ASME B30.2 2022
$98.04
ASME B30.2 – 2022 Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist
Published By | Publication Date | Number of Pages |
ASME | 2022 | 46 |
Volume B30.2 includes provisions that apply to the construction, installation, operation, inspection, and maintenance of hand-operated and power-driven overhead and gantry cranes that have a top-running single girder or multiple girder bridge, with one or more top-running trolley hoists used for vertical lifting and lowering of freely suspended, unguided loads consisting of equipment and materials.
PDF Catalog
PDF Pages | PDF Title |
---|---|
4 | CONTENTS |
6 | FOREWORD |
7 | ASME B30 COMMITTEE ROSTER |
9 | B30 STANDARD INTRODUCTION |
12 | ASME B30.2-2022 SUMMARY OF CHANGES |
14 | Chapter 2-0 Scope, Definitions, References, and Personnel Competence SECTION 2-0.1: SCOPE OF B30.2 SECTION 2-0.2: DEFINITIONS |
16 | Figures Figure 2-0.2-5 Wall Crane Figure 2-0.2-1 Cantilever Gantry Crane Figure 2-0.2-2 Gantry Crane Figure 2-0.2-3 Overhead Crane Figure 2-0.2-4 Semigantry Crane |
18 | SECTION 2-0.3: REFERENCES |
19 | SECTION 2-0.4: PERSONNEL COMPETENCE |
20 | Chapter 2-1 General Construction and Installation SECTION 2-1.1: MARKINGS 2-1.1.1 Rated Load Markings ā Crane 2-1.1.2 Rated Load Markings ā Hoists 2-1.1.3 Manufacturerās Identification Markings 2-1.1.4 Multiple Hoist Identification Markings 2-1.1.5 Warnings 2-1.1.6 Controls |
21 | SECTION 2-1.2: CLEARANCES 2-1.2.1 Clearance From Obstruction 2-1.2.2 Clearance Between Parallel Cranes SECTION 2-1.3: GENERAL CONSTRUCTION ā RUNWAYS AND SUPPORTING STRUCTURE 2-1.3.1 Foundations and Anchorages 2-1.3.2 Crane Runways SECTION 2-1.4: CRANE CONSTRUCTION 2-1.4.1 Welded Construction 2-1.4.2 Structural Components |
22 | 2-1.4.3 Modifications SECTION 2-1.5: CABS ā NORMAL OR SKELETON (IF PROVIDED) 2-1.5.1 Cab Location 2-1.5.2 Cab Construction 2-1.5.3 Access to Crane 2-1.5.4 Toolbox 2-1.5.5 Fire Extinguisher 2-1.5.6 Lighting SECTION 2-1.6: LUBRICATION SECTION 2-1.7: SERVICE PLATFORMS (FOOTWALKS) 2-1.7.1 Construction of Service Platforms |
23 | 2-1.7.2 Ladders and Stairways 2-1.7.3 Egress SECTION 2-1.8: STOPS AND BUMPERS 2-1.8.1 Trolley Stops 2-1.8.2 Bridge and Gantry Bumpers 2-1.8.3 Trolley Bumpers |
24 | SECTION 2-1.9: RAIL SWEEPS 2-1.9.1 Bridge Rail Sweeps 2-1.9.2 Trolley Rail Sweeps 2-1.9.3 Gantry Rail Sweeps SECTION 2-1.10: GUARDS FOR MOVING PARTS SECTION 2-1.11: TRUCK FRAME DROP SECTION 2-1.12: BRAKES AND BRAKING MEANS 2-1.12.1 Hoist Holding Brakes |
25 | 2-1.12.2 Hoist Control Braking Means 2-1.12.3 Trolley Brakes and Braking Means 2-1.12.4 Bridge Brakes and Braking Means 2-1.12.5 Trolley and Bridge Brake Provisions SECTION 2-1.13: ELECTRICAL EQUIPMENT 2-1.13.1 General |
26 | 2-1.13.2 Equipment 2-1.13.3 Controllers 2-1.13.4 Resistors |
27 | Figure 2-1.13.3-1 Recommended Arrangement of Controllers or Master Switches (Three-Motion Crane) Figure 2-1.13.3-2 Recommended Arrangement of Controllers or Master Switches (Four-Motion Crane) |
