Shopping Cart

No products in the cart.

AS/RISSB 7718:2017

$77.35

Signal Design Process Management

Published By Publication Date Number of Pages
AS 2017-01-25 36
Guaranteed Safe Checkout
Categories: ,

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

The objective of this standard is to provide the Australian rail industry with a set of mandatory and recommended requirements for the signalling design management process. The main purpose is to promote a consistent approach to the signalling design process across the Australian rail industry. This Standard specifies the process for the production of signalling designs for use on the rail networks. This document describes the process for complete signalling system design from concept through detailed design, construction, installation, test and commissioning and final as-built documentation. It describes a process which can be part of a wider engineering project, or which can be implemented as a stand-alone signalling engineering activity.

AS/RISSB 7718:2017
$77.35