic Testing
307 24.3 Smoke Control Acceptance Testing
308 24.4 Testing Procedures for Smoke Control Systems
310 24.5 Atriums
311 24.6 References
312 Chapter 25. Testing and Balancing Health Care Facilities
25.1 Overview
25.2 Pressurization
321 25.3 Procedures for Measuring Room Pressures
322 25.4 Smoke Testing for Direction of Airflow
25.5 Reporting Procedures for ORs, AII Rooms and PE Rooms
25.6 Heating
323 25.7 Outdoor Air Intakes and Exhaust Discharge
25.8 Filtration
25.9 References
326 Chapter 26. HVAC Commissioning
26.1 Overview
327 26.2 HVAC Commissioning Plan
328 26.3 Terminology
329 26.4 Schedule of HVAC Commissioning
332 26.5 References
334 Chapter 27. Specification
27.1 Overview
27.2 Contractor’s Responsibility Specification
339 27.3 Sample Testing and Balance Specification
348 Chapter 28. Report Analysis & Verification
28.1 Overview
28.2 What a Report Provides
28.3 Using A Report
350 28.5 Verification
352 Appendices
APPENDIX A – Sample Test & Balance Report Forms
354 Title Page
355 Table of Contents
356 Report Summary
357 Instrument List
358 Air Moving Equipment Data
359 Static Pressure Profile
360 Fan Data
361 Duct Traverse Data
362 Air Flow Station Data
363 Air Distribution Data
364 Terminal Unit Data
365 Induction Unit Data
366 Temperature Reading Data
367 Electric Duct Heater Data
368 Pump Data
369 Water Balance Data
370 Water Flow Measuring Station Data
371 Cooling Coil Data
372 Direct Expansion Cooling Coil Data
373 Heating Coil Data
374 Cooling Tower Data
375 Chiller Data
376 Air Cooled Chiller Data
377 Hot Water Boiler Data
378 Steam Boiler Data
379 Steam Heat Exchanger Data
380 Control Verification Data
381 Sequence of Operation Functional Performance Test
382 Input/Output Device Functional Performance Test
383 Fume Hood Test Data
384 Kitchen Hood Data
385 Duct Leakage Test Data
386 APPENDIX B – Density Correction Tables
387 Density Correction For Temperature at 29.92° Barometric Pressure
391 Density Correction For Altitude
396 APPENDIX C – Anemometer Traverse Sample Form
397 Coil Traverse With Rotating Vane
400 APPENDIX D – Static Pressure Measuring Points
402 Air Handling Unit Schematic
403 Points at Which to Measure Static Pressure in a Constant-Volume, SingleSystem
404 Points at Which to Measure Static Pressure in a Constant-Volume, Multi-Zone System
405 Points at Which to Measure Static Pressure in a Constant-Volume, Reheat System
406 Points at Which to Measure Static Pressure in a Single Duct Variable Primary, Constant
Secondary Induction System
407 Points at Which to Measure Static Pressure in a Pressure-Independent Single Duct Constant
Primary, Constant Secondary System
408 Points at Which to Measure Static Pressure in a Constant Volume, Pressure-Independant Dual
Duct System
409 Points at Which to Measure Static Pressure in a Single Duct, Variable Primary/Variable Secondary, Pressure-Dependent VAV System
410 Points at Which to Measure Static Pressure in a Single Duct, Variable Primary/Variable
Secondary, Pressure-Independent VAV System
411 Points at Which to Measure Static Pressure in a Single Fan Dual Duct, Variable Primary/
Variable Secondary, Pressure-Independent VAV
412 Points at Which to Measure Static Pressure in a Variable Primary, Constant Secondary,
Pressure-Independent Series, Fan-Powered Terminal VAV System
413 Points at Which to Measure Static Pressure in a Variable Primary/ Constant Secondary,
Pressure-Dependent Series, Fan-Powered Terminal VAV System
414 Points at Which To Measure Static Pressure in a Variable Primary/ Variable Secondary,
System-Powered Bladder Terminal VAV
415 Points at Which to Measure Static Pressure in a Constant Primary/Variable Secondary Bypass
VAV System
416 Points at Which to Measure Static Pressure in a Variable Primary/Variable Secondary,
Pressure-Independent Fan-Powered Parallel Terminal Box VAV System
417 Points at Which to Measure Static Pressure in a Return Fan System
418 APPENDIX E – Enthalpy Chart, Btu/lb. Air (Saturated)
420 APPENDIX F – Determining Net Positive Suction Head
422 APPENDIX G – Water Temperature Drop vs. Entering Temperature Differential
424 APPENDIX H – Instrumentation Verification Records
425 Record of Verifying Calibration Check Points: Rotating Vane Anemometer
426 Record of Verifying Calibration Check Points: Laser Tachometer
427 Record of Verifying Calibration Check Points: Multimeter
428 Record of Verifying Calibration Check Points: Digital Flow Hood
429 Record of Verifying Calibration Check Points: Strobe Tachometer
430 Record of Verifying Calibration Check Points: Thermometer
431 Record of Verifying Calibration Check Points: Contact Tachometer
432 Record of Verifying Calibration Check Points: Hydrodata Multimeter – Water Meter
436 Tower Test Curve at 79°F Approach vs. Heat Rejection
438 APPENDIX J – Cooling Tower Performance Test – CTI Procedure for Forced-Draft Tower
452 APPENDIX K – Cooling Tower Performance Test – CTI Procedure for Induced-Draft Tower
468 APPENDIX L – Cooling Tower Performance Test Forms For Procedures Identified in Appendix I, J, and K
469 Cooling Tower Test Report: Summary Sheet
470 Cooling Tower Test Report: Pitot Tube Water Flow Measurement Under 18 Inches Diameter
471 Cooling Tower Test Report: Pitot Tube Water Flow Measurement Over 18 Inches Diameter
472 Cooling Tower Test Report: Wet Bulb Temperatures
473 Cooling Tower Test Report: Entering and Leaving Water Temperatures
474 Cooling Tower Test Report: Break Horsepower and Wind
475 Cooling Tower Test Report: Make-Up Water GPM and Temperature, Pump Pressure, Dry-Bulb Temperature, Barometric Pressure
476 Cooling Tower Test Report: Forced Draft Tower
479 Cooling Tower Test Report: Induced Draft Tower
482 APPENDIX M – Tables for Saturated Steam
483 Table for Saturated Steam (IP) by Temp °F
484 Table for Saturated Steam (IP) by ABS Pressure In Mercury
485 Table for Saturated Steam (IP) by ABS Pressure In LB. SQ. IN
486 Table for Saturated Steam (SI) by Temp °C
487 Table for Saturated Steam (SI) by kPa
488 APPENDIX N – Vibration Test Sheets
489 Vibration Test Sheet: Air Handling Unit
490 Vibration Test Sheet: Centrifugal Fan
491 Vibration Test Sheet: End Suction Pump
492 Vibration Test Sheet: Horizontal Split Case Pump
493 Vibration Test Sheet: In-Line Fan
494 Vibration Test Sheet: Utility Fan
495 Vibration Test Sheet: Vaneaxial Fan
496 APPENDIX O – Common Metric Conversions
498 APPENDIX P – SI Equation Conversions
520 Index
AABC NationalStandards 7thEdition 2021
$46.04