$98.04

ASME POM 101-2013 (R2019): Performance-Related Outage Inspections

Published By Publication Date Number of Pages
ASME 2013 64
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This Standard provides guidelines for equipment inspections of power plants using fossil fuels during shutdown or outage periods. Some portions of this document may be applicable to other types of power plants.

PDF Catalog

PDF Pages PDF Title
5 CONTENTS
6 FOREWORD
7 COMMITTEE ROSTER
8 CORRESPONDENCE WITH THE PTC COMMITTEE
9 INTRODUCTION
11 1 OBJECT AND SCOPE
1.1 Object
1.2 Scope
2 ACRONYMS
3 GUIDING PRINCIPLES
3.1 Safety Considerations
3.2 Preinspection Activities
3.3 Inspection Plan
12 3.4 Inspection Activities
3.5 Postinspection Activities
4 SPECIFIC EQUIPMENT CONSIDERATIONS
5 INSTRUMENTS AND METHODS OF MEASUREMENT
6 REPORT OF RESULTS
13 NONMANDATORY APPENDIX A AIR HEATER (TUBULAR)
A-1 GENERAL INSPECTION GUIDELINES
A-1.1 Prior to the Outage
A-1.2 During the Inspection
A-1.3 After the Inspection
A-2 PROCEDURES PRIOR TO EQUIPMENT SHUTDOWN
14 A-3 CONDUCTING THE INSPECTION
A-3.1 Initial Inspection — Before Cleaning
A-3.2 Second Inspection — After Cleaning
A-3.3 Tube Sheets
A-3.4 Tubes
15 A-3.5 Seals
A-3.6 Instrumentation
A-3.7 Soot Blowers
A-3.8 Penetrations
A-4 AIR-SIDE INSPECTION
A-4.1 Tubes
A-4.2 Tube Support Sheets
A-4.3 Seals
A-4.4 Instrumentation
A-4.5 Penetrations
16 NONMANDATORY APPENDIX B BLOWDOWN TANK
B-1 BLOWDOWN TANK INSPECTION GUIDELINES
B-2 OUTAGE
B-3 CONDUCTING THE INSPECTION
B-3.1 During Inspection
B-3.2 After Inspection
B-4 PROCEDURES PRIOR TO EQUIPMENT SHUTDOWN
17 B-5 CONDUCTING THE INSPECTION
B-5.1 General
B-5.2 Internals
B-5.3 Cleanliness/Debris/Corrosion
B-5.4 Penetrations
B-5.5 Wall Thickness
18 NONMANDATORY APPENDIX C CONDENSER STEAM SIDE
C-1 CONDENSER STEAM SPACE INSPECTION GUIDELINES
C-1.1 Prior to the Outage
C-1.2 During Inspection
C-1.3 After Inspection
C-2 PROCEDURES PRIOR TO EQUIPMENT SHUTDOWN
19 C-3 CONDUCTING THE INSPECTION
C-3.1 General
C-3.2 Cleanliness/Debris/Corrosion
C-3.3 Internal Piping
C-3.4 Supports
C-3.5 Instrumentation
C-3.6 Baffle Plates
20 C-3.7 Spargers
C-3.8 Tubes
C-3.9 Hot Well
C-3.10 Feedwater Heaters and Extraction Piping
C-3.11 Penetrations
C-3.12 Turbine-Condenser Flange (Boot Seal)
21 NONMANDATORY APPENDIX D CONDENSER WATER BOX AND TUBE-SIDE INSPECTION GUIDELINES
D-1 CONDENSER WATER BOX INSPECTION GUIDELINES
D-1.1 Prior to the Outage
D-1.2 During Inspection
D-1.3 After Inspection
D-2 CONDUCTING THE INSPECTION
D-2.1 General
22 D-2.2 Cleanliness, Corrosion, and Cleaning
D-2.2.1 Initial Inspection.
D-2.2.2 Inspection After Cleaning.
D-2.2.3 Inspection for Fouling.
D-2.2.4 Mechanical Cleaners.
D-2.2.5 Borescope/Videoscope.
