IEEE C37.122.1 1993:1994 Edition
$61.75
IEEE Guide for Gas-Insulated Substations
Published By | Publication Date | Number of Pages |
IEEE | 1994 | 71 |
Revision Standard – Active. This IEEE Standards product is part of the C37 family on Switchgear, Substations and Protective Relays. The technical requirements for the design, fabrication, testing, and installation of a gas-insulated substation (GIS) are covered. Parameters to be supplied by the purchaser are suggested, and technical requirements for the design, fabrication, testing, and installation to be furnished by the manufacturer are established.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | Title page |
3 | Introduction Participants |
7 | CONTENTS |
9 | 1. Overview 2. References |
10 | 3. Definitions |
13 | 4. Guidelines for GIS 4.1 GIS arrangement |
15 | 4.2 Installation and equipment handling |
20 | 4.3 Control wiring—Practices in GIS |
21 | 4.4 Gas handling—SF6 and GIS |
30 | 4.5 Safe operating procedures |
31 | 4.6 GIS grounding 4.7 Seismic requirements |
49 | 4.8 Partial discharge (PD) testing |
54 | 4.9 Very fast transients in GIS |
62 | 4.10 Field dielectric testing |
65 | 4.11 Maintenance and repair |
67 | 5. Bibliography |