ASHRAE CommissioningStakeholdersGuide 2018
$45.50
Commissioning Stakeholders’ Guide
Published By | Publication Date | Number of Pages |
ASHRAE | 2018 | 124 |
The Commissioning Stakeholders’ Guide consolidates best practices, sample documentation, and more than 50 project checklists in a practical and applicable resource for this critical aspect of a new construction project.Using ASHRAE Guideline 0 and ASHRAE/IES Standard 202, this guide provides concise guidance and step-by-step requirements for new construction commissioning for owners, designers, and project managers. Systems, including those found in commercial, medical, industrial, and education facilities, are described in detail. Every facet of the commissioning process is outlined, from project initiation to the final commissioning report.Commissioning Stakeholders’ Guide was co-published by ASHRAE, the leading organization in the sustainable built environment, and BCxA, the authority on building commissioning.
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | CommissioningStakeholders’Guide |
6 | Contents |
10 | Checklists |
12 | Acknowledgments |
14 | Preface |
16 | Chapter 1—Strategic Guide to theCommissioning Process Introduction to the Commissioning Process Strategic Overview |
17 | Use of the Commissioning Process Value and Benefits of Commissioning |
19 | Performance Requirements |
20 | Commissioning Provider Characteristics |
21 | Commissioning Expectations References |
22 | Chapter 2—New ConstructionCommissioning ProcessActivities andDocumentation The Commissioning Process for New Construction |
24 | New Construction Commissioning Process Activities and Deliverables Commissioning Process Documentation Overview Owner’s Project Requirements |
25 | Table 2.1 New Construction Commissioning Process Activities, Deliverables, andResponsibilities |
26 | The Basis of Design Commissioning Plan Commissioning Specifications Design Review Report Record Documents |
27 | Systems Manual Preliminary Commissioning Report Final Commissioning Report |
28 | Roster of Participants and Stakeholders References |
29 | Table 2.2 Commissioning Process Responsibilities by Activity |
30 | Table 2.3 Commissioning Team Contact List |
32 | Chapter 3—Stakeholder/Participant Roles and Responsibilities New Construction Commissioning Process Responsibility by Document Stakeholder Project Phase Involvement Stakeholder Roles and Responsibilities Summary Owner/Owner’s Representative |
33 | Table 3.1 Commissioning Documents |
35 | Architect Engineer Contractor/Construction Manager Table 3.2 Commissioning Team Members by Phase (Stum and Bjornskov 2017) |
36 | Subcontractors and Installers Manufacturer and Supplier Commissioning Provider LEED® or Program Administrator Stakeholder Duties and Functions |
37 | Owner/Owner’s Representative |
38 | Architect |
39 | Design Engineers (Mechanical, Elecctrical, Plumbing, Enclosure, and Others Included in the Design Process) Contractor/Construction Manager |
41 | Subcontractor and Installer Manufacturer and Supplier |
42 | Commissioning Provider |
43 | LEED or Program Administrator References |
44 | Table 3.3 Owner’s Roles and Responsibilities Checklist |
45 | Table 3.4 Architect’s Roles and Responsibilities Checklist |
46 | Table 3.5 Design Engineer Roles and Responsibilities Checklist |
47 | Table 3.6 Contractor/Construction Manager Roles and Responsibilities Checklist |
48 | Table 3.7 Subcontractor and Installer Roles and Responsibilities Checklist |
49 | Table 3.8 Manufacturer and Supplier Roles and Responsibilities Checklist |
50 | Table 3.9 Commissioning Provider Roles and Responsibilities Checklist |
51 | Table 3.10 LEED® or Program Administrator Roles and Responsibilities Checklist |
52 | Chapter 4—Commissioning for Codes and Standards Requirements Basic Commissioning Process to Code Requirements Commissioning Application for Construction Projects Using IECC |
53 | Building Official and AHJ Role in Commissioning Commissioning Process for Building Permit |
54 | Commissioning Checklist for Permit IECC Commissioning Documentation for Final Inspection and Certificate of Occupancy |
55 | Table 4.1 Commissioning Documentation for Permit |
