AWWA C530 2007 with Erratum 2008
$75.83
AWWA C530-07: Pilot Operated Control Valves With Erratum-200805
Published By | Publication Date | Number of Pages |
AWWA | 2007 | 33 |
The purpose of this standard is to define the minimum requirements for pilot-operated control valves, including sizing considerations, design verification, testing, delivery, handling, and storage.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | Erratum to ANSI/AWWA C530-07Standard |
4 | Committee Personnel |
6 | Contents |
8 | Foreword I . Introduction. |
9 | II . Special Issues. |
10 | III . Use of This Standard. |
12 | IV. Major Revisions. V. Comments. |
14 | AWWA Standard Pilot-Operated Control Valves Section 1: GENERAL Sec . 1 .1 Scope |
15 | Sec . 1 .2 Purpose Sec . 1 .3 Application Section 2: REFERENCES |
17 | Section 3: DEFINITIONS |
18 | Section 4: REQUIREMENTS Sec . 4 .1 Data Provided by Manufacturer. |
19 | Sec . 4 .2 Materials. |
20 | Sec . 4 .3 General Design. |
24 | Sec . 4 .4 Workmanship and Painting. Sec . 4 .5 Permeation. |
25 | Section 5: VERIFICATION Sec . 5 .1 Inspection Sec . 5 .2 Testing |
26 | Sec . 5 .3 Notice of Nonconformance Section 6: DELIVERY Sec. 6.1 Markings Sec. 6.2 Shipping |
27 | Sec. 6.3 Affidavit of Compliance |
28 | Appendix A Installation, Operation, and Maintenance Pilot-Operated Control Valves Section A .1: GENERAL Section A .2: UNLOADING Section A .3: STORAGE |
29 | Section A .4: INSPECTION Section A .5: INSTALLATION |
30 | Section A .6: RECORDS Section A .7: MAINTENANCE |