Shopping Cart

No products in the cart.

SMACNA HVACDuctSystemsInspectionGuide 2006 03E

$87.21

HVAC Duct Systems Inspection Guide, 3rd Edition

Published By Publication Date Number of Pages
SMACNA 2006 162
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

Contains guidelines for inspection of commercial HVAC duct systems for compliance with SMACNA/ANSI HVAC Duct Construction Standards—Metal and Flexible, (3rd Ed.) and Fibrous Glass Duct Construction Standards (7th Ed.). It reviews materials and reinforcement of duct systems, as well as assembly and supports of ducts. The Fire, Smoke and Radiation Damper Guide (5th Ed.) also summarizes installation details. Checklists are included for ductwork and fire dampers. Valuable as a study guide for the HVAC Duct Construction Standards manual and for learning inspection procedures in general. Includes soft metrics.

PDF Catalog

PDF Pages PDF Title
5 FOREWORD
6 FORMER TASK FORCE MEMBERS AND OTHER CONTRIBUTORS
7 NOTICE TO USERS OF THIS PUBLICATION
11 TABLE OF CONTENTS
17 CHAPTER 1 SCOPE
1.1 SCOPE
1.2 WHAT IS THE PURPOSE OF INSPECTION?
1.3 WHAT IS THE VALUE OF INSPECTION?
1.4 WHAT IS THE COST OF INSPECTION?
1.5 DOES THE TIMING OF INSPECTIONS AFFECT CONSTRUCTION COSTS?
1.6 WHAT RISKS ARE INVOLVED WHEN INSPECTIONS ARE NOT DONE OR ARE NOT DONE PROPERLY?
18 1.7 WHAT QUALIFICATIONS ARE NEEDED BY INSPECTORS?
1.8 HOW DO I USE THIS GUIDE?
1.9 DUCT INSPECTIONS OVERVIEW
23 CHAPTER 2 COMPLIANCE AND QUALITY CONTROL
2.1 COMPLIANCE AND QUALITY CONTROL
2.2 CHECKLISTS
31 APPENDIX A FUNCTIONS OF DUCTED AIR HANDLING SYSTEMS
A.1 VENTILATION AND AIR CONDITIONING
A.2 CENTRAL AIR HANDLING SYSTEM
A.3 DEDICATED EXHAUST SYSTEMS
A.4 ROOM AIR DISTRIBUTION
32 A.5 ROOM PRESSURE CONTROL
A.6 INFILTRATION AND EXFILTRATION
A.7 CENTRAL ALARM CONTROL STATIONS
A.8 TESTING AND BALANCING
A.9 SYMBOLS
34 FIGURE A-1 SYMBOLS FOR HVAC SYSTEMS
35 FIGURE A-1M SYMBOLS FOR HVAC SYSTEMS (METRIC)
36 FIGURE A-2 SINGLE DUCT SYSTEM
FIGURE A-3 TERMINAL REHEAT SYSTEM
37 FIGURE A-4 MULTI-ZONE SYSTEM
FIGURE A-5 VARIABLE VOLUME SYSTEM
38 FIGURE A-6 DUCT SYSTEM EXAMPLE
39 FIGURE A-6M DUCT SYSTEM EXAMPLE (METRIC)
40 FIGURE A-7 DUCT PRESSURE CLASS DESIGNATION
43 APPENDIX B DUCT CONSTRUCTION MATERIALS
B.1 GALVANIZED STEEL
B.2 CARBON STEEL (BLACK IRON)
B.3 STAINLESS STEEL
B.4 ALUMINUM
B.5 COPPER
B.6 FIBERGLASS REINFORCED PLASTIC (FRP)
44 B.7 POLYVINYL CHLORIDE (PVC)
B.8 POLYVINYL STEEL (PVS)
B.9 CONCRETE
B.10 ASBESTOS CEMENT
B.11 RIGID FIBROUS GLASS
B.12 GYPSUM BOARD
45 Table B-1 Galvanized Sheet Thickness Tolerances
46 Table B-2 Manufacturers Standard Gage-Thickness (Uncoated Steel)
