BCISI Field Guide 1 General 2023 2ndEdition
$18.96
ICT Installation Practices Field Guide, Volume 1 – General Cabling, 2nd Edition
Published By | Publication Date | Number of Pages |
BICSI | 2023 |
Newly updated to their second editions, BICSI’s three new ICT Installation Practices Field Guides continue to be the must-have companions for every ICT and low voltage cabling installer and technician. Whether it’s General Cabling, Copper, or Optical Fiber Installation, these newly updated guides are sized for your pocket or toolbox. Many additions and updates were incorporated into the three field guides with new accepted ICT technologies, current codes, standards, and industry best practices. Each volume is arranged to quickly place the information you need at your fingertips. This updated guide focuses on the tasks and procedures for setting up the site and preparing pathways and spaces for the actual cable installation. Common safety practices, protective equipment and firestopping are also included to keep you, your team, and the site safe from harm.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | ICT Field Guide Vol I, 2nd Edition |
2 | Preface |
5 | WARNING |
6 | Acknowledgments |
8 | Acronyms |
12 | Table of Contents |
18 | Figures |
26 | Tables |
27 | Steps |
28 | General Safety Practices |
29 | Designating Work Areas |
30 | Tool and Equipment Safety |
31 | Electrical Tools Safety |
33 | Ladder Safety Ladder Choice |
34 | Ladder Placement and Setup Ladder Inspection and Use |
37 | Stepladders and Extension Ladders |
39 | Personnel Lifts (Elevating Work Platforms) |
40 | Preparation and Setup for Personnel Lifts |
41 | General Safety for Personnel Lifts |
42 | Inspecting the Personnel Lift |
44 | Personal Protective Equipment (PPE) |
45 | Headgear |
46 | Eye Protection |
47 | Breathing Protection |
49 | Lifting Safety Precautions |
50 | Protective Footwear Gloves |
51 | Detection Badges and Exposure Monitors High-Visibility Apparel |
52 | Hearing Protection |
53 | Fall Protection |
55 | Clothing |
57 | Grooming Hazardous Indoor Environments Electrical Hazards |
59 | Physical Effects of Current |
60 | Emergency Electrical Safety Board |
61 | RACE Fire Extinguishers |
62 | Lightning Hazards |
63 | Access Floor Hazards |
65 | Catwalk Hazards |
66 | Crawl Space Hazards |
67 | Suspended Ceilings |
68 | Confined Spaces Permit Required Confined Spaces (PRCS) |
71 | Battery Hazards Asbestos Hazards |
73 | Chemical Hazards |
76 | Other Hazardous Locations |
77 | First Aid First Aid, Cardiopulmonary Resuscitation (CPR), and the Law |
78 | First Aid Kits |
80 | Performing an Emergency Rescue |
82 | Generic Structured Cabling Systems |
83 | Administration of Structured Cabling Systems (SCS) |
84 | Identifiers Records Labeling |
87 | Pathway Types Conduit |
89 | Conduit Bends and Bodies |
92 | Conduit Supports |
93 | General Conduit Installation Guidelines |
94 | Pull String Installation |
99 | Cable Runways (Ladder Rack) and Cable Trays |
100 | Ladder Rack and Cable Tray Support Methods |
101 | Access Floor Pathway Systems |
103 | Surface-Mount Raceways |
105 | Surface-Mount Boxes |
106 | Open-Top Cable Supports |
107 | Anchors and Fasteners (Hardware) Anchors |
110 | Fasteners Screws |
112 | Bolts, Nuts, and Washers |
115 | Specialty Fasteners |
125 | Space Build-Out Space Layout |
126 | Lighting, Power, and Environmental Control Considerations |
127 | Entrance Facilities (EFs) |
130 | Equipment Rooms (ERs) |
131 | Telecommunications Rooms (TRs) |
132 | Telecommunications Enclosures (TEs) Access Bonding and Grounding (Earthing) |
133 | Electrical Power Fire Protection Heating, Ventilation, and Air-Conditioning (HVAC) |
134 | Interior Provisioning Pathways Plywood Backboards Materials |
138 | Ladder Racks and Cable Trays |
141 | Distribution Rings (D Rings) |
142 | Spools Floor-Mounted Racks |
144 | Floor-Mounted Cabinets |
145 | Wall-Mounted Cabinets and Racks |
146 | Cable Management |
148 | Design Layout |
152 | Cabinet and Rack Installation Attachment |
153 | Bracing |
154 | Seismic Zone Considerations Work Areas Outlets and Cavity Boxes |
156 | Steps to Installing Telecommunications Outlet or Cavity Box in Existing Walls with Wallboard/Sheetrock |
157 | Cables and Cords Modular Furniture |
159 | Poke-Thrus Poke-Thru Device Installations |
160 | Common Installation Practices |
162 | Verification of Cable Lengths Tools and Equipment |
163 | Pulling Force |
164 | Safety Procedures During Cable Pulling Activities |
180 | Pull Horizontal Station Cable (Ceiling) |
183 | Pull Backbone Cable |
198 | Firestopping Qualification Testing |
199 | Rated Devices Device Classifications |
201 | Mechanical Firestop Systems Non-mechanical Firestop Systems |
205 | Firestopping Methods |
206 | Cautions |
207 | Sleeves and Cable Trays |
208 | Pathway Barrier Penetration Plates (PBPPs) |
209 | Core Bore Seals (CBSs) |
210 | Cable Trays |
211 | Cable Firestop Labeling |
212 | Underwriters Laboratories Inc.®(UL®) Numbering System |
214 | Firestopping Decision Methods and Examples of Firestop Systems |
218 | Examples of Typical Installations of Firestop Systems |
225 | Bonding and Grounding (Earthing) and Protection Safety Items Related to Bonding and Grounding (Earthing) |
228 | Alternating Current (ac) Grounding (Earthing) Electrode System |
229 | Equipment Grounding (Earthing) System |
230 | Telecommunications Bonding Infrastructure Small Systems |
231 | Large Systems |
232 | ICT Bonding Infrastructure Components |
233 | Primary Bonding Busbar (PBB) |
235 | Secondary Bonding Busbar (SBB) |
237 | Bonding Conductors |
238 | Telecommunications Bonding Conductor (TBC) Telecommunications Bonding Backbone (TBB) Backbone Bonding Conductor (BBC) |
239 | Telecommunications Equipment Bonding Conductor (TEBC) Connectors |
241 | Supplemental Bonding Network |
242 | Installing Bonding Connections |
243 | Bonding Pathways Bonding Equipment Cabinets and Racks |
245 | Example A |
247 | Example B |
248 | Example C |
249 | Inspection of Bonding Connections |
250 | Bonding and Grounding (Earthing) Testing Procedures |
251 | Two-Point Bonding Measurements |
252 | True Root Mean Square Alternating Current (ac) Amperage Measurements |
253 | Direct Current (dc) Amperage Measurements Alternating Current (ac) Wiring Polarity/Ground Impedance |
254 | System Cutover Planning the Cutover |
255 | Cutover Plans |
257 | Types of Cutovers |
258 | Steps—Cutover |
260 | Index A B C |
261 | D E |
262 | F G H |
263 | I J L M O |
264 | P R S |
265 | T U W |