IEEE 1534 2009
$52.54
IEEE Recommended Practice for Specifying Thyristor-Controlled Series Capacitors
Published By | Publication Date | Number of Pages |
IEEE | 2009 | 99 |
Revision Standard – Active. Recommended practices for specifying Thyristor-Controlled Series Capacitor (TCSC) installations used in series with transmission lines are provided. Ratings for TCSC thyristor valve assemblies, capacitors, and reactors as well as TCSC control characteristics, protective features, cooling systems, testing, commissioning, training, documentation, operation, and maintenance are addressed in this standard.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | IEEE Std 1534-2009 Front Cover |
3 | Title Page |
6 | Introduction Notice to users Laws and regulations Copyrights |
7 | Updating of IEEE documents Errata Interpretations Patents |
8 | Participants |
10 | Contents |
13 | IEEE Recommended Practice for Specifying Thyristor-ControlledSeries Capacitors 1. Overview 1.1 Scope 1.2 Purpose 2. Normative references |
14 | 3. Definitions, special symbols, acronyms, and abbreviations 3.1 Definitions |
16 | 3.2 Special symbols |
17 | 3.3 Acronyms and abbreviations |
18 | 4. Service conditions 5. Operating and rating considerations 5.1 Introduction |
21 | 5.2 TCSC characteristics |
23 | 5.3 Basis for TCSC ratings |
27 | 5.4 Duty cycle |
30 | 5.5 Operational objectives |
33 | 6. Thyristor valves (bidirectional) 6.1 Current and voltage capability |
37 | 6.2 Valve control |
41 | 6.3 Valve cooling system 6.4 Mechanical design |
42 | 6.5 Valve testing |
45 | 7. Capacitors and reactors 7.1 General |
46 | 7.2 Capacitor considerations 7.3 Reactor considerations |
47 | 8. Control and protection 8.1 Control |
51 | 8.2 Protection |
52 | 8.3 Monitoring and recording |
55 | 8.4 Signal transmission and platform power |
56 | 8.5 General requirements |
57 | 8.6 Coordination with line protection 9. Layout 9.1 General |
58 | 9.2 Substation yard 9.3 Platform assemblies 9.4 Control building |
59 | 10. Safety 10.1 Personnel protection 10.2 Discharge devices 10.3 Grounding provisions 10.4 Handling and disposal 11. Testing and commissioning 11.1 Introduction |
60 | 11.2 Design and production tests and factory control system tests |
61 | 11.3 On-site tests |
63 | 12. Losses and loss evaluation 12.1 Introduction 12.2 Ambient conditions |
64 | 12.3 Calculation of losses |
65 | 13. Reliability, availability, and maintainability 13.1 Introduction |
66 | 13.2 Definitions 13.3 RAM analysis 13.4 Spare parts |
67 | 13.5 Availability and reliability |
68 | 14. Project scope 14.1 Introduction 14.2 New TCSC installations |
69 | 14.3 Retrofit to an existing fixed-series capacitor installation |
70 | 15. Training 15.1 General 15.2 Off-site training |
71 | 15.3 On-site training 15.4 Training during commissioning |
72 | 16. Documentation 16.1 Introduction 16.2 Purchaser documentation 16.3 Supplier documentation |
75 | Annex A (informative)Bibliography and annotated bibliography A.1 Bibliography |
76 | A.2 Annotated bibliography |
82 | Annex B (informative)TCSC application studies and computer models B.1 Application studies |
85 | B.2 TCSC computer models (Angquist et al. [B2]; Larsen et al. [B17]) |
91 | B.3 Legend |
92 | Annex C (normative)Summary outline of TCSC specification C.1 General C.2 AC transmission system |
93 | C.3 TCSC |
98 | C.4 Thyristor valves C.5 Capacitors and reactors C.6 TCSC control and protection C.7 Layout C.8 Safety |
99 | C.9 Testing and commissioning C.10 Losses and loss evaluation C.11 Reliability, availability, and maintainability C.12 Training C.13 Documentation |