BS ISO 16399:2023
$198.66
Agricultural irrigation equipment. Meters for irrigation water
Published By | Publication Date | Number of Pages |
BSI | 2023 | 66 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | National foreword |
7 | Foreword |
9 | 1 Scope 2 Normative references 3 Terms and definitions |
13 | 4 Metrological requirements 4.1 Values of Q1, Q2, Q3 and Q4 4.1.1 Permanent flow rate (Q3) |
14 | 4.1.2 Measuring range 4.1.3 Relationship between permanent flow rate (Q3) and overload flow rate (Q4) 4.1.4 The ratio Q2/Q1 shall be 1,6 4.2 Maximum permissible error (MPE) 4.2.1 Formulation 4.2.2 Accuracy class |
15 | 4.2.3 Meter temperature classes 4.2.4 Reverse flow 4.2.5 Absence of flow or of water |
16 | 4.2.6 Static pressure 4.3 Requirements for meters and ancillary devices 5 Water meters equipped with electronic devices 6 Technical characteristics 6.1 Materials and construction of water meters 6.2 Adjustment and correction |
17 | 6.3 Installation conditions 6.4 Rated operating conditions 6.5 Pressure loss |
18 | 6.6 Marks and inscriptions |
19 | 6.7 Indicating device 6.7.1 General requirements |
20 | 6.7.2 Types of indicating device |
21 | 6.8 Sealing and security 6.8.1 Meter security and protection against manipulations 6.8.2 Mechanical protection devices 6.8.3 Electronic sealing devices 6.9 Other devices 7 Performance tests 7.1 General conditions for the tests 7.1.1 Water quality 7.1.2 Reference conditions |
22 | 7.1.3 General rules concerning test installation and location 7.2 Static pressure test 7.2.1 General 7.2.2 Preparation 7.2.3 Test procedure |
23 | 7.2.4 Acceptance criteria 7.3 Determination of errors 7.3.1 General 7.3.2 Preparation |
28 | 7.3.3 Test procedure |
29 | 7.3.4 Acceptance criteria 7.4 Pressure loss test 7.4.1 General 7.4.2 Preparation 7.4.3 Test procedure |
32 | 7.4.4 Calculation of the actual Δp of a water meter 7.4.5 Acceptance criteria 7.5 Reverse flow test 7.5.1 General 7.5.2 Preparation 7.5.3 Test procedure |
33 | 7.5.4 Acceptance criteria 7.6 Flow disturbance tests 7.6.1 General |
34 | 7.6.2 Objective of the test 7.6.3 Preparation 7.6.4 Test procedure 7.6.5 Acceptance criteria |
36 | 7.7 Endurance tests 7.7.1 Durability test |
41 | 7.7.2 Resistance to solid particles test |
43 | 7.8 Magnetic field testing 7.9 Test on ancillary devices of a water meter 8 Tests related to the influence quantities and perturbations |
44 | Annex A (informative) Pulse input solutions |
50 | Annex B (normative) Flow disturbers |
64 | Bibliography |