28 | Figure 2-1.13.3-3 Recommended Arrangement of Controllers (Pendant Push-Button Station Arrangement) Figure 2-1.13.3-4 Recommended Arrangement of Controllers (Radio Crane Control Transmitter Lever Arrangement) |
29 | 2-1.13.5 Disconnecting Means 2-1.13.6 Hoist Limit Switches 2-1.13.7 Runway and Bridge Conductor Systems 2-1.13.8 Crane Powered Lifting Devices 2-1.13.9 Service Receptacle SECTION 2-1.14: HOISTING EQUIPMENT 2-1.14.1 Sheaves 2-1.14.2 Drums |
30 | 2-1.14.3 Ropes 2-1.14.4 Equalizers 2-1.14.5 Hooks 2-1.14.6 Guards for Hoisting Ropes SECTION 2-1.15: WARNING DEVICES OR MEANS FOR A CRANE WITH A POWER-TRAVELING MECHANISM 2-1.15.1 Cab- and Remote-Operated Cranes 2-1.15.2 Floor-Operated Cranes 2-1.15.3 Types of Devices |
31 | SECTION 2-1.16: MANUAL 2-1.16.1 General Information 2-1.16.2 Safety Personnel SECTION 2-1.17: TRANSLATION OF SAFETY-RELATED INFORMATION AND CONTROL DESIGNATIONS |
32 | Chapter 2-2 Inspection and Testing SECTION 2-2.1: INSPECTION 2-2.1.1 General 2-2.1.2 Initial Inspection 2-2.1.3 Functional Test Inspection 2-2.1.4 Frequent Inspection |
33 | 2-2.1.5 Periodic Inspection 2-2.1.6 Inspection of Cranes Not in Regular Use SECTION 2-2.2: ROPE INSPECTION 2-2.2.1 General 2-2.2.2 Frequent Rope Inspection 2-2.2.3 Periodic Rope Inspection |
34 | SECTION 2-2.3: TESTING 2-2.3.1 Operational Tests 2-2.3.2 Load Test |
35 | Chapter 2-3 Operator Training and Operation SECTION 2-3.1: CRANE OPERATOR TRAINING 2-3.1.1 Purpose of Crane Operator Training 2-3.1.2 Crane Operator Training: General 2-3.1.3 Sources of Training Material SECTION 2-3.2: TRAINING FOR PERSONS OTHER THAN CRANE OPERATORS 2-3.2.1 Scope SECTION 2-3.3: OPERATION 2-3.3.1 Scope of Crane Operation 2-3.3.2 General Requirements |
36 | 2-3.3.3 Responsibilities of Management (Owners/Users) 2-3.3.4 Responsibilities of Crane Operators |
38 | 2-3.3.5 Responsibilities of Riggers 2-3.3.6 Responsibilities of Signalpersons |
39 | SECTION 2-3.4: PLANNING FOR LOAD HANDLING ACTIVITIES 2-3.4.1 Lift Planning 2-3.4.2 Planned Engineered Lifts SECTION 2-3.5: HOIST LIMIT DEVICES (SWITCHES) SECTION 2-3.6: SIGNALS 2-3.6.1 Standard Signals |
40 | 2-3.6.2 Special Signals SECTION 2-3.7: MISCELLANEOUS 2-3.7.1 Ladders 2-3.7.2 Cabs 2-3.7.3 Fire Extinguishers SECTION 2-3.8: CRANE LOCKOUT/TAGOUT 2-3.8.1 General |
41 | Figure 2-3.6.1-1 Standard Hand Signals for Controlling Overhead and Gantry Cranes |
42 | Chapter 2-4 Maintenance Training and Maintenance SECTION 2-4.1: MAINTENANCE TRAINING 2-4.1.1 Purpose of Maintenance Training 2-4.1.2 Crane Maintenance Training: General 2-4.1.3 Sources of Training 2-4.1.4 Responsibilities of Crane Maintenance Personnel SECTION 2-4.2: CRANE MAINTENANCE 2-4.2.1 General Maintenance |
43 | 2-4.2.2 Preventive Maintenance 2-4.2.3 Maintenance Procedure 2-4.2.4 Adjustments, Repairs, and Replacements 2-4.2.5 Lubrication SECTION 2-4.3: ROPE REPLACEMENT AND MAINTENANCE 2-4.3.1 Rope Replacement |
44 | 2-4.3.2 Rope Maintenance SECTION 2-4.4 MAINTENANCE RECORDS |