56 | Commissioning Report Outlines References |
57 | Table 4.2 Commissioning Documentation for Final Inspection and Certificate of Occupancy |
58 | Chapter 5—Building System Selectionfor Commissioning Basic Commissioning Activities Building System Commissioning Checklists |
59 | Table 5.1 Commercial and Office Buildings—Systems to Commission |
60 | Table 5.2 Medical Buildings and Hospitals—Systems to Commission |
61 | Table 5.3 Educational Facilities—Pre-K–12 Schools—Systems to Commission |
62 | Table 5.4 College and University Facilities—Systems to Commission |
63 | Table 5.5 Municipal and State Buildings—Systems to Commission |
64 | Table 5.6 Federal Buildings—Systems to Commission |
65 | Table 5.7 Industrial Facilities—Systems to Commission |
66 | Table 5.8 High-Rise Residential Buildings—Systems to Commission |
67 | Table 5.9 Retail Buildings and Areas—Systems to Commission |
68 | Table 5.10 Justice Buildings—Systems to Commission |
70 | Chapter 6—Building System Commissioning Requirements Commissioning Major Specialty Task Selection Building Enclosures Air-Conditioning and Ventilation Systems |
71 | Plumbing Systems Electric Power Systems Lighting and Control Systems Energy Monitoring and Management Systems Indoor Environmental Quality Landscape Irrigation Systems |
72 | Fire Protection Systems Fire Alarm Systems Vertical Transportation Systems On-Site Energy Generation Systems Telephone and Communication Systems References |
73 | Table 6.1 Building Enclosure Commissioning |
74 | Table 6.2 Air-Conditioning and Ventilation Systems Commissioning |
76 | Table 6.3 Plumbing Commissioning |
77 | Table 6.4 Electrical Power Systems Commissioning |
78 | Table 6.5 Lighting and Control Systems Commissioning |
79 | Table 6.6 Energy Monitoring and Management Commissioning |
80 | Table 6.7 Indoor Environmental Quality Commissioning |
81 | Table 6.8 Landscape Irrigation Systems Commissioning |
82 | Table 6.9 Fire Protection Systems Commissioning |
83 | Table 6.10 Fire Alarm Systems Commissioning |
85 | Table 6.11 Vertical Transportation Systems Commissioning |
86 | Table 6.12 On-Site Energy Generation System Commissioning |
87 | Table 6.13 Telephone and Communication Systems Commissioning |
88 | Chapter 7—Selecting and Hiring a Commissioning Provider Guidelines for Qualifications and Independence of Approved Commissioning Providers |
89 | Qualifications-Based Selection Owners and Commissioning Providers: You Need QBS |
92 | References |
94 | Appendix A—Commissioning Process Definitions and Resources Commissioning Definitions (ASHRAE/IES Standard 202) |
96 | Commissioning Organizations and Resources REFERENCE |
98 | Appendix B—Commissioning Process Documentation: New Construction Checklists New Construction Commissioning Documentation Checklists Owner’s Project Requirements (OPR) Document OPR Documentation Development |
99 | Commissioning Plan Commissioning Plan Contents |
100 | Basis of Design (BoD) |
101 | Commissioning Specifications Specifications for the Commissioning Process Project Documents, Submittal Review, and Reports |
102 | Design Submissions |
104 | Construction Observation, Testing, Checklists, and Reports |
105 | Issues and Resolution Log Contents Systems Manual |
106 | Training Plan and Records Commissioning Process Reports and Testing Records References |
108 | Table B.1 Commissioning Documentation |
109 | Table B.2 Owner’s Project Requirements |
110 | Table B.3 Preliminary Commissioning Plan |
111 | Table B.4 Final Commissioning Plan |
112 | Table B.5 Basis of Design |
113 | Table B.6 Commissioning Specifications in Construction Documents |
114 | Table B.7 Design Review Commissioning |
115 | Table B.8 Commissioning Submittal Review |
116 | Table B.9 Commissioning Observation and Testing Report |
117 | Table B.10 Equipment and Assemblies Tested |
118 | Table B.11 Sample Commissioning Issues and Resolution Log |
119 | Table B.12 Commissioning Issues and Resolution Log |
120 | Table B.13 Systems Manual |
121 | Table B.14 Training Plan |
122 | Table B.15 Commissioning Documentation for Final Inspection and Certificate of Occupancy |
123 | Table B.16 Final Commissioning Report |