Shopping Cart

No products in the cart.

CDC DesignConstructionStandards 2018

$64.35

CDC Reference Guidelines – Design & Construction Standards, Revised on June 15, 2018

Published By Publication Date Number of Pages
CDC 2018 709
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

None

PDF Catalog

PDF Pages PDF Title
1 Cover
2 REVISION HISTORY: (MOST RECENT RELEASE LISTED FIRST)
33 TABLE OF CONTENTS
40 1 INTRODUCTION
1 THE CENTERS FOR DISEASE CONTROL AND PREVENTION
2 THE GOAL
3 PURPOSE OF GUIDELINES
41 4 ORGANIZATION OF THE GUIDELINES
42 2 POLICY
2.0 Introduction
43 2.1 Administration of the Reference Guidelines
45 2.2 Codes and Standards
52 2.3 Accessibility
53 2.4 Sustainable Design and High Performance Building Guidelines
80 2.5 Furniture & Equipment Design and Procurement
81 2.6 Commissioning Policy
82 2.7 Hazardous Materials Policy
84 2.8 Energy Policy
86 2.9 Water Management Policy
88 2.10 Dispatch of Loads
90 2.11 Value Engineering
92 3 PROCEDURES
3.0 Introduction
93 3.1 CDC General Drawing Requirements (CAD
95 3.2 Drawing Requirements
96 3.3 Existing Condition Facility Documentation
101 3.4 Numbering Systems
107 3.5 Furniture Procurement
108 3.6 Commissioning
114 3.7 Hazardous Materials
3.8 Health and Safety
3.9 Operating and Maintenance Manuals
115 4 PLANNING AND DESIGN GUIDELINES
4.0 Introduction
116 4.1 General Planning Criteria
117 4.1.1 Master Plan
120 4.1.2 Environmental Health and Safety
123 4.1.3 Security
127 4.1.4 Civil & Site Development Guidelines
130 4.1.5 Campus Mechanical
135 4.1.6 Campus Electrical
140 4.1.7 Building Shell
141 4.1.8 General Facilities
168 4.2 General Laboratory Planning
175 4.2.1 Biological Laboratories
179 4.2.2 Chemical Laboratories
181 4.2.3 Engineering Laboratories
183 4.2.4 Radiation Laboratories
186 4.3 General Animal Facility Planning
197 4.3.1 Primate Facilities
200 4.3.2 Rodent Facilities
202 4.3.3 Canine Facilities
204 4.3.4 Insect Facilities
208 4.3.4a Flying Insect Facilities (Mosquitoes
212 4.3.4b Crawling Insect Facilities (Ticks, Mites, Lice, Fleas
214 4.4 Office Planning
219 4.5 Support Facilities Planning
4.5.0 Building Support Facilities
220 4.5.1 Conference Facilities With Videoconferencing
232 4.5.2 Cafeterias
234 4.5.3 Break Rooms
237 4.5.4 Vending Areas
239 4.5.5 Snack Bars
241 4.5.6 Travel Office
243 4.5.7 Share (Employee Store
245 4.5.8 Credit Union
247 4.5.9 Lifestyle Facilities
253 4.5.10 Lobby Areas
255 4.5.11 Toilet Facilities
259 4.5.12 Stairwells
262 4.5.13 Janitor Closets
264 4.5.14 Mechanical Rooms
267 4.5.15 Electrical Switchgear Rooms (Main Service Entrance
271 4.5.16 Electrical Rooms
275 4.5.17 Telephone Equipment Rooms (PBX
281 4.5.18 Telecommunication/LAN Rooms
286 4.5.19 Lactation Rooms
287 4.5.20 Campus Support Facilities
288 4.5.21 Central Utility Plants
292 4.5.22 Data Processing Facilities
297 4.5.23 Transshipping Facilities
300 4.5.24 Laboratory Chemical Storage Facilities
303 4.5.25 Waste Handling Facilities
306 4.5.26 Parking Facilities
310 4.5.27 Integrated Facilities Management System (IFMS
315 4.5.28 Stationary Storage Battery System Rooms
322 5 BUILDING ELEMENTS
323 5A SUBSTRUCTURE
5A0 Introduction
324 5A1 Foundations
5A1.10 Standard Foundations
325 5A1.20 Special Foundations
327 5A1.30 Slab On Grade
329 5A2 Below Grade Construction
5A2.10 Below Grade Excavations
330 5A2.20 Below Grade Walls
331 5B SHELL
5B.0 Introduction
332 5B1.10 Floor Construction
334 5B1.20 Roof Construction
335 5B2 Exterior Enclosure
5B2.10 Exterior Walls
338 5B2.20 Exterior Windows
339 5B2.30 Exterior Doors
340 5B3 Roofing
5B3.10 Roof Coverings
342 5B3.20 Roof Openings
343 5C INTERIORS
5C.0 Introduction
344 5C1 Interior Construction
5C1.10 Partitions
346 5C1.20 Interior Doors
351 5C1.30 Fittings
354 5C2 Stairs
5C2.10 Interior Stairs Construction
355 5C2.20 Interior Stair Finishes
356 5C3 Interior Finishes
5C3.10 Wall Finishes
358 5C3.20 Floor Finishes
362 5C3.30 Ceiling Finishes
363 5D SERVICES
5D0 Introduction
364 5D1 Conveying Systems
5D1.10 Elevators and Lifts
365 5D1.20 Escalators and Moving Walks
366 5D2 Plumbing Systems
367 5D2.10 Plumbing Fixtures
368 5D2.20 Domestic Water Distribution
370 5D2.30 Sanitary Waste and Vent Systems
371 5D2.40 Rain Water Drainage
372 5D2.50 Gas Distributing Systems
373 5D3 HVAC
5D3.10 Boiler Room Piping and Specialties
374 5D3.20 Piping Distribution Systems
376 5D3.21 Air Distribution Systems
381 5D3.22 Exhaust Ventilation Systems
382 5D3.23 Steam Distribution Systems
384 5D3.25 Glycol Distribution Systems
385 5D3.30 Building Automation Systems
391 5D3.40 Systems Testing and Balancing
395 5D4.10 Sprinklers
398 5D4.20 Standpipe Systems
399 5D4.30 Fire Pumps
400 5D4.40 Fire Protection Specialties
401 5D4.50 Other Fire Protection Systems
402 5D5 Electrical
5D5.10 Electrical Service & Distribution
430 5D5.11 Electrical Studies
440 5D5.20 Lighting & Branch Wiring
452 5D5.30 Communications, Security & Fire Alarm Systems
464 5D5.40 Lightning Protection/ Grounding
468 5D5.41 Emergency, Legally Required Standby, and Standby Power Systems
478 5D5.42 Special Equipment
482 5D5.43 Communication And Signaling Systems
483 5D5.44 Freezer Alarm System
484 5E EQUIPMENT & FURNISHINGS
5E0 Introduction
486 5E1 Equipment
5E1.10 Office And Office Support Equipment
490 5E1.20 Laboratory And Laboratory Support Equipment
493 5E1.30 Vehicular Equipment
494 5E2 Furnishings
5E2.10 Fixed Furnishings
496 5E2.20 Movable Furnishings
508 5F SPECIAL CONSTRUCTION & DEMOLITION
5F0 Introduction
509 5F1 Special Construction Systems
5F1.10 Special Structures
510 5F1.20 Integrated Construction
512 5F1.50 Special Controls & Instrumentation
513 5F2 Selective Building Demolition
5F2.10 Building Elements Demolition
514 5F2.20 Hazardous Components Abatement
515 5G BUILDING SITEWORK
5G0 General
517 5G1 Site Preparation
518 5G1.10 Site Preparation
520 5G1.20 Site Demolition & Relocation
522 5G1.30 Site Earthwork
524 5G1.40 Hazardous Waste Remediation
525 5G2 Site Improvements
5G2.10 Roadways
527 5G2.20 Parking Lots
529 5G2.30 Pedestrian Circulation
531 5G2.40 Site Development
534 5G2.50 Landscaping
537 5G2.60 Irrigation
539 5G3 Site Mechanical Utilities
5G3.10 Water Supply
541 5G3.20 Sanitary Sewer
542 5G3.30 Storm Sewer
544 5G3.40 Heating Distribution
545 5G3.50 Cooling Distribution
546 5G3.60 Fuel Distribution
548 5G4 Site Electrical Utilities
5G4.10 Electrical Distribution
550 5G4.20 Site Lighting
552 5G4.30 Site Communications & Security
553 5G4.90 Other Site Electrical Utilities
554 5G5 Other Site Construction
5G5.10 Service And Pedestrian Tunnels
555 5G5.20 Pest Management Program During Construction
556 6 APPENDIX
6.01 Request for Exception Form
557 6.02 Request for Clarification Form
558 6.10 Interiors
588 6.30 Document components, writing/editing rules and UniFormat
589 6.40 Survey Control Monuments’ Locations and Descriptions
590 6.50 Acronyms
594 6.60 Glossary
595 6.70 Accessibility
598 6.80 Facilities Master Planning Guide
599 6.90 Wayfinding Masterplan
608 6.20 HHS Office Design Guidelines
653 6.91 BAS Graphics Standards
682 6.92 Lactation Support Program
689 6.93 Electrical
CDC DesignConstructionStandards 2018
$64.35