{"id":146955,"date":"2024-10-19T08:37:25","date_gmt":"2024-10-19T08:37:25","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-c37-74-2003\/"},"modified":"2024-10-25T00:53:41","modified_gmt":"2024-10-25T00:53:41","slug":"ieee-c37-74-2003","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-c37-74-2003\/","title":{"rendered":"IEEE C37.74 2003"},"content":{"rendered":"
Revision Standard – Inactive – Superseded. Required definitions, ratings, procedures for performing design tests and production tests, and construction requirements for subsurface, vault, and pad-mounted load-interrupter switchgear and fused load-interrupter switchgear for ac systems up to 38 kV are specified<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | Cover <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | IEEE Standard Requirements for Subsurface, Vault, and Pad-Mounted Load-Interrupter Switchgear and Fused Load-Interrupter Swit <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | Participants <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 1. Scope 2. References <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 3. Definitions <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 4. Service conditions 4.1 Usual service conditions 4.2 Unusual service conditions <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 4.2.1 Abnormal ambient temperatures 4.2.2 Altitudes above 1000 m 5. Ratings, required related capabilities, and test requirements 5.1 General 5.2 Rating information 5.2.1 Overall ratings <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 5.2.2 Individual way ratings <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 5.3 Continuous current ratings and related test requirements 5.3.1 Conditions of continuous current rating <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 5.3.2 Limits of observable temperature rise 5.3.3 Application of fuses <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 6. Design tests (type tests) 6.1 General <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 6.1.1 Condition of DSG to be tested 6.1.2 Mounting of the DSG 6.1.3 Maintenance 6.1.4 Power-frequency 6.2 Tests on connectors and bushings used on DSG <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 6.3 Testing of DSG as an entity 6.3.1 General 6.3.2 Test requirements 6.3.3 Condition of DSG following short-circuit tests <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 6.4 Testing of switches installed in switched ways and fused-switch ways 6.4.1 General 6.4.2 Test sequence 6.4.3 Condition of switching device in switched and fused-switch ways after test sequence <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 6.5 Testing of switching devices in fused-loadbreak ways 6.5.1 General <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 6.5.2 Test sequence 6.5.3 Condition of switching device in fused-loadbreak ways after test sequence 6.6 Testing of fusing devices used in fused ways, fused-switch ways, or fused- loadbreak ways 6.6.1 General 6.6.2 Test sequence <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 6.6.3 Interrupting performance of fusing devices in the DSG 6.7 Test methods 6.7.1 General 6.7.2 Dielectric tests <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 6.7.3 Continuous current test <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 6.7.4 Short-circuit withstand current tests <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 6.7.5 Switching tests <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 6.7.6 Thermal runaway test 6.7.7 Partial discharge (corona) tests <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 6.7.8 DC withstand voltage test <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 6.7.9 Sealed test pressure tests 6.7.10 Mechanical operations tests <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | 7. Production tests (routine tests) 7.1 Circuit resistance test 7.2 Power-frequency withstand voltage test 7.3 Partial discharge test 7.4 Leak test 7.5 Operating tests <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | 8. Field tests on units in service, including dc withstand tests on cables <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | 9. Construction requirements 9.1 Grounding provision 9.2 Manual operating provisions 9.3 Position indicators 9.4 Insulating medium quantity indicators 9.5 Drain and replacement provision <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | 9.6 Sampling and adding provisions 9.7 Parking stands 9.8 Bushings 9.9 Enclosure construction\u2014submersible and pad-mounted equipment 9.10 Enclosure construction\u2014pad-mounted equipment 9.11 Nameplate <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | 9.12 User identification plate <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | 10. Shipping requirements <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | Annex A\u2014(informative) X\/R ratios A.1 Time constant (tcc) and X\/R ratio A.2 Asymmetrical fault current <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | Annex B\u2014(informative) Altitude correction factors B.1 Introduction B.2 Altitude correction factors <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | B.3 Examples for switchgear with 110 kV\/BIL already rated for 1000 m <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | B.4 Examples for switchgear ratings based on 110 kV BIL withstand tests referred to sea level NTP… <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | Annex C\u2014(informative) Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Standard Requirements for Subsurface, Vault, and Padmounted Load-Interrupter Switchgear and Fused Load-Interrupter Switchgear for Alternating Current Systems up to 38 kV<\/b><\/p>\n |