Shopping Cart

No products in the cart.

GA CityofSugarHill 2 N/A

$59.80

The 2002 Development Regulations – City of Sugar Hill, Georgia

Published By Publication Date Number of Pages
GA N/A 171
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

None

PDF Catalog

PDF Pages PDF Title
1 TITLE PAGE
2 TABLE OF CONTENTS
9 Setbacks————————————8.31
Maintenance———————————8.31
15 AMENDMENTS
17 ARTICLE 1 – AUTHORITY, TITLE, PURPOSE AND INTENT
19 ARTICLE 2 – DEFINITIONS
30 ARTICLE 3 – APPLICATION OF THE REGULATIONS
35 ARTICLE 4 – PERMITS REQUIRED FOR DEVELOPMENT OR CONSTRUCTION
43 ARTICLE 5 – GENERAL REQUIREMENTS
48 Dwelling/ Living Units – Size of Pool
TABLE 5B
50 ARTICLE 6 – ACCESS AND RIGHT-OF-WAY REQUIREMENTS; AND STREET IMPROVEMENT AND CONSTRUCTION REQUIREMENTS
ARTICLE 6
ACCESS AND RIGHT-OF-WAY REQUIREMENTS;
AND STREET IMPROVEMENT AND CONSTRUCTION
REQUIREMENTS
6.1 ACCESS
51 6.2.1 Dedication of Street Right-of-Way
6.3 MINIMUM RIGHT-OF-WAY AND STREET IMPROVEMENTS
53 6.3.3 Project Access Improvements – Single Family Detached Single Family Attached, and Duplex Residential Subdivisions.
55 6.3.5 New Streets
6.3.6 Substandard Streets
56 6.3.7 Improvements Along State Highways
6.4 GENERAL LAYOUT REQUIREMENTS
6.4.1 Conformance
6.4.2 Local Streets and Minor Collectors
57 6.4.3 Cul-de-sac Streets
6.4.4 Other Dead End Streets
58 6.4.6 Half-Streets
6.4.7 Reserve Strips
6.4.8 Alleys
6.4.9 Street Jogs
59 6.5.1 Traffic Control Signs
6.5.2 Street Name Signs
6.5.3 Traffic Signals and Signs
6.5.4 Striping Requirements
6.5.5 Payment of Fees
6.5.6 Street Lights
61 6.9 NEW LOCAL AND MINOR COLLECTOR STREETS
62 6.10 NEW MAJOR THOROUGHFARES
TABLE 6-B
CONSTRUCTION STANDARDS FOR MAJOR THOROUGHFARES
63 6.11 CURB AND GUTTER
64 6.12 UNDERGROUND UTILITIES
6.13 SIDEWALKS
66 ARTICLE 7 – UTILITIES AND EASEMENTS
71 ARTICLE 8 – SITE GRADING, STORMWATER DETENTION, CULVERTS AND PIPED DRAINAGE SYSTEMS AND SOIL SEDIMENT CONTROL REQUIREMENTS
106 ARTICLE 9 -PERFORMANCE GUIDELINES
127 ARTICLE 10 – PLAN AND PLAT SPECIFICATIONS
ARTICLE 10
PLAN AND PLAT SPECIFICATIONS
137 a. Final Surveyor’s Certificate:
By:________________________________________________
REGISTERED GEORGIA LAND SURVEYOR
REG. NO _____________ DATE OF EXPIRATION ______________
b. Owners Acknowledgment and Declaration
138 d. Health Department Certification (for Subdivisions Served by Septic Tanks):
DATED THIS _____________ DAY OF _________________, 20___.
BY: _____________________________________________________
TITLE:___________________________________________________
GWINNETT COUNTY HEALTH DEPARTMENT
e. Public Notice – Drainage:
139 RDP – RESIDENTIAL DRAINAGE PLAN
RDS – RESIDENATIL DRAINAGE STUDY
147 Every Site Plan shall contain the following statement:
148 ARTICLE 11 – PROCEDURES
162 b. The maintenance period may be extended by the City Manager at the request of the Developer and if any of the required public improvements are delayed beyond the first 18 months, provided it is in the best interest of the health, safety and welfare …
c. The maintenance period shall not be less than 18 months from installation of the street wearing course and shall be extended equal to any extension of time for the Performance Bond granted by the City Manager but not to exceed 24 months.
d. All other public improvements shall be covered by a maintenance period of at least 12 months following the date of installation.
164 ARTICLE 12 – FEES
165 ARTICLE 13 – ADMINISTRATION, APPEAL AND VIOLATIONS
169 ARTICLE 14 – ADOPTION AND AMENDMENT
GA CityofSugarHill 2 N/A
$59.80