47 Table B-3 Stainless Steel Sheet Thickness
48 Table B-4 Aluminum Sheet Thickness (Alloy 3003-H14))
51 APPENDIX C HVAC DUCT CONSTRUCTION STANDARDS
C.1 DUCT CONSTRUCTION AND INSTALLATION STANDARDS
52 C.2 DUCT SEALING COMMENTARY
Table C-1 Standard Duct Sealing Requirements
55 C.3 RECTANGULAR DUCT REINFORCEMENT
57 FIGURE C-1 DEPENDENT VARIABLES
58 C.4 INTRODUCTION TO THE RECTANGULAR DUCT CONSTRUCTION SCHEDULES
59 FIGURE C-2 READING GUIDE SUMMARY
64 Table C-2 Rectangular Duct Reinforcement
65 Table C-2M Rectangular Duct Reinforcement
66 FIGURE C-3 UNREINFORCED DUCT
68 Table C-3 Unreinforced Duct (Wall Thickness)
69 Table C-3M Unreinforced Duct (Wall Thickness)
70 FIGURE C-4 CROSSBROKEN AND BEADED DUCT
71 FIGURE C-5 FLEXIBLE DUCT LINER INSTALLATION
72 FIGURE C-6 LINER FASTENERS
73 FIGURE C-7 DUCT REINFORCED ON TWO SIDES
74 FIGURE C-8 REINFORCEMENT ATTACHMENT
75 C.5 TRANSVERSE JOINTS FOR RECTANGULAR DUCT
76 FIGURE C-9 RECTANGULAR DUCT/TRANSVERSE JOINTS
77 FIGURE C-9 RECTANGULAR DUCT/TRANSVERSE JOINTS (CONTINUED)
78 FIGURE C-9 RECTANGULAR DUCT/TRANSVERSE JOINTS (CONTINUED)
79 FIGURE C-9 RECTANGULAR DUCT/TRANSVERSE JOINTS (CONTINUED)
80 Table C-4 Intermediate Reinforcement
81 Table C-4M Intermediate Reinforcement
82 Table C-5 Transverse Joint Reinforcement
83 Table C-5M Transverse Joint Reinforcement
84 Table C-6 Transverse Joint Reinforcement
85 Table C-6M Transverse Joint Reinforcement
86 FIGURE C-10 RECTANGULAR DUCT/LONGITUDINAL SEAMS
87 FIGURE C-11 RECTANGULAR ELBOWS
88 FIGURE C-11 RECTANGULAR ELBOWS (CONTINUED)
89 FIGURE C-12 VANES AND VANE RUNNERS
90 FIGURE C-13 VANE SUPPORT IN ELBOWS
91 FIGURE C-14 BRANCH CONNECTION
92 C.6 VOLUME DAMPERS (NOTES FOR FIGURES C-15 AND C-16)
C.7 COMMENTARY
93 FIGURE C-15 VOLUME DAMPERS – SINGLE BLADE TYPE
94 FIGURE C-16 MULTIBLADE VOLUME DAMPERS
95 FIGURE C-17 OFFSETS AND TRANSITIONS
96 FIGURE C-18 REMOTE HEATING AND COOLING COIL INSTALLATIONS
97 FIGURE C-19 CEILING DIFFUSER BRANCH DUCTS
98 C.8 SPECIFICATION FOR SUPPORTING FLEXIBLE DUCT
99 FIGURE C-20 FLEXIBLE DUCT SUPPORTS
100 FIGURE C-21 FLEXIBLE DUCT SUPPORTS
101 C.9 ROUND DUCT CONSTRUCTION STANDARDS
C.10 COMMENTARY
102 Table C-7 Mitered Elbows
104 Table C-8 Round Duct Gage Unreinforced Positive Pressure
105 Table C-8M Round Duct Gage Unreinforced Positive Pressure
106 FIGURE C-22 ROUND DUCT TRANSVERSE JOINTS
107 FIGURE C-22 ROUND DUCT TRANSVERSE JOINTS (CONTINUED)
108 FIGURE C-23 ROUND DUCT LONGITUDINAL SEAMS
109 FIGURE C-24 HANGER ATTACHMENTS TO STRUCTURES
110 FIGURE C-25 UPPER ATTACHMENT DEVICES – TYPICAL
111 FIGURE C-26 LOWER HANGER ATTACHMENTS
112 Table C-9 Rectangular Duct Hangers Minimum Size
113 Table C-9M Rectangular Duct Hangers Minimum Size
