ACI 376 2023
$71.23
ACI CODE-376-23: Refrigerated Liquefied Gas Containment for Concrete Structures—Code Requirements and Commentary
Published By | Publication Date | Number of Pages |
ACI | 2023 | 177 |
Keywords: bund wall; commissioning; cryogenic; damage stability; decommissioning; earthquake design levels; fatigue; float out; floating storage unit; foundation heating; gravity base structure; impact loads; liners; liquefied natural gas; liquid stratification; permanent ballast; purging; refrigerated liquefied gas; reinforcement (cryogenic); tanks; thermal corner protection.
PDF Catalog
PDF Pages | PDF Title |
---|---|
3 | TITLE PAGE |
6 | INTRODUCTION |
7 | CHAPTER 1—GENERAL REQUIREMENTS 1.1—Scope |
8 | 1.2—Quality assurance |
9 | 1.3—Engineer |
10 | CHAPTER 2—NOTATION AND DEFINITIONS 2.1—Notation |
11 | 2.2—Definitions |
18 | CHAPTER 3—REFERENCED STANDARDS |
21 | CHAPTER 4—MATERIALS 4.1—Testing of materials 4.2—Cementitious materials 4.3—Aggregates |
22 | 4.4—Water 4.5—Admixtures 4.6—Fibers |
23 | 4.7—Deformed reinforcing bars |
24 | 4.8—Plate steel composite with concrete 4.9—Prestressed reinforcement |
25 | 4.10—Prestressing anchorages 4.11—Post-tensioning ducts 4.12—Grout |
26 | 4.13—Metal liners and nonstructural metal components 4.14—Insulation |
27 | 4.15—Coating requirements |
28 | CHAPTER 5—DESIGN LOADS, LOADING CONDITIONS, AND LOAD COMBINATIONS 5.1—General 5.2—Design loads |
33 | 5.3—Loading conditions |
34 | 5.4—Load combinations |
36 | CHAPTER 6—MINIMUM PERFORMANCE REQUIREMENTS 6.1—General |
37 | 6.2—Primary concrete container |
39 | 6.3—Secondary concrete container |
49 | 6.4—Roof performance criteria 6.5—Other performance criteria 6.6—Concrete quality |
54 | 6.7—Shotcrete 6.8—Coating requirements |
55 | 6.9—Metal components |
56 | CHAPTER 7—LOAD FACTORS 7.1—General 7.2—Load factors for ultimate limit state |
60 | 7.3—Load factors for serviceability limit state |
61 | CHAPTER 8—ANALYSIS AND DESIGN 8.1—Methods of analysis |
68 | 8.2—Container design basis |
69 | 8.3—Foundation design |
70 | 8.4—Wall design |
73 | 8.5—Roof design |
75 | 8.6—Horizontal shear transfer in composite construction |
76 | CHAPTER 9—DETAILING 9.1—General 9.2—Reinforcement details |
78 | 9.3—Internal prestressing systems |
79 | 9.4—External prestressing systems 9.5—Concrete containment wall |
81 | 9.6—Metal components |
82 | 9.7—Anchorage to concrete |
83 | 9.8—Liners and coatings |
85 | CHAPTER 10—FOUNDATIONS 10.1—General |
86 | 10.2—Geotechnical investigation |
89 | 10.3—Design requirements for shallow foundations |
92 | 10.4—Design requirements for deep foundations |
96 | 10.5—Ground improvement |
97 | 10.6—Foundation details |
99 | 10.7—Foundation performance monitoring details |
100 | 10.8—Monitoring frequency |
102 | 10.9—Inspection and testing |
104 | CHAPTER 11—CONSTRUCTION REQUIREMENTS 11.1—Construction plan 11.2—Tolerances |
107 | 11.3—Shotcrete for external prestressing systems |
108 | 11.4—Post-tensioning |
112 | 11.5—Winding of prestressed reinforcement: wire or strand |
113 | 11.6—Forming |
114 | 11.7—Construction joints |
115 | 11.8—Concrete embedments 11.9—Coatings 11.10—Welding |
116 | CHAPTER 12—TESTING, COMMISSIONING AND DECOMMISSIONING 12.1—Scope 12.2—Testing |
120 | 12.3—Pressure and vacuum testing 12.4—Purging into service |
122 | 12.5—Cool-down |
124 | 12.6—Settlement and movement monitoring |
125 | 12.7—Tank fill methods 12.8—Decommissioning: purging out of service and warm-up |
127 | 12.9—Recordkeeping 12.10—Nameplate |
129 | APPENDIX A—TANK CONFIGURATIONS, DETAILS, AND EXAMPLES RA.1—Tank configurations RA.2—Full-containment tanks: typical details RA.3—Examples of base joint details |
140 | APPENDIX B—OFFSHORE CONCRETE TERMINALS B.1—Scope B.2—General |
141 | B.3—Loads and load combinations |
144 | B.4—Concrete and reinforcement materials |
145 | B.5—Global and local structural analysis |
147 | B.6—Criteria and methodology of concrete sectional design B.7—Fatigue performance criteria |
148 | B.8—Design considerations during construction, transportation, and installation |
151 | B.9—Decommissioning B.10—Design for accidents |
154 | APPENDIX C—FATIGUE PERFORMANCE C.1—Scope C.2—General C.3—Fatigue performance criteria |
158 | APPENDIX D—REQUIREMENTS FOR OUTER CONCRETE CONTAINER FOR MEMBRANE TANKS D.1—General requirements |
159 | D.2—Notation and definitions D.3—Referenced standards D.4—Materials D.5—Design loads, loading conditions, and load combinations |
160 | D.6—Minimum performance requirements |
163 | D.7—Load factors |
165 | D.8—Analysis and design D.9—Detailing D.10—Foundations D.11—Construction requirements D.12—Testing commissioning and decommissioning |
166 | COMMENTARY REFERENCES |
169 | Authored documents |