D-2.3 Eddy-Current Testing
D-2.4 Expansion Joints
23 D-2.5 Instrumentation
D-2.6 Penetrations
D-2.7 Valves
D-3 PROCEDURES PRIOR TO EQUIPMENT SHUTDOWN
24 NONMANDATORY APPENDIX E COOLING TOWER OUTAGE INSPECTION GUIDELINES
E-1 INSPECTION GUIDELINES
E-1.1 General Inspection Considerations
E-1.2 Fan Inspection Guidelines
E-1.2.1 Blades.
25 E-1.2.2 Gear Driven.
E-1.2.3 Belt Drive.
E-1.2.4 Drive Shaft.
E-1.3 Water Distribution
E-1.3.1 Headers.
E-1.3.2 Distribution Nozzles.
E-1.3.3 Strainers.
E-1.3.4 Tower Decks.
E-1.4 Fill
26 E-1.5 Basin
E-1.6 Louvers
E-1.7 Plenum
E-1.8 Chemical Injection
E-1.8.1 Inhibitor Feed.
E-1.8.2 Acid Feed.
E-1.8.3 Bleach Feed.
E-1.9 Piping and Valving
E-1.9.1 Blowdown.
27 E-1.9.2 Makeup.
E-1.9.3 Risers.
E-1.10 Support Structure
E-1.10.1 Wood.
E-1.10.1.1 Chemical Attack: Delignification Due to Removal of Lignin.
E-1.10.1.2 Biological Surface Attack.
E-1.10.1.3 Biological Internal Attack.
E-1.10.1.4 Iron Rot.
E-1.10.2 Galvanized.
E-1.10.3 Structural Inspection.
28 E-1.11 Ladders and Walkways
29 NONMANDATORY APPENDIX F ELECTROSTATIC PRECIPITATOR
F-1 PROCEDURES PRIOR TO OUTAGE
F-2 INSPECTION PROCEDURES
F-2.1 During Inspection
F-2.2 After Inspection
F-3 SPECIFIC INSPECTION GUIDELINES
F-3.1 General
30 F-3.2 Inspection Categories
F-3.2.1 Mechanical.
F-3.2.2 Instrumentation and Electrical.
F-3.2.3 Wet Electrostatic Precipitator (WESP).
F-3.3 Additional Subsystems
31 NONMANDATORY APPENDIX G FEEDWATER HEATERS AND DEAERATORS
G-1 GENERAL INSPECTION GUIDELINES
G-1.1 Prior to the Outage
G-1.2 During the Inspection
G-1.3 After the Inspection
G-2 PROCEDURES PRIOR TO EQUIPMENT SHUTDOWN
32 G-3 CONDUCTING THE INSPECTION
G-4 CLEANLINESS, DEBRIS, AND CORROSION
G-4.1 Partition Plate
G-4.2 Tube Sheet
G-4.3 Tube ID
G-4.4 Shell Side
G-4.5 Tube Support Sheets
G-4.6 Baffle Plates
G-4.7 Drain Cooler Section (Where Applicable)
G-4.8 Tubes
G-5 DEAERATORS AND THEIR DRAIN/STORAGE TANKS
33 G-5.1 Cleanliness, Debris, and Corrosion
G-5.2 Trays
G-5.3 Drain Tank
G-6 EXTRACTION STEAM PIPING
34 NONMANDATORY APPENDIX H HEAT RECOVERY STEAM GENERATORS
H-1 INTRODUCTION
H-2 PROCEDURES PRIOR TO EQUIPMENT SHUTDOWN
H-3 DUCTWORK
H-3.1 Offline Visual Inspection
H-3.1.1 HRSG Exterior.
H-3.1.2 HRSG Interior.
35 H-3.1.3 GT Outlet Gas Inlet to HRSG.
H-3.1.4 Penetrations.
H-3.1.5 Supports, Guides, and Expansion Joints.
H-3.1.6 Bypass Stack.
H-3.2 Ductwork Notes: Hotspots and Leaks
H-4 HP SECONDARY SUPERHEATER
H-4.1 General
H-4.2 Offline Visual Inspection
H-4.2.1 Tube Elements.
36 H-4.2.2 Pole Baffles.
H-4.2.3 Side Baffles.
H-4.2.4 Tube Sheets.
H-4.2.5 Lower Shield.
H-5 SECONDARY REHEATER
H-5.1 General
H-5.2 Offline Visual Inspection
H-5.2.1 Tube Elements.
H-5.2.2 Center Baffle.