114 Table C-10 Minimum Hanger Sizes for Round Duct
116 FIGURE C-27 RISER SUPPORTS – FROM FLOOR
117 FIGURE C-27M RISER SUPPORTS – FROM FLOOR
118 FIGURE C-28 ROOFTOP DUCT INSTALLATION
119 FIGURE C-29 EQUIPMENT AND DUCT SUPPORT FLASHING
120 FIGURE C-30 RECTANGULAR GOOSENECK
121 C.11 CASING AND PLENUM CONSTRUCTION STANDARDS
122 FIGURE C-31 BUILT-UP STANDING SEAM CASING
123 FIGURE C-32 DISHWASHER VAPOR EXHAUST
127 APPENDIX D FIRE, SMOKE, AND RADIATION DAMPER GUIDE
Table D-1 Recommended Fire Damper Installation Instructions
128 FIGURE D-1 BASIC FIRE DAMPER INSTALLATION DETAILS
129 Table D-2 Recommended Minimum Sleeve Thickness for Fire Dampers*
130 FIGURE D-2 UL DUCT-SLEEVE CONNECTIONS (BREAKAWAY CONNECTIONS)
131 FIGURE D-2 UL DUCT-SLEEVE CONNECTIONS (BREAKAWAY CONNECTIONS) (CONTINUED)
132 FIGURE D-3 FIRE DAMPER OPENING PROTECTION
133 FIGURE D-4 CURTAIN FIRE DAMPERS
134 FIGURE D-5 COMBINATION FIRE AND SMOKE DAMPERS
135 FIGURE D-6 DUCT LINER INTERRUPTION
136 FIGURE D-7 ACCESS DOORS AND PANELS
137 FIGURE D-8 LEAKAGE RATED (SMOKE) DAMPER
138 FIGURE D-9 FIRE RATED CEILING ASSEMBLIES
141 APPENDIX E FIBROUS GLASS DUCT CONSTRUCTION
E.1 FIBROUS GLASS DUCT CHARACTERISTICS AND LIMITATIONS
142 E.2 CLOSURES
143 FIGURE E-1 TAPE CLOSURE JOINT, WITH STAPLE FLAP
FIGURE E-2 TAPE CLOSURE JOINT, WITHOUT STAPLE FLAP
144 FIGURE E-3 CLOSURES (CONTINUED)
145 E.3 ADDITIONAL FIBROUS GLASS DUCT CONSTRUCTION DETAILS
FIGURE E-4 TIE ROD REINFORCEMENT AT JOINT
146 FIGURE E-5 SHEET METAL AND EQUIPMENT CONNECTION DETAILS
147 FIGURE E-6 SHEET METAL AND EQUIPMENT CONNECTION DETAILS (CONTINUED)
148 Table E-1 Tie Rod System Reinforcement Schedule
FIGURE E-7 TIE ROD REINFORCEMENT
149 Table E-1M Tie Rod System Reinforcement Schedule
FIGURE E-7M TIE ROD REINFORCEMENT
150 FIGURE E-8 TIE ROD TERMINATION METHODS
152 Table E-2 Channel System Reinforcement Schedule
153 Table E-2M Channel System Reinforcement Schedule
154 FIGURE E-9 CHANNEL REINFORCEMENT, POSITIVE PRESSURE SYSTEMS
155 FIGURE E-10 CHANNEL REINFORCEMENT, NEGATIVE PRESSURE SYSTEMS
156 Table E-3 Partial Wrap-around Reinforcement Schedule
FIGURE E-11 PARTIAL WRAP-AROUND REINFORCEMENT
157 Table E-3M Partial Wrap-around Reinforcement Schedule
FIGURE E-11M PARTIAL WRAP-AROUND REINFORCEMENT
158 FIGURE E-12 ALLOWABLE HANGER SPACING, STRAIGHT DUCT ” 3 INCH WIDE CHANNELS
159 Table E-4 Maximum Hanger Spacing by Duct Size, I.D.
Table E-5 Channel Selection
FIGURE E-13 HANGER SPACING AND EXTENSION ” 3 INCH WIDE CHANNELS
FIGURE E-14 USE OF 2 INCH WIDE HANGER CHANNELS
160 FIGURE E-15 ACCESS DOOR, FLANGE ON OPENING
SMACNA HVACDuctSystemsInspectionGuide 2006 03E
$87.21