WRC volume 54 No. 11-12:1999
$27.95
Progress Reports Volume 54 No. 11-12
Published By | Publication Date | Number of Pages |
WRC | 1999 | 138 |
CONTENTS
Minutes of PVRC Meetings
– PVRC Committee on Bolted Flanged Connections (BFC), October 19, 1999
– PVRC Subcommittee on Gasket Testing and Evaluated Temperature Joint Behavior (BFC-GT), October 18, 1999
– PVRC Subcommittee on Flange Parameter Studies (BFC-FPS), October 18, 1999
– PVRC Committee on Dynamic Analysis and Testing (DAT), October 19, 1999
– PVRC Committee on Elevated Temperature Design (ETD), June 15, 1999
– PVRC Committee on Elevated Temperature Design (ETD), October 19, 1999
– PVRC Committee on Piping, Nozzles and Vessels (PNV), October 18, 1999
– PVRC Subcommittee on Flexibility Models and Stress Intensification Factors (PNV-FMSIF), October 18, 1999
– PVRC Subcommittee on Vessels and Task Group on Plastic Analysis (PNV SCV), October 18, 1999
– PVRC Committee on Failure Modes of Components (FMC), October 19, 1999
– PVRC Committee on Welds (WMWP), October 19, 1999
– PVRC Committee on Thermal and Mechanical Effects (TME), October 19, 1999
– PVRC Committee on Cyclic Life & Environmental Effects (CLEE), October 19, 1999
– PVRC Working Group on S-N and DA/DN Data Analysis (CLEE SN DADN), October 19, 1999
– PVRC Joint Task Group on Increased Code Allowable Stresses (TG IAS) & Section VIII, Div. 2 Restructure, October 20, 1999
– PVRC Main & Executive Committee, October 20, 1999
Technical Reports
– Final Report on PVRC Project 96-17, October 10, 1999 ""The Vortex-Induced Fluid Forces on Oscillating Cylinders"" Robert D. Blevins
– Summary of ""JWES Standard for Flaw Assessment Procedure on Fitness-for-Purpose Basis"" Presented October 19, 1999, for the JPVRC/EPERC/PVRC Joint Workshop on Flaw Evaluation of Welded Structures, Takashi Miyata