Shopping Cart

No products in the cart.

BS EN 14654-1:2021

$142.49

Drain and sewer systems outside buildings. Management and control of activities – General requirements

Published By Publication Date Number of Pages
BSI 2021 24
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This document establishes requirements for the management and control of activities in drain and sewer systems outside buildings and specifies requirements for development and implementation of work programmes, and the selection of techniques.

This document covers general requirements for the management and control of activities.

It is applicable to drain and sewer systems from the point where wastewater leaves a building, roof drainage system, or paved area, to the point where it is discharged into a wastewater treatment plant or receiving water body.

Drains and sewers below buildings are included provided that they do not form part of the drainage system of the building.

PDF Catalog

PDF Pages PDF Title
2 undefined
9 1 Scope
2 Normative references
3 Terms and definitions
10 4 General
12 5 Integrated Sewer System Management Planning
6 Preparation of programme
6.1 Introduction
6.2 Review of the plan
13 6.3 Investigation
6.4 Assessment
6.5 Development of the programme
6.5.1 Introduction
14 6.5.2 Specification of objectives
6.5.3 Developing options
6.5.4 Assess feasibility of solutions
6.5.5 Select optimum solution
15 6.5.6 Producing the programme
7 Preparation of the project specification
7.1 Introduction
16 7.2 Review of the project description and project objectives
7.3 Investigation
7.4 Assessment
7.5 Drafting the project specification
7.5.1 Introduction
17 7.5.2 Prepare potential solutions
7.5.3 Assess feasibility of solutions
7.5.4 Select optimal solution
7.5.5 Detailed design of optimal solution
7.6 Performance indicators
7.6.1 Introduction
7.6.2 Indicators for the assessment of the work quality
7.6.3 Indicators for the assessment of the effectiveness of the project or programme
7.6.4 Prepare project specification
8 Implementation of projects
8.1 Introduction
8.2 Selection of contractor
18 8.3 Method of working
8.4 Supervision of the works
19 8.5 Flow control
8.6 Traffic management
8.7 Waste management
20 8.8 Training
8.9 Health and safety
8.10 Environmental impact
8.11 Reporting
21 9 Measurement of conformity
9.1 General
9.2 Non-conformities
9.3 Post project appraisal
10 Review of plan and programme
BS EN 14654-1:2021
$142.49