{"id":111946,"date":"2024-10-18T16:18:54","date_gmt":"2024-10-18T16:18:54","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-1020-2012\/"},"modified":"2024-10-24T22:03:10","modified_gmt":"2024-10-24T22:03:10","slug":"ieee-1020-2012","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-1020-2012\/","title":{"rendered":"IEEE 1020 2012"},"content":{"rendered":"

Revision Standard – Active. Description of the electrical control and monitoring requirements for equipment and systems associated with small (100 kVA to 5 MVA) hydroelectric power plants.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\nIEEE Std 1020\u2122-2011, front cover <\/td>\n<\/tr>\n
3<\/td>\nTitle page <\/td>\n<\/tr>\n
6<\/td>\nNotice to users
Laws and regulations
Copyrights
Updating of IEEE documents
Errata
Patents <\/td>\n<\/tr>\n
8<\/td>\nParticipants <\/td>\n<\/tr>\n
10<\/td>\nIntroduction <\/td>\n<\/tr>\n
11<\/td>\nContents <\/td>\n<\/tr>\n
13<\/td>\nIMPORTANT NOTICE
1. Overview
1.1 Scope <\/td>\n<\/tr>\n
14<\/td>\n2. Normative references
3. Small hydroelectric plant overview
3.1 General <\/td>\n<\/tr>\n
15<\/td>\n3.2 Unit ratings
3.3 Application
3.4 Operation and control
3.5 Interconnection
3.5.1 Overview
3.5.2 Nature of interconnection <\/td>\n<\/tr>\n
16<\/td>\n3.5.3 Interconnection coordination issues
3.6 Unit arrangement <\/td>\n<\/tr>\n
17<\/td>\n3.7 Small hydro project evaluation <\/td>\n<\/tr>\n
18<\/td>\n3.8 Rehabilitation considerations
4. Equipment
4.1 General <\/td>\n<\/tr>\n
19<\/td>\n4.2 Major equipment
4.2.1 Turbines
4.2.2 Bearings <\/td>\n<\/tr>\n
20<\/td>\n4.2.3 Speed increaser
4.2.4 Turbine control system
4.2.5 Generators <\/td>\n<\/tr>\n
21<\/td>\n4.2.6 Excitation system <\/td>\n<\/tr>\n
22<\/td>\n4.2.7 Unit electrical connections <\/td>\n<\/tr>\n
23<\/td>\n4.3 Mechanical auxiliary systems
4.3.1 Lubrication
4.3.2 Sump pump
4.3.3 Air compressor
4.3.4 Air admission valve
4.3.5 Cooling water <\/td>\n<\/tr>\n
24<\/td>\n4.3.6 Fire detection and protection
5. Station service electrical system
5.1 General
5.2 Power plants with single auxiliary supply
5.2.1 AC supply <\/td>\n<\/tr>\n
26<\/td>\n5.2.2 DC supply <\/td>\n<\/tr>\n
27<\/td>\n5.3 Power plants using multiple auxiliary supplies
5.3.1 AC supply <\/td>\n<\/tr>\n
28<\/td>\n5.3.2 DC supply
6. Protection
6.1 General <\/td>\n<\/tr>\n
29<\/td>\n6.2 Malfunction considerations
6.2.1 Plant mechanical equipment troubles <\/td>\n<\/tr>\n
30<\/td>\n6.2.2 Plant electrical equipment troubles <\/td>\n<\/tr>\n
31<\/td>\n6.2.3 General plant troubles
6.2.4 Utility system troubles <\/td>\n<\/tr>\n
32<\/td>\n6.3 Application considerations
6.3.1 General
6.3.2 System studies
6.3.3 Generating plant (owner) requirements
6.3.4 Utility and regulatory requirements <\/td>\n<\/tr>\n
33<\/td>\n6.3.5 Protective relay packages
6.3.6 Protection redundancy
6.3.7 Protection unique to small hydro
6.3.8 Shutdown sequences <\/td>\n<\/tr>\n
34<\/td>\n7. Control and monitoring
7.1 General
7.2 Unit control
7.3 Connecting generator units to the system
7.3.1 Synchronous generator units <\/td>\n<\/tr>\n
35<\/td>\n7.3.2 Induction generator units <\/td>\n<\/tr>\n
38<\/td>\n7.4 Local and off-site control and monitoring <\/td>\n<\/tr>\n
39<\/td>\n7.4.1 Control requirements
7.4.2 Monitoring requirement
7.4.3 Metering <\/td>\n<\/tr>\n
40<\/td>\n7.4.4 Status and alarm requirements <\/td>\n<\/tr>\n
41<\/td>\n7.5 Communication requirements <\/td>\n<\/tr>\n
42<\/td>\n8. Modes of operation
8.1 General
8.2 Waterway operation
8.3 Project interface with the waterway system <\/td>\n<\/tr>\n
43<\/td>\n8.4 Electrical system operation <\/td>\n<\/tr>\n
44<\/td>\nAnnex A (informative) Project evaluation <\/td>\n<\/tr>\n
46<\/td>\nAnnex B (informative) Small hydraulic turbine characteristics
B.1 Reaction turbines
B.2 Impulse turbines <\/td>\n<\/tr>\n
47<\/td>\nAnnex C (informative) Protective relay considerations <\/td>\n<\/tr>\n
48<\/td>\nC.1 Non-electrical protective devices <\/td>\n<\/tr>\n
49<\/td>\nC.2 Electrical protection functions <\/td>\n<\/tr>\n
51<\/td>\nC.3 Utility Studies <\/td>\n<\/tr>\n
52<\/td>\nAnnex D (informative) Glossary <\/td>\n<\/tr>\n
55<\/td>\nAnnex E (informative) Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

IEEE Guide for Control of Small (100 kVA to 5 MVA) Hydroelectric Power Plants<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
IEEE<\/b><\/a><\/td>\n2012<\/td>\n56<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":111947,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2644],"product_tag":[],"class_list":{"0":"post-111946","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-ieee","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/111946","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/111947"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=111946"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=111946"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=111946"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}