IEEE 1775 2011
$50.38
IEEE Standard for Power Line Communication Equipment–Electromagnetic Compatibility (EMC) Requirements–Testing and Measurement Methods
Published By | Publication Date | Number of Pages |
IEEE | 2011 | 66 |
New IEEE Standard – Active. Electromagnetic compatibility (EMC) criteria and consensus test and measurements procedures for broadband over power line (BPL) communication equipment and installations are presented. Existing national and international standards for BPL equipment and installations are referenced. This standard does not include the specific emission limits, which are subject to national regulations.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | IEEE Std 1775-2010 Front cover |
3 | Title page |
6 | Introduction |
7 | Notice to users Laws and regulations Copyrights Updating of IEEE documents Errata |
8 | Interpretations Patents Participants |
11 | Contents |
13 | Important notice 1. Overview 1.1 Scope 1.2 Purpose |
14 | 2. Normative references |
15 | 3. Definitions, acronyms, and abbreviations |
16 | 3.1 Definitions |
18 | 3.2 Acronyms |
19 | 4. BPL networks typical installations 4.1 Topologies |
20 | 4.2 Physical differences 4.3 Electrical non-BPL equipment |
21 | 4.4 Power line noise 4.5 Examples of typical installation |
24 | 4.6 Description of ports |
25 | 5. Environmental conditions during testing 5.1 In-premises BPL equipment 5.2 Access BPL equipment 6. General operational conditions and test configurations |
26 | 6.1 Radiated emission testing |
27 | 6.2 Immunity testing 7. Disturbance emission measurement methods 7.1 Access equipment |
31 | 7.2 In-premises equipment |
34 | 7.3 Radiated emission measurement uncertainty 7.4 Test report template |
35 | 8. Immunity test methods and criteria 8.1 Electrostatic discharge |
36 | 8.2 Electrical fast transient/burst |
38 | 8.3 Surges |
42 | 8.4 Continuous conducted signals |
46 | 8.5 Radiated electromagnetic field |
48 | 8.6 Voltage dips and interruption |
49 | 8.7 Power frequency magnetic field 8.8 Performance criteria and applicability |
52 | 8.9 Test report template |
53 | Annex A (normative) Procedure for determining distance correction factor A.1 Introduction |
54 | A.2 Procedure |
56 | Annex B (informative) Emission and Immunity Test Report content B.2 Immunity Test Report |
58 | Annex C (informative) Methods for distinguishing BPL signals from ambient signals |
59 | Annex D (informative) Radiated emissions measurement uncertainty |
61 | Annex E (informative) Selection of typical installations |
62 | Annex F (informative) Recommendations for resolving harmful interference cases near BPLequipment and installations F.1 Guidance for electromagnetically compatible BPL operation F.2 Investigation of radio interference complaints |
64 | Annex G (informative) Bibliography |