{"id":137804,"date":"2024-10-19T07:57:58","date_gmt":"2024-10-19T07:57:58","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/fema-p-646-2012\/"},"modified":"2024-10-25T00:09:07","modified_gmt":"2024-10-25T00:09:07","slug":"fema-p-646-2012","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/fema\/fema-p-646-2012\/","title":{"rendered":"FEMA P 646 2012"},"content":{"rendered":"
None<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | FEMAP-646coverFinal2012 <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | Blank Page <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | 01a-Title Page_final <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | 01b-FEMA_Foreword_revision2 <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | 02-Preface_final <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 03-TableofContents <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | Blank Page <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 04-ListofFigures_final <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | Blank Page <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 05-ListofTables_final <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | Blank Page <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 07-2012-Ch01_Introduction_final 1.1 Objectives and Scope <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 1.2 Deciding to Construct a Vertical Evacuation Structure 1.2.1 Tsunami Hazard versus Risk 1.2.2 Decision-Making and Design Process <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 1.3 Limitations <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 1.4 Organization <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 08-2012-Ch02_Background_final_rev2 2.1 General 2.1.1 Historic Tsunami Activity <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 2.1.2 Behaviors and Characteristics of Tsunamis <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 2.2 Tsunami Effects on Buildings 2.2.1 Historic Data on Tsunami Effects <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 2.2.2 Observations from the Indian Ocean Tsunami <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | 2.2.3 Observations from the Tohoku Japan Tsunami <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | 2.2.4 Observations from Hurricane Katrina <\/td>\n<\/tr>\n | ||||||
54<\/td>\n | 2.2.5 Implications for Tsunami-Resistant Design <\/td>\n<\/tr>\n | ||||||
56<\/td>\n | Blank Page <\/td>\n<\/tr>\n | ||||||
57<\/td>\n | 09-Ch03 Tsunami Hazard Assessment_9-2012_final 3.1 Current Tsunami Modeling and Inundation Mapping <\/td>\n<\/tr>\n | ||||||
58<\/td>\n | 3.2 The NOAA Tsunami Program: Forecast Modeling and Mapping <\/td>\n<\/tr>\n | ||||||
61<\/td>\n | 3.3 The National Tsunami Hazard Mitigation Program: Credible Worst-Case Scenarios <\/td>\n<\/tr>\n | ||||||
64<\/td>\n | 3.4 The FEMA Map Modernization Program: Probabilistic Tsunami Hazard Assessments <\/td>\n<\/tr>\n | ||||||
66<\/td>\n | 3.5 Limitations in Available Modeling and Mapping Products <\/td>\n<\/tr>\n | ||||||
67<\/td>\n | 3.6 Hazard Quantification for Design of Tsunami Vertical Evacuation Structures <\/td>\n<\/tr>\n | ||||||
69<\/td>\n | 3.7 Recommendations to Improve Tsunami Hazard Assessment <\/td>\n<\/tr>\n | ||||||