H-5.2.3 Side Baffles.
H-5.2.4 Tube Sheets.
H-5.2.5 Lower Shield.
37 H-5.2.6 Pyro-Bloc Module (If Applicable).
H-6 DUCT BURNERS AND CATALYSTS
H-6.1 General
H-6.2 Offline Visual Inspection
H-6.3 SCR Catalysts
H-6.3.1 Ammonia Injection Grid AIG.
H-6.3.2 CO Catalyst.
H-7 PRIMARY REHEATER
H-7.1 General
H-7.2 Offline Visual Inspection
38 H-7.2.1 Tube Elements.
H-7.2.2 Center Baffle.
H-7.2.3 Side Baffles.
H-7.2.4 Tube Sheets.
H-7.2.5 Lower Shield.
H-8 HP PRIMARY SUPERHEATER
H-8.1 General
H-8.2 Offline Visual Inspection
H-8.2.1 Tube Elements.
H-8.2.2 Center Baffle.
H-8.2.3 Side Baffles.
H-8.2.4 Tube Sheets.
39 H-8.2.5 Lower Shield.
H-9 HP EVAPORATOR
H-9.1 General
H-9.2 Offline Visual Inspection
H-9.2.1 Tube Elements.
H-9.2.2 Center Baffle.
H-9.2.3 Side Baffles.
H-9.2.4 Tube Sheets.
H-9.2.5 Lower Shield.
H-10 IP SUPERHEATER
H-10.1 General
H-10.2 Offline Visual Inspection
H-10.2.1 Tube Elements.
40 H-10.2.2 Center Baffle.
H-10.2.3 Side Baffles.
H-10.2.4 Tube Sheets.
H-10.2.5 Lower Shield
H-11 HP/IP PRIMARY ECONOMIZER
H-11.1 General
H-11.2 Offline Visual Inspection
H-11.2.1 Tube Elements.
H-11.2.2 Center Baffle.
H-11.2.3 Side Baffles.
H-11.2.4 Tube Sheets.
41 H-11.2.5 Lower Shield.
H-12 LP EVAPORATOR
H-12.1 General
H-12.2 Offline Visual Inspection
H-12.2.1 Tube Elements.
H-12.2.2 Center Baffle.
H-12.2.3 Side Baffles.
H-12.2.4 Tube Sheets.
H-12.2.5 Lower Shield.
H-12.2.6 Flow-Accelerated Corrosion (FAC).
42 H-13 FW HEATER
H-13.1 General
H-13.2 Offline Visual Inspection
H-13.2.1 Tube Elements.
H-13.2.2 Center Baffle.
H-13.2.3 Side Baffles.
H-13.2.4 Tube Sheets.
H-13.2.5 Lower Shield.
H-13.2.6 Flow-Accelerated Corrosion (FAC).
H-13.2.7 Inlet Header.
H-14 SUPPORTS, GUIDES, AND EXPANSION JOINTS
H-14.1 CT/HRSG Main Expansion Joint
H-14.1.1 General.
H-14.1.2 Visual Inspection.
H-14.2 General Ground Level
43 H-14.3 General Top Level
H-15 HIGH-PRESSURE DRUM
H-15.1 General
H-15.2 Offline Visual Inspection
H-15.2.1 Chevron Dryers.
H-15.2.2 Vortex Duct.
H-15.2.3 Piping and Tubing.
H-16 INTERMEDIATE-PRESSURE DRUM
H-16.1 General
H-16.2 Offline Visual Inspection
H-16.2.1 Chevron Dryers.
H-16.2.2 Vortex Duct and Separators.
H-16.2.3 Piping and Tubing.
H-17 LOW-PRESSURE DRUM AND INTEGRAL DEAERATOR
H-17.1 General
H-17.2 Offline Visual Inspection
H-17.2.1 Chevron Dryers.
H-17.2.2 Drum Baffles.
44 H-17.2.3 Piping and Tubing.
H-17.3 Integral Deaerator
H-18 STACK AND STACK DAMPER
H-18.1 Stack
H-18.2 Stack Damper
H-18.2.1 Damper Flange.
H-18.2.2 Blades.
H-18.2.3 Blade Seals.
H-18.2.4 Linkage.
H-18.2.5 Packing Glands.
