IEEE C57.150-2023
$43.33
IEEE Guide for the Transportation of Transformers and Reactors Rated 10 000 kVA or Higher (Published)
Published By | Publication Date | Number of Pages |
IEEE | 2023 | 58 |
Revision Standard – Active. Information for reducing the risk of damage and delays during the transportation of transformers and reactors rated 10 000 kVA or higher is provided in this guide.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | IEEE Std C57.150™-2023 Front cover |
2 | Title page |
4 | Important Notices and Disclaimers Concerning IEEE Standards Documents |
8 | Participants |
10 | Introduction |
11 | Contents |
13 | 1. Overview 1.1 Scope 1.2 Purpose 1.3 Word usage |
14 | 2. Normative references 3. Definitions, acronyms, and abbreviations 3.1 Definitions |
18 | 3.2 Acronyms and abbreviations 4. Request for quotation and specification |
19 | 5. Design considerations for transport 5.1 New transformers and reactors 5.2 Existing transformers and reactors |
20 | 5.3 Internal Bracing |
21 | 5.4 Main transformer or reactor tank |
25 | 5.5 Transportation preparation—accessories |
28 | 6. Planning for heavy-haul transporation 6.1 General |
29 | 6.2 Heavy-haul situations 6.3 Identifying suitable heavy-hauler companies |
30 | 6.4 Determinations of actual equipment transportation dimensions |
31 | 6.5 Route inspections and verification of transportation route |
32 | 6.6 Selection of proper heavy-haul equipment |
33 | 6.7 Applicable safety and environmental requirements, regulations, and laws 6.8 Permits 6.9 Insurance coverage 7. Transport 7.1 Transportation information |
34 | 7.2 Equipment orientation 7.3 Transport terminology |
36 | 7.4 Barge and ocean vessels |
39 | 7.5 Rail |
42 | 7.6 Air cargo 8. Heavy-haul transportation 8.1 General 8.2 Condition of heavy-haul equipment 8.3 Inspection of equipment prior to receiving |
43 | 8.4 Offloading the equipment onto heavy-haul transportation equipment 8.5 Securing the load |
44 | 8.6 Transportation to the destination 9. Arrival (receipt) inspection 9.1 General 9.2 Preparation for inspection |
45 | 9.3 Visual checks |
46 | 9.4 Offloading considerations |
47 | 9.5 Up-righting of large shell-form transformers or reactors 9.6 Inspection and offloading of separately shipped parts and components accessories |
48 | 9.7 Internal inspection |
50 | 9.8 Electrical tests |
53 | 9.9 Mechanical tests |
54 | 10. Transportation and Delivery Flow Chart—Swim Lane Concept |
57 | Annex A (informative) Bibliography |
58 | Back cover |