70<\/td>\n | Blank Page <\/td>\n<\/tr>\n | ||||||
71<\/td>\n | 10-Ch04_Vertical_Evacuation_Options_final 4.1 Vertical Evacuation Considerations 4.1.1 Single-Purpose Facilities <\/td>\n<\/tr>\n | ||||||
72<\/td>\n | 4.1.2 Multi-Purpose Facilities <\/td>\n<\/tr>\n | ||||||
73<\/td>\n | 4.1.3 Multi-Hazard Considerations 4.2 Vertical Evacuation Concepts 4.2.1 Existing High Ground <\/td>\n<\/tr>\n | ||||||
74<\/td>\n | 4.2.2 Soil Berms <\/td>\n<\/tr>\n | ||||||
75<\/td>\n | 4.2.3 Multi-Story Parking Garages 4.2.4 Community Facilities <\/td>\n<\/tr>\n | ||||||
76<\/td>\n | 4.2.5 Commercial Facilities <\/td>\n<\/tr>\n | ||||||
78<\/td>\n | 4.2.6 School Facilities 4.2.7 Existing Buildings <\/td>\n<\/tr>\n | ||||||
79<\/td>\n | 11-Ch05_Siting_final 5.1 Siting Considerations 5.1.1 Warning, Travel Time, and Spacing <\/td>\n<\/tr>\n | ||||||
81<\/td>\n | 5.1.2 Ingress and Vertical Circulation <\/td>\n<\/tr>\n | ||||||
82<\/td>\n | 5.1.3 Consideration of Site Hazards <\/td>\n<\/tr>\n | ||||||
84<\/td>\n | 5.2 Sizing Considerations <\/td>\n<\/tr>\n | ||||||
85<\/td>\n | 5.2.1 Services and Occupancy Duration 5.2.2 Square Footage Recommendations from Available Sheltering Guidelines <\/td>\n<\/tr>\n | ||||||
87<\/td>\n | 5.2.3 Recommended Minimum Square Footage for Short-Term Refuge from Tsunamis 5.3 Elevation Considerations <\/td>\n<\/tr>\n | ||||||
88<\/td>\n | 5.4 Size of Vertical Evacuation Structures <\/td>\n<\/tr>\n | ||||||
89<\/td>\n | 12-Ch06 Load Determination_final_rev 6.1 Currently Available Structural Design Criteria 6.1.1 Current U.S. Codes, Standards, and Guidelines <\/td>\n<\/tr>\n | ||||||
92<\/td>\n | 6.1.2 Summary of Current Design Requirements <\/td>\n<\/tr>\n | ||||||
93<\/td>\n | 6.1.3 Limitations in Available Flood Design Criteria Relative to Tsunami Loading <\/td>\n<\/tr>\n | ||||||
94<\/td>\n | 6.2 Performance Objectives <\/td>\n<\/tr>\n | ||||||
95<\/td>\n | 6.2.1 Tsunami Performance Objective <\/td>\n<\/tr>\n | ||||||
96<\/td>\n | 6.2.2 Seismic Performance Objectives 6.3 Earthquake Loading <\/td>\n<\/tr>\n | ||||||
97<\/td>\n | 6.3.1 Near-Source-Generated Tsunamis 6.3.2 Far-Source-Generated Tsunamis <\/td>\n<\/tr>\n | ||||||
98<\/td>\n | 6.4 Wind Loading 6.5 Tsunami Loading <\/td>\n<\/tr>\n | ||||||
99<\/td>\n | 6.5.1 Key Assumptions for Estimating Tsunami Load Effects <\/td>\n<\/tr>\n | ||||||
100<\/td>\n | 6.5.2 Hydrostatic Forces <\/td>\n<\/tr>\n | ||||||
102<\/td>\n | 6.5.3 Buoyant Forces <\/td>\n<\/tr>\n | ||||||
103<\/td>\n | 6.5.4 Hydrodynamic Forces <\/td>\n<\/tr>\n | ||||||
105<\/td>\n | 6.5.5 Impulsive Forces <\/td>\n<\/tr>\n | ||||||
106<\/td>\n | 6.5.6 Floating Debris Impact Forces <\/td>\n<\/tr>\n | ||||||
110<\/td>\n | 6.5.7 Damming of Accumulated Waterborne Debris <\/td>\n<\/tr>\n | ||||||
111<\/td>\n | 6.5.8 Uplift Forces on Elevated Floors <\/td>\n<\/tr>\n | ||||||
113<\/td>\n | 6.5.9 Additional Retained Water Loading on Elevated Floors <\/td>\n<\/tr>\n | ||||||
114<\/td>\n | 6.6 Combination of Tsunami Forces 6.6.1 Tsunami Force Combinations on the Overall Structure <\/td>\n<\/tr>\n | ||||||
116<\/td>\n | 6.6.2 Tsunami Force Combinations on Individual Components <\/td>\n<\/tr>\n | ||||||
117<\/td>\n | 6.7 Load Combinations <\/td>\n<\/tr>\n | ||||||
