CDC DesignConstructionStandards 2018
$64.35
CDC Reference Guidelines – Design & Construction Standards, Revised on June 15, 2018
Published By | Publication Date | Number of Pages |
CDC | 2018 | 709 |
None
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | Cover |
2 | REVISION HISTORY: (MOST RECENT RELEASE LISTED FIRST) |
33 | TABLE OF CONTENTS |
40 | 1 INTRODUCTION 1 THE CENTERS FOR DISEASE CONTROL AND PREVENTION 2 THE GOAL 3 PURPOSE OF GUIDELINES |
41 | 4 ORGANIZATION OF THE GUIDELINES |
42 | 2 POLICY 2.0 Introduction |
43 | 2.1 Administration of the Reference Guidelines |
45 | 2.2 Codes and Standards |
52 | 2.3 Accessibility |
53 | 2.4 Sustainable Design and High Performance Building Guidelines |
80 | 2.5 Furniture & Equipment Design and Procurement |
81 | 2.6 Commissioning Policy |
82 | 2.7 Hazardous Materials Policy |
84 | 2.8 Energy Policy |
86 | 2.9 Water Management Policy |
88 | 2.10 Dispatch of Loads |
90 | 2.11 Value Engineering |
92 | 3 PROCEDURES 3.0 Introduction |
93 | 3.1 CDC General Drawing Requirements (CAD |
95 | 3.2 Drawing Requirements |
96 | 3.3 Existing Condition Facility Documentation |
101 | 3.4 Numbering Systems |
107 | 3.5 Furniture Procurement |
108 | 3.6 Commissioning |
114 | 3.7 Hazardous Materials 3.8 Health and Safety 3.9 Operating and Maintenance Manuals |
115 | 4 PLANNING AND DESIGN GUIDELINES 4.0 Introduction |
116 | 4.1 General Planning Criteria |
117 | 4.1.1 Master Plan |
120 | 4.1.2 Environmental Health and Safety |
123 | 4.1.3 Security |
127 | 4.1.4 Civil & Site Development Guidelines |
130 | 4.1.5 Campus Mechanical |
135 | 4.1.6 Campus Electrical |
140 | 4.1.7 Building Shell |
141 | 4.1.8 General Facilities |
168 | 4.2 General Laboratory Planning |
175 | 4.2.1 Biological Laboratories |
179 | 4.2.2 Chemical Laboratories |
181 | 4.2.3 Engineering Laboratories |
183 | 4.2.4 Radiation Laboratories |
186 | 4.3 General Animal Facility Planning |
197 | 4.3.1 Primate Facilities |
200 | 4.3.2 Rodent Facilities |
202 | 4.3.3 Canine Facilities |
204 | 4.3.4 Insect Facilities |
208 | 4.3.4a Flying Insect Facilities (Mosquitoes |
212 | 4.3.4b Crawling Insect Facilities (Ticks, Mites, Lice, Fleas |
214 | 4.4 Office Planning |
219 | 4.5 Support Facilities Planning 4.5.0 Building Support Facilities |
220 | 4.5.1 Conference Facilities With Videoconferencing |
232 | 4.5.2 Cafeterias |
234 | 4.5.3 Break Rooms |
237 | 4.5.4 Vending Areas |
239 | 4.5.5 Snack Bars |
241 | 4.5.6 Travel Office |
243 | 4.5.7 Share (Employee Store |
245 | 4.5.8 Credit Union |
247 | 4.5.9 Lifestyle Facilities |
253 | 4.5.10 Lobby Areas |
255 | 4.5.11 Toilet Facilities |
259 | 4.5.12 Stairwells |
262 | 4.5.13 Janitor Closets |
264 | 4.5.14 Mechanical Rooms |
267 | 4.5.15 Electrical Switchgear Rooms (Main Service Entrance |
271 | 4.5.16 Electrical Rooms |
275 | 4.5.17 Telephone Equipment Rooms (PBX |
281 | 4.5.18 Telecommunication/LAN Rooms |
286 | 4.5.19 Lactation Rooms |
287 | 4.5.20 Campus Support Facilities |
288 | 4.5.21 Central Utility Plants |
292 | 4.5.22 Data Processing Facilities |
297 | 4.5.23 Transshipping Facilities |
300 | 4.5.24 Laboratory Chemical Storage Facilities |
303 | 4.5.25 Waste Handling Facilities |
306 | 4.5.26 Parking Facilities |
310 | 4.5.27 Integrated Facilities Management System (IFMS |
315 | 4.5.28 Stationary Storage Battery System Rooms |
322 | 5 BUILDING ELEMENTS |
323 | 5A SUBSTRUCTURE 5A0 Introduction |
324 | 5A1 Foundations 5A1.10 Standard Foundations |
325 | 5A1.20 Special Foundations |
327 | 5A1.30 Slab On Grade |
329 | 5A2 Below Grade Construction 5A2.10 Below Grade Excavations |
330 | 5A2.20 Below Grade Walls |
331 | 5B SHELL 5B.0 Introduction |
332 | 5B1.10 Floor Construction |
334 | 5B1.20 Roof Construction |
335 | 5B2 Exterior Enclosure 5B2.10 Exterior Walls |
338 | 5B2.20 Exterior Windows |
339 | 5B2.30 Exterior Doors |
340 | 5B3 Roofing 5B3.10 Roof Coverings |
