FEMA P 2062 GuidelinesWindVulnerability 2019
$20.80
FEMA P-2062, Guidelines Wind Vulnerability
Published By | Publication Date | Number of Pages |
FEMA | 2019 | 222 |
None
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | Front Cover |
2 | Title Page |
3 | Publication Notes |
4 | Acknowledgements |
5 | Contents |
8 | List of Figures |
23 | List of Tables |
24 | Acronyms and Abbreviations |
26 | Chapter 1: Introduction |
28 | 1.1 Common Wind Vulnerabilities |
31 | 1.2 Tornadoes |
32 | 1.2.1 Occupant Protection |
33 | 1.2.2 Building Damage |
35 | 1.2.3 Continuity of Operations 1.3 Hurricanes |
36 | 1.4 Organization of the Manual |
37 | Chapter 2: General Issues |
38 | 2.1 Facilities Recommended for Assessment |
39 | 2.2 Assessment Team 2.3 General Guidelines for Assessing the Building Structure and Envelope |
40 | 2.4 Facility Owner’s Performance Expectations |
41 | 2.5 Assessment Process |
42 | 2.5.1 Level 1 and Level 2 Assessments |
43 | 2.5.2 Data Analysis 2.5.3 Assessment Findings Report |
45 | 2.5.4 Prioritizing Mitigation of Identified Vulnerabilities |
93 | 5.3.1.1 Design Assumptions |
94 | 5.3.1.2 Common Wall Types |
95 | 5.3.1.3 Identifying Masonry Veneers |
97 | 5.3.1.4 Veneer Failure and Vulnerabilities |
99 | 5.3.1.5 Level 1 Assessment of Masonry Veneer |
107 | 5.3.1.6 Level 2 Assessment of Masonry Veneer |
112 | 5.3.1.7 Laboratory Testing |
113 | 5.3.2 Concrete Masonry Units |
114 | 5.3.2.1 Level 1 Assessment |
115 | 5.3.2.2 Level 2 Assessment 5.3.3 Exterior Insulation and Finish Systems and Portland Cement Plaster (Stucco) |
116 | 5.3.3.1 Exterior Insulation and Finish Systems |
130 | 5.3.3.2 Portland Cement Plaster (Stucco) |
136 | 5.3.4 Metal Wall Panels 5.3.4.1 Level 1 Assessment of Metal Panels |
138 | 5.3.4.2 Level 2 Assessment of Metal Panels |
141 | 5.3.5 Precast Non-Load-Bearing Wall Panels 5.3.5.1 Exterior Cladding |
142 | 5.3.6 Siding (Fiber Cement, Vinyl, Plywood, Wood Boards) 5.3.6.1 Fiber Cement Siding |
147 | 5.3.6.2 Vinyl |
150 | 5.3.6.3 Plywood |
151 | 5.3.6.4 Wood Board |
153 | 5.3.7 Soffits 5.3.7.1 Level 1 Assessment of Soffits |
154 | 5.3.7.2 Level 2 Assessment of Soffits 5.4 Roof Systems |
155 | 5.4.1 Level 1 Assessment of Roof Systems |
157 | 5.4.1.1 Membrane Roof Systems |
162 | 5.4.1.2 Asphalt Shingles |
165 | 5.4.1.3 Metal Panels |
167 | 5.4.1.4 Tile |
169 | 5.4.1.5 Vegetative Roofs 5.4.2 Level 2 Assessment of Roof Systems |
175 | 5.5 Exterior-Mounted Equipment 5.5.1 Level 1 Assessment of Exterior-Mounted Equipment 5.5.1.1 Mechanical Equipment, Equipment Screens, and Louvers |
185 | 5.5.1.2 Communications Towers and Light Fixture Poles |
187 | 5.5.1.3 Satellite Dishes 5.5.1.4 Lightning Protection Systems |
190 | 5.5.1.5 Solar Arrays |
199 | 5.5.2 Level 2 Assessment of Exterior-Mounted Equipment |
200 | Chapter 6: Municipal Utilities 6.1 Electric Utilities |
201 | 6.1.1 Duration of Electrical Power Loss |
202 | 6.1.2 Assessment of Equipment Needing Emergency Power |
205 | 6.2 Providing Emergency Power 6.2.1 Permanent Generators |
207 | 6.2.2 Temporary Generators |
209 | 6.3 Water Service |
211 | 6.4 Sewer Service |
214 | Chapter 7: References and Resources |