BS ISO 10976:2015 – TC:2020 Edition
$280.87
Tracked Changes. Refrigerated light hydrocarbon fluids. Measurement of cargoes on board LNG carriers
Published By | Publication Date | Number of Pages |
BSI | 2020 | 145 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | compares BS ISO 10976:2015 |
2 | TRACKED CHANGES Text example 1 — indicates added text (in green) |
78 | Foreword |
79 | Introduction |
80 | 1 Scope 2 Normative references 3 Terms, definitions and abbreviated terms 3.1 Terms and definitions |
84 | 3.2 Abbreviated terms |
85 | 4 General operating safety precautions and regulatory requirements 4.1 General |
86 | 4.2 Electrical equipment classification 4.3 Electromagnetic disturbance 4.4 Maintenance 4.5 Service conditions 4.6 Compatibility 4.7 Personnel protection 4.8 Procedures |
87 | 5 Measurement systems and equipment 5.1 General 5.2 Measurement equipment performance |
88 | 5.3 Calibration and certification of measurement equipment 5.4 Verification of measurement equipment between dry dockings 5.5 Inspection of measurement equipment during transfer operations |
89 | 5.6 Static measurement systems and equipment 5.6.1 General 5.6.2 Tank capacity tables |
91 | 5.6.3 Trim and list measurement 5.6.4 Tank gassing-up tables or means of determination |
92 | 5.6.5 Tank cool-down tables or means of determination 5.6.6 Liquid level measurement equipment |
96 | 5.6.7 Temperature measurement equipment |
97 | 5.6.8 Pressure measurement equipment 5.6.9 Custody transfer measurement system |
98 | 5.7 Dynamic measurement systems and equipment 6 Measurement procedures 6.1 General |
99 | 6.2 Static measurement 6.2.1 General |
100 | 6.2.2 Measuring liquid level 6.2.3 Loading 6.2.4 Discharge 6.2.5 Shipboard measurements |
101 | 6.2.6 Liquid level |
102 | 6.2.7 Temperature |
103 | 6.2.8 Pressure 6.2.9 CTMS 6.2.10 Sampling |
104 | 6.2.11 Vapour return 6.3 Gas-up and cool-down quantification 6.3.1 General 6.3.2 Inerting 6.3.3 Gas up and cool down |
105 | 6.4 Dynamic measurement 7 Cargo calculations 7.1 General 7.2 LNG volume determination 7.2.1 General |
106 | 7.2.2 Liquid levels below lower measurable limit 7.3 LNG density determination |
107 | Annex A (informative) LNGC design and marine operations |
115 | Annex B (informative) Additional considerations for measurement on board an LNGC |
119 | Annex C (informative) Examples of tank capacity tables for a spherical tank |
125 | Annex D (informative) Calculation examples |
134 | Annex E (informative) Sampling |
138 | Annex F (informative) Marine measurement witnessing checklists |
141 | Bibliography |