This document establishes requirements for the management and control of activities in drain and sewer systems outside buildings and specifies requirements for development and implementation of work programmes, and the selection of techniques.
This document covers general requirements for the management and control of activities.
It is applicable to drain and sewer systems from the point where wastewater leaves a building, roof drainage system, or paved area, to the point where it is discharged into a wastewater treatment plant or receiving water body.
Drains and sewers below buildings are included provided that they do not form part of the drainage system of the building.
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | undefined |
9 | 1 Scope 2 Normative references 3 Terms and definitions |
10 | 4 General |
12 | 5 Integrated Sewer System Management Planning 6 Preparation of programme 6.1 Introduction 6.2 Review of the plan |
13 | 6.3 Investigation 6.4 Assessment 6.5 Development of the programme 6.5.1 Introduction |
14 | 6.5.2 Specification of objectives 6.5.3 Developing options 6.5.4 Assess feasibility of solutions 6.5.5 Select optimum solution |
15 | 6.5.6 Producing the programme 7 Preparation of the project specification 7.1 Introduction |
16 | 7.2 Review of the project description and project objectives 7.3 Investigation 7.4 Assessment 7.5 Drafting the project specification 7.5.1 Introduction |
17 | 7.5.2 Prepare potential solutions 7.5.3 Assess feasibility of solutions 7.5.4 Select optimal solution 7.5.5 Detailed design of optimal solution 7.6 Performance indicators 7.6.1 Introduction 7.6.2 Indicators for the assessment of the work quality 7.6.3 Indicators for the assessment of the effectiveness of the project or programme 7.6.4 Prepare project specification 8 Implementation of projects 8.1 Introduction 8.2 Selection of contractor |
18 | 8.3 Method of working 8.4 Supervision of the works |
19 | 8.5 Flow control 8.6 Traffic management 8.7 Waste management |
20 | 8.8 Training 8.9 Health and safety 8.10 Environmental impact 8.11 Reporting |
21 | 9 Measurement of conformity 9.1 General 9.2 Non-conformities 9.3 Post project appraisal 10 Review of plan and programme |