118<\/td>\n | 6.8 Member Capacities and Strength Design Considerations <\/td>\n<\/tr>\n | ||||||
119<\/td>\n | 6.9 Progressive Collapse Considerations 6.9.1 Department of Defense Methodology <\/td>\n<\/tr>\n | ||||||
121<\/td>\n | 6.9.2 General Services Administration Methodology <\/td>\n<\/tr>\n | ||||||
123<\/td>\n | 13-Ch07_Structural_Design_Concepts_final 7.1 Attributes of Tsunami-Resistant Structures 7.2 Structural Considerations for Tsunami Load Effects <\/td>\n<\/tr>\n | ||||||
124<\/td>\n | 7.2.1 Foundation \/ Scour Design Concepts <\/td>\n<\/tr>\n | ||||||
125<\/td>\n | 7.2.2 Breakaway Wall Concepts <\/td>\n<\/tr>\n | ||||||
127<\/td>\n | 7.3 Concepts for Modifying and Retrofitting Existing Structures <\/td>\n<\/tr>\n | ||||||
128<\/td>\n | 7.4 Permitting and Quality Assurance for Vertical Evacuation Structures 7.4.1 Permitting and Code Compliance 7.4.2 Peer Review <\/td>\n<\/tr>\n | ||||||
129<\/td>\n | 7.4.3 Quality Assurance \/ Quality Control 7.5 Planning Considerations for Vertical Evacuation Structures <\/td>\n<\/tr>\n | ||||||
130<\/td>\n | 7.6 Cost Considerations for Vertical Evacuation Structures <\/td>\n<\/tr>\n | ||||||
132<\/td>\n | Blank Page <\/td>\n<\/tr>\n | ||||||
133<\/td>\n | 14-Appendix_A_3-26-2012_final <\/td>\n<\/tr>\n | ||||||
141<\/td>\n | 15-Appendix B_final B.1 Site 1 Example: Escape Berm <\/td>\n<\/tr>\n | ||||||
144<\/td>\n | B.2 Site 2 Example: Multi-Use Structure <\/td>\n<\/tr>\n | ||||||
148<\/td>\n | Blank Page <\/td>\n<\/tr>\n | ||||||
150<\/td>\n | 16-Appendix C_V 4-13-2012_final C.1 Inundation Depth C.2 Hydrostatic and Buoyant Forces <\/td>\n<\/tr>\n | ||||||
152<\/td>\n | C.3 Hydrodynamic and Impulsive Forces C.4 Impact Force <\/td>\n<\/tr>\n | ||||||
154<\/td>\n | C.5 Damming Effect of Waterborne Debris <\/td>\n<\/tr>\n | ||||||
155<\/td>\n | C.6 Hydrodynamic Uplift Forces <\/td>\n<\/tr>\n | ||||||
156<\/td>\n | Blank Page <\/td>\n<\/tr>\n | ||||||
157<\/td>\n | 17-Appendix D_V 4-13-2012_final D.1 Available Models for Impact Loads <\/td>\n<\/tr>\n | ||||||
162<\/td>\n | D.2 Summary and Discussion <\/td>\n<\/tr>\n | ||||||
165<\/td>\n | 18-Appendix E_final_508 E.1 Flow Velocity <\/td>\n<\/tr>\n | ||||||
168<\/td>\n | E.2 Momentum Flux <\/td>\n<\/tr>\n | ||||||
170<\/td>\n | Blank Page <\/td>\n<\/tr>\n | ||||||
171<\/td>\n | 19-Glossary_final A B <\/td>\n<\/tr>\n | ||||||
172<\/td>\n | C <\/td>\n<\/tr>\n | ||||||
173<\/td>\n | D F <\/td>\n<\/tr>\n | ||||||
174<\/td>\n | G H <\/td>\n<\/tr>\n | ||||||
175<\/td>\n | I L M <\/td>\n<\/tr>\n | ||||||
176<\/td>\n | N P <\/td>\n<\/tr>\n | ||||||
177<\/td>\n | R S <\/td>\n<\/tr>\n | ||||||
178<\/td>\n | T <\/td>\n<\/tr>\n | ||||||
179<\/td>\n | U V W <\/td>\n<\/tr>\n | ||||||
180<\/td>\n | Blank Page <\/td>\n<\/tr>\n | ||||||
181<\/td>\n | 20-References_4-13-2012_final <\/td>\n<\/tr>\n | ||||||
192<\/td>\n | Blank Page <\/td>\n<\/tr>\n | ||||||
193<\/td>\n | 21-Project_Participants_final ATC Management and Oversight FEMA Project Officer FEMA Technical Monitor Project Management Committee (Second Edition) <\/td>\n<\/tr>\n | ||||||
194<\/td>\n | Project Management Committee Project Review Panel <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" FEMA P-646 – Guidelines for Design of Structures for Vertical Evacuation from Tsunamis, Second Edition<\/b><\/p>\n |