BSI PD ISO/TS 12835:2022 – TC
$280.87
Tracked Changes. Qualification of casing connections for thermal wells
Published By | Publication Date | Number of Pages |
BSI | 2022 | 418 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
246 | undefined |
252 | Foreword |
253 | Introduction |
255 | 1 Scope 2 Normative references 3 Terms and definitions |
259 | 4 Abbreviated terms and symbols 4.1 Abbreviated terms |
260 | 4.2 Symbols |
261 | 5 Program overview 5.1 Illustrations of selected definitions 5.2 Program flowchart |
262 | 6 Overview and fundamental assumptions 6.1 General 6.2 Main features 6.2.1 Purpose |
263 | 6.2.2 Applicability to service conditions 6.2.3 Rationale for development 6.2.4 Subject of evaluation 6.2.5 Application severity levels |
264 | 6.3 Assessment philosophy and principles 6.3.1 Fundamental principles |
265 | 6.3.2 Conservative evaluation procedure 6.3.3 Mandatory and optional tasks |
266 | 6.3.4 Use of analysis and physical testing 6.3.5 Performance measures 6.3.6 Assessment criteria |
267 | 6.3.7 Task outcomes — data categories 6.3.8 Prior evaluation data 6.3.9 Treatment of confidential design information |
268 | 6.3.10 Interpretation of evaluation results 6.3.11 Avoiding perception of conflict of interest 6.4 Evaluation variables 6.4.1 Connection loading 6.4.2 Impacts of contributing variables |
270 | 6.4.3 Pin-box interferences and tapers 6.4.4 Material yield strength |
271 | 6.5 Evaluation procedure 6.5.1 Safety standards 6.5.2 Seepage assessment — random variations 6.5.3 Seepage rate thresholds |
272 | 6.5.4 Seal isolation 6.5.5 Dope entrapment 6.5.6 Thermal cycle test — bake-out and hold durations |
273 | 6.5.7 Pressure and temperature loading in thermal cycle test and analysis 6.5.8 Dependence of material strength on temperature |
274 | 6.6 Scope of reporting 7 Program roles and proprietary design information 7.1 Program execution roles 7.2 Proprietary connection design information |
275 | 8 Conformance requirements 8.1 Conformant evaluation program 8.2 Program non-conformances |
276 | 8.3 Performance acceptance 8.4 Conformance of results from previous evaluations 8.5 Use of data from previous evaluations |
277 | 8.6 Conformance to lower ASLs 9 Application severity levels 9.1 Thermal well load path |
279 | 9.2 Temperature as controlling parameter |
280 | 9.3 Specifications for application severity levels |
281 | 9.4 Selection of application severity level 10 Program blocks and tasks 10.1 Evaluation procedure overview |
285 | 10.2 Critical path tasks |
286 | 11 Program specifications 11.1 Task overview 11.2 Identification of program roles |
287 | 11.3 Identification of candidate connection |
288 | 11.4 Program options |
289 | 11.5 Data from prior evaluations 12 Determination of biased test population 12.1 Task overview |
290 | 12.2 Initial material property characterization 12.2.1 Task description, definitions, methods |
291 | 12.2.2 Testing conditions and scope |
293 | 12.2.3 Procedure for tensile tests |
294 | 12.2.4 Interpretation and processing of tensile test results |
299 | 12.3 Specimen configuration analysis 12.3.1 Task description |
300 | 12.3.2 Modelling and reporting requirements |
301 | 12.3.3 Nominal reference case |
302 | 12.3.4 Worst-case geometry configurations |
304 | 12.3.5 Seal taper analysis |
305 | 12.3.6 Impacts of material property variations |
308 | 12.3.7 Make-up torque for sealability tests |
310 | 12.3.8 Test versus production specimens 13 Specimen procurement 13.1 Task overview |
311 | 13.2 Specimen pipe procurement 13.3 Material property verification 13.3.1 Task description 13.3.2 Specimens for tensile verification tests |
312 | 13.3.3 Scope of tensile verification tests |
313 | 13.3.4 Coefficient of thermal expansion verification test |
314 | 13.4 Test specimen machining and gauging 13.4.1 General requirements 13.4.2 Specimen naming convention |
315 | 13.4.3 Specimen length and length-reference requirements |
316 | 13.4.4 Geometrical configurations 13.4.5 Mother pipe for specimens |
317 | 13.4.6 Specimen machining tolerances |
319 | 13.5 Markings 13.6 Specimen geometry verification 13.6.1 Gauging inspection scope |
320 | 13.6.2 Inspection extent – example cases 13.6.3 Geometry inspection guidelines |
321 | 13.7 Procurement and quality control of connection interfacial components 13.8 Specimen handling and storage 13.8.1 Handling recommendations |
322 | 13.8.2 Treatment of damaged specimens 14 Full-scale physical tests and supplementary analyses 14.1 Task overview |
323 | 14.2 Full-scale tests – general requirements 14.2.1 Ambient temperature at test site 14.2.2 Calibration of instrumentation |
324 | 14.2.3 Disabling of secondary seals 14.2.4 Seepage measurement and rate definitions |
326 | 14.2.5 Load application rates 14.2.6 Excluded connections |
327 | 14.3 Galling resistance test 14.3.1 Task description |
328 | 14.3.2 Rationale and objectives 14.3.3 Make-break specimens 14.3.4 Scope of galling resistance test |
329 | 14.3.5 Set-up and instrumentation |
330 | 14.3.6 Test procedure |
331 | 14.3.7 Performance assessment |
332 | 14.3.8 Reporting 14.4 Thermal cycle test 14.4.1 Task description 14.4.2 Rationale and objectives |
333 | 14.4.3 Thermal cycle specimens 14.4.4 Scope of thermal cycle test |
336 | 14.4.5 Mechanical strain compensations |
339 | 14.4.6 Set-up and instrumentation |
345 | 14.4.7 Test procedure |
350 | 14.4.8 Performance assessment |
351 | 14.4.9 Selection of cycled specimens for bend test and limit-strain test 14.4.10 Reporting 14.5 Bending evaluation |
352 | 14.6 Limit-strain test 14.6.1 Task description 14.6.2 Rationale and objectives |
353 | 14.6.3 Limit-strain specimens 14.6.4 Mandatory test description |
355 | 14.6.5 Set-up and instrumentation |
357 | 14.6.6 Mandatory test procedure |
362 | 14.6.7 Performance assessment 14.6.8 Reporting 14.7 As-tested configuration analysis 15 Evaluation and inspection reports 15.1 Reporting deliverables |
363 | 15.2 Reporting scope and contents |
367 | 15.3 Reporting templates |
368 | Annex A (informative) FEA modelling guidelines |
378 | Annex B (informative) Derivations of formulae – Strain compensation factors |
387 | Annex C (informative) Program role assignments and responsibilities |
394 | Annex D (informative) Optional program selections, tasks, and procedures |
417 | Bibliography |