H-18.2.6 Actuator.
H-18.2.7 Limit and Torque Switches.
49 NONMANDATORY APPENDIX I BOILER SETTING AIR IN-LEAKAGE AND REGENERATIVE (ROTARY) AIR HEATER INSPECTION GUIDELINES
I-1 INTRODUCTION
I-2 INSPECTION PRIOR TO THE OUTAGE
I-2.1 Initial Review
50 I-2.2 During Inspection
I-2.3 After Inspection
I-3 GENERAL INSPECTION
I-3.1 Initial Inspection — Prior to Cleaning
I-3.2 Second Inspection — Post-Cleaning/Scaffolding
I-4 INSPECTIONS OF BOILER, DUCTS, AND FAN — AIR IN-LEAKAGE
I-4.1 Furnace Inspection
I-4.1.1 Lower Furnace.
51 I-4.1.2 Mid Furnace.
I-4.1.3 Lower and Mid–Upper Furnace.
I-4.1.4 Dead Air Spaces.
I-4.2 Fan Inspection
I-4.3 Wind Box/Secondary Air
I-4.4 Over-Fire Air
I-4.5 Instrumentation
I-4.6 Ductwork (Air Ducts, Gas Ducts, Economizer Hoppers)
I-4.7 Expansion Joints
I-4.8 Burners: Signs of Erosion, Physical Damage, or Malformation
I-4.9 Burners: Refurbishment
52 I-4.10 Soot Blowers/Performance
I-4.11 Penthouse
I-4.12 Access Doors
I-4.13 Convection Pass
I-4.14 Access Doors/Hatches (All)
I-4.15 Environmental Control Equipment (Typical)
I-4.16 Regenerative (Rotary) Air Heater Inspection
I-4.16.1 Housing.
I-4.16.2 Basket Frame Inspection.
I-4.16.3 Rotor Inspection.
I-4.16.4 Heating Element Inspection.
I-4.16.5 Rotor Sealing Arrangement.
I-4.16.6 Sealing Surfaces.
53 I-4.16.7 T-Bars.
I-4.16.8 Rotor Drive System / Mechanisms.
I-4.16.9 Rotor Bearings.
I-5 CLEANING/WASHING EQUIPMENT
I-6 INSTRUMENTATION
I-7 AUXILIARY EQUIPMENT (AS INSTALLED)
I-8 EXPANSION JOINT, DUCTWORK, SUPPORT BRACING
I-9 DAMPERS
54 NONMANDATORY APPENDIX J BOILER STEAM- AND WATER-SIDE OUTAGE INSPECTION GUIDELINES
J-1 INSPECTION GUIDELINES
J-1.1 General Inspection Considerations
J-1.1.1 Boiler Operation and Construction.
J-1.1.2 Plant Operations.
J-1.1.3 Drawings.
J-1.1.4 Pretreatment Reliability.
J-1.1.5 Digital Photographs.
J-1.1.6 Analyses.
55 J-1.1.7 Inspection Tools.
J-1.1.8 Liner Inspection.
J-2 EQUIPMENT INSPECTION GUIDELINES
J-2.1 Steam Drum
J-2.1.1 Drum Inspection
J-2.1.1.1 Waterline
J-2.1.1.2 Corrosion
56 J-2.1.1.3 Deposition
J-2.1.1.4 Belly Plates.
J-2.1.1.5 Penetrations.
J-2.1.2 Steam Separation Equipment
J-2.1.3 Blowdown Line
J-2.1.4 Feedwater Line.
J-2.1.5 Chemical Injection
J-2.2 Tubes
J-2.2.1 Recommended Practices.
J-2.2.2 Risers (Generating) and Downcomers
57 J-2.2.3 Water-Wall Headers
J-2.3 Mud Drum (If Applicable)
58 NONMANDATORY APPENDIX K SAFETY CONSIDERATIONS
K-1 GENERAL CONSIDERATIONS
K-2 EQUIPMENT-SPECIFIC CONSIDERATIONS
K-2.1 Cooling Towers
K-2.2 Heat Recovery Steam Generators
K-2.3 Boiler Setting Air In-Leakage and Regenerative (Rotary) Air Heaters
K-2.4 Boiler: Steam and Water Side
61 ASME Services
ASME POM 101 2013 R2019
$98.04