Shopping Cart

No products in the cart.

BSI PD IEC TR 62285:2023 – TC

$186.33

Tracked Changes. Application guidelines for nonlinear coefficient measuring methods

Published By Publication Date Number of Pages
BSI 2023 60
Guaranteed Safe Checkout
Categories: ,

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

PDF Catalog

PDF Pages PDF Title
1 30482696
34 A-30432543
35 undefined
37 CONTENTS
39 FOREWORD
41 1 Scope
2 Normative references
3 Terms and definitions
4 Abbreviated terms and symbols
4.1 Abbreviated terms
42 4.2 Symbols
5 Background and overview of methods
43 6 Apparatus
6.1 General
6.2 Light source
6.3 Input optics
6.4 Input positioner
6.5 Cladding mode stripper
6.6 Output positioner
6.7 Output optics
44 6.8 Computer
7 Samples and specimens
8 Procedure
9 Calculations of interpretation of results
45 10 Results
10.1 Information available with each measurement
10.2 Information available upon request
47 Annex A (normative) Continuous wave dual-frequency method
A.1 General
A.2 Apparatus
A.2.1 Layout of apparatus
Figure A.1 – Output spectral characteristics
48 A.2.2 Sources
A.2.3 Optical signal conditioning
Figure A.2 – Apparatus for method A
49 A.2.4 Power meters
A.2.5 Optical spectrum analyser
A.3 Samples and specimens
50 A.4 Procedure
A.4.1 General
A.4.2 Calibration
A.4.3 Operation
51 A.5 Calculations
A.5.1 Calculate phase values
A.5.2 Confirm assumptions
A.5.3 Complete the calculation
Figure A.3 – Relationship of phase to intensity ratio
52 Figure A.4 – Relationship of phase to power
53 Annex B (normative) Pulsed single-frequency method (PM)
B.1 General
B.2 Apparatus
B.2.1 Layout of apparatus
B.2.2 Source
B.2.3 Optical signal conditioning
Figure B.1 – Test set-up for method B
54 B.2.4 Power meters
B.2.5 Optical pulsewidth measurement
B.2.6 Optical spectrum analyser
B.3 Samples and specimens
Figure B.2 – Output spectra
55 B.4 Procedure
B.5 Calculations
B.5.1 Peak power
B.5.2 Phase shift
B.5.3 Complete the calculations
56 Figure B.3 – Phase vs. peak input power for method B
57 Annex C (informative) Guidance on the selection of fibre test length, power and difference in optical wavelength when using method A
Table C.1 – Fibre characteristics for method A (representative values)
58 Bibliography
BSI PD IEC TR 62285:2023 - TC
$186.33