{"id":189170,"date":"2024-10-19T11:55:01","date_gmt":"2024-10-19T11:55:01","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ashrae-commissioningstakeholdersguide-2018\/"},"modified":"2024-10-25T04:22:11","modified_gmt":"2024-10-25T04:22:11","slug":"ashrae-commissioningstakeholdersguide-2018","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ashrae\/ashrae-commissioningstakeholdersguide-2018\/","title":{"rendered":"ASHRAE CommissioningStakeholdersGuide 2018"},"content":{"rendered":"

The Commissioning Stakeholders’ Guide consolidates best practices, sample documentation, and more than 50 project checklists in a practical and applicable resource for this critical aspect of a new construction project.Using ASHRAE Guideline 0 and ASHRAE\/IES Standard 202, this guide provides concise guidance and step-by-step requirements for new construction commissioning for owners, designers, and project managers. Systems, including those found in commercial, medical, industrial, and education facilities, are described in detail. Every facet of the commissioning process is outlined, from project initiation to the final commissioning report.Commissioning Stakeholders\u2019 Guide was co-published by ASHRAE, the leading organization in the sustainable built environment, and BCxA, the authority on building commissioning.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
2<\/td>\nCommissioningStakeholders\u2019Guide <\/td>\n<\/tr>\n
6<\/td>\nContents <\/td>\n<\/tr>\n
10<\/td>\nChecklists <\/td>\n<\/tr>\n
12<\/td>\nAcknowledgments <\/td>\n<\/tr>\n
14<\/td>\nPreface <\/td>\n<\/tr>\n
16<\/td>\nChapter 1\u2014Strategic Guide to theCommissioning Process
Introduction to the Commissioning Process
Strategic Overview <\/td>\n<\/tr>\n
17<\/td>\nUse of the Commissioning Process
Value and Benefits of Commissioning <\/td>\n<\/tr>\n
19<\/td>\nPerformance Requirements <\/td>\n<\/tr>\n
20<\/td>\nCommissioning Provider Characteristics <\/td>\n<\/tr>\n
21<\/td>\nCommissioning Expectations
References <\/td>\n<\/tr>\n
22<\/td>\nChapter 2\u2014New ConstructionCommissioning ProcessActivities andDocumentation
The Commissioning Process for New Construction <\/td>\n<\/tr>\n
24<\/td>\nNew Construction Commissioning Process Activities and Deliverables
Commissioning Process Documentation Overview
Owner’s Project Requirements <\/td>\n<\/tr>\n
25<\/td>\nTable 2.1 New Construction Commissioning Process Activities, Deliverables, andResponsibilities <\/td>\n<\/tr>\n
26<\/td>\nThe Basis of Design
Commissioning Plan
Commissioning Specifications
Design Review Report
Record Documents <\/td>\n<\/tr>\n
27<\/td>\nSystems Manual
Preliminary Commissioning Report
Final Commissioning Report <\/td>\n<\/tr>\n
28<\/td>\nRoster of Participants and Stakeholders
References <\/td>\n<\/tr>\n
29<\/td>\nTable 2.2 Commissioning Process Responsibilities by Activity <\/td>\n<\/tr>\n
30<\/td>\nTable 2.3 Commissioning Team Contact List <\/td>\n<\/tr>\n
32<\/td>\nChapter 3\u2014Stakeholder\/Participant Roles and Responsibilities
New Construction Commissioning Process Responsibility by Document
Stakeholder Project Phase Involvement
Stakeholder Roles and Responsibilities Summary
Owner\/Owner’s Representative <\/td>\n<\/tr>\n
33<\/td>\nTable 3.1 Commissioning Documents <\/td>\n<\/tr>\n
35<\/td>\nArchitect
Engineer
Contractor\/Construction Manager
Table 3.2 Commissioning Team Members by Phase (Stum and Bjornskov 2017) <\/td>\n<\/tr>\n
36<\/td>\nSubcontractors and Installers
Manufacturer and Supplier
Commissioning Provider
LEED\u00ae or Program Administrator
Stakeholder Duties and Functions <\/td>\n<\/tr>\n
37<\/td>\nOwner\/Owner’s Representative <\/td>\n<\/tr>\n
38<\/td>\nArchitect <\/td>\n<\/tr>\n
39<\/td>\nDesign Engineers (Mechanical, Elecctrical, Plumbing, Enclosure, and Others Included in the Design Process)
Contractor\/Construction Manager <\/td>\n<\/tr>\n
41<\/td>\nSubcontractor and Installer
Manufacturer and Supplier <\/td>\n<\/tr>\n
42<\/td>\nCommissioning Provider <\/td>\n<\/tr>\n
43<\/td>\nLEED or Program Administrator
References <\/td>\n<\/tr>\n
44<\/td>\nTable 3.3 Owner\u2019s Roles and Responsibilities Checklist <\/td>\n<\/tr>\n
45<\/td>\nTable 3.4 Architect\u2019s Roles and Responsibilities Checklist <\/td>\n<\/tr>\n
46<\/td>\nTable 3.5 Design Engineer Roles and Responsibilities Checklist <\/td>\n<\/tr>\n
47<\/td>\nTable 3.6 Contractor\/Construction Manager Roles and Responsibilities Checklist <\/td>\n<\/tr>\n
48<\/td>\nTable 3.7 Subcontractor and Installer Roles and Responsibilities Checklist <\/td>\n<\/tr>\n
49<\/td>\nTable 3.8 Manufacturer and Supplier Roles and Responsibilities Checklist <\/td>\n<\/tr>\n
50<\/td>\nTable 3.9 Commissioning Provider Roles and Responsibilities Checklist <\/td>\n<\/tr>\n
51<\/td>\nTable 3.10 LEED\u00ae or Program Administrator Roles and Responsibilities Checklist <\/td>\n<\/tr>\n
52<\/td>\nChapter 4\u2014Commissioning for Codes and Standards Requirements
Basic Commissioning Process to Code Requirements
Commissioning Application for Construction Projects Using