Application integration at electric utilities. System interfaces for distribution management – Interfaces for maintenance and construction

Published By Publication Date Number of Pages
BSI 2016 150
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

IEC 61968-6:2015 specifies the information content of a set of message types that can be used to support business functions related to maintenance and construction. Typical uses of the message types defined in this part of IEC 61968 include planned maintenance, unplanned maintenance, conditional maintenance, work management, new service requests, etc. Message types defined in other parts of IEC 61968 may also be relevant to these use cases.

PDF Catalog

PDF Pages PDF Title
6 CONTENTS
8 FOREWORD
10 INTRODUCTION
11 Tables
Table 1 – Document overview for IEC 61968-6
12 1 Scope
2 Normative references
13 3 Terms, definitions and abbreviations
3.1 Terms and definitions
3.2 Abbreviations
4 Reference and information models
4.1 General
14 4.2 Reference model
4.2.1 General
Figures
Figure 1 – Asset life cycle
15 Figure 2 – IEC 61968-6 reference model for maintenance
16 4.2.2 Geographical Inventory (GINV)
4.2.3 Maintenance and Inspection (MAI)
4.2.4 Construction
4.2.5 Design
4.2.6 Work Scheduling and Dispatching (SCHD)
4.2.7 Field Recording (FRD)
4.2.8 Network Operation Simulation (SIM)
4.2.9 Customer Service (CS)
4.2.10 Trouble call management (TCM)
17 4.2.11 Financial (FIN)
4.2.12 Human resources
4.2.13 Asset Management (AM) System
4.2.14 Network Operations (NO)
4.3 Interface reference model
18 4.4 Maintenance and construction functions and components
4.5 Static information model
4.5.1 Information model classes
4.5.2 Classes for maintenance and construction
Table 2 – Business functions and abstract components
19 4.6 Maintenance and construction use cases
Table 3 – Maintenance and construction classes
20 5 Maintenance and construction message types
5.1 General
Figure 3 – End-to-end business cases and related messages
21 5.2 Work
5.3 Work request message
5.3.1 General
5.3.2 Applications – Carry out planned maintenance with temporary equipment
22 Figure 4 – Carry out planned maintenance with temporary equipment
23 5.3.3 Message format
Figure 5 – Work request message format
24 5.4 Service order message
5.4.1 General
5.4.2 Applications – Meter installation and removal
Figure 6 – Meter installation and removal
25 5.4.3 Message format
26 Figure 7 – Service order message format
27 5.5 Maintenance order message
5.5.1 General
5.5.2 Applications
28 5.5.3 Message format
Figure 8 – Maintenance of high voltage device (transformer etc) requested by FRD
29 Figure 9 – MaintenanceOrder message format
30 6 Document conventions
6.1 UML diagrams
6.2 Message definitions
6.2.1 General
6.2.2 Mandatory versus optional
31 Annex A (normative) Description of message type verbs
Table A.1 – Commonly used verbs
33 Annex B (normative) XML Schemas for Message Payloads
B.1 General
B.2 WorkRequest
54 B.3 ServiceOrder
95 B.4 MaintenanceOrder
147 Bibliography
BS EN 61968-6:2016
$215.11