342 | 5B3.20 Roof Openings |
343 | 5C INTERIORS 5C.0 Introduction |
344 | 5C1 Interior Construction 5C1.10 Partitions |
346 | 5C1.20 Interior Doors |
351 | 5C1.30 Fittings |
354 | 5C2 Stairs 5C2.10 Interior Stairs Construction |
355 | 5C2.20 Interior Stair Finishes |
356 | 5C3 Interior Finishes 5C3.10 Wall Finishes |
358 | 5C3.20 Floor Finishes |
362 | 5C3.30 Ceiling Finishes |
363 | 5D SERVICES 5D0 Introduction |
364 | 5D1 Conveying Systems 5D1.10 Elevators and Lifts |
365 | 5D1.20 Escalators and Moving Walks |
366 | 5D2 Plumbing Systems |
367 | 5D2.10 Plumbing Fixtures |
368 | 5D2.20 Domestic Water Distribution |
370 | 5D2.30 Sanitary Waste and Vent Systems |
371 | 5D2.40 Rain Water Drainage |
372 | 5D2.50 Gas Distributing Systems |
373 | 5D3 HVAC 5D3.10 Boiler Room Piping and Specialties |
374 | 5D3.20 Piping Distribution Systems |
376 | 5D3.21 Air Distribution Systems |
381 | 5D3.22 Exhaust Ventilation Systems |
382 | 5D3.23 Steam Distribution Systems |
384 | 5D3.25 Glycol Distribution Systems |
385 | 5D3.30 Building Automation Systems |
391 | 5D3.40 Systems Testing and Balancing |
395 | 5D4.10 Sprinklers |
398 | 5D4.20 Standpipe Systems |
399 | 5D4.30 Fire Pumps |
400 | 5D4.40 Fire Protection Specialties |
401 | 5D4.50 Other Fire Protection Systems |
402 | 5D5 Electrical 5D5.10 Electrical Service & Distribution |
430 | 5D5.11 Electrical Studies |
440 | 5D5.20 Lighting & Branch Wiring |
452 | 5D5.30 Communications, Security & Fire Alarm Systems |
464 | 5D5.40 Lightning Protection/ Grounding |
468 | 5D5.41 Emergency, Legally Required Standby, and Standby Power Systems |
478 | 5D5.42 Special Equipment |
482 | 5D5.43 Communication And Signaling Systems |
483 | 5D5.44 Freezer Alarm System |
484 | 5E EQUIPMENT & FURNISHINGS 5E0 Introduction |
486 | 5E1 Equipment 5E1.10 Office And Office Support Equipment |
490 | 5E1.20 Laboratory And Laboratory Support Equipment |
493 | 5E1.30 Vehicular Equipment |
494 | 5E2 Furnishings 5E2.10 Fixed Furnishings |
496 | 5E2.20 Movable Furnishings |
508 | 5F SPECIAL CONSTRUCTION & DEMOLITION 5F0 Introduction |
509 | 5F1 Special Construction Systems 5F1.10 Special Structures |
510 | 5F1.20 Integrated Construction |
512 | 5F1.50 Special Controls & Instrumentation |
513 | 5F2 Selective Building Demolition 5F2.10 Building Elements Demolition |
514 | 5F2.20 Hazardous Components Abatement |
515 | 5G BUILDING SITEWORK 5G0 General |
517 | 5G1 Site Preparation |
518 | 5G1.10 Site Preparation |
520 | 5G1.20 Site Demolition & Relocation |
522 | 5G1.30 Site Earthwork |
524 | 5G1.40 Hazardous Waste Remediation |
525 | 5G2 Site Improvements 5G2.10 Roadways |
527 | 5G2.20 Parking Lots |
529 | 5G2.30 Pedestrian Circulation |
531 | 5G2.40 Site Development |
534 | 5G2.50 Landscaping |
537 | 5G2.60 Irrigation |
539 | 5G3 Site Mechanical Utilities 5G3.10 Water Supply |
541 | 5G3.20 Sanitary Sewer |
542 | 5G3.30 Storm Sewer |
544 | 5G3.40 Heating Distribution |
545 | 5G3.50 Cooling Distribution |
546 | 5G3.60 Fuel Distribution |
548 | 5G4 Site Electrical Utilities 5G4.10 Electrical Distribution |
550 | 5G4.20 Site Lighting |
552 | 5G4.30 Site Communications & Security |
553 | 5G4.90 Other Site Electrical Utilities |
554 | 5G5 Other Site Construction 5G5.10 Service And Pedestrian Tunnels |
555 | 5G5.20 Pest Management Program During Construction |
556 | 6 APPENDIX 6.01 Request for Exception Form |
557 | 6.02 Request for Clarification Form |
558 | 6.10 Interiors |
588 | 6.30 Document components, writing/editing rules and UniFormat |
589 | 6.40 Survey Control Monuments’ Locations and Descriptions |
590 | 6.50 Acronyms |
594 | 6.60 Glossary |
595 | 6.70 Accessibility |
598 | 6.80 Facilities Master Planning Guide |
599 | 6.90 Wayfinding Masterplan |
608 | 6.20 HHS Office Design Guidelines |
653 | 6.91 BAS Graphics Standards |
682 | 6.92 Lactation Support Program |
689 | 6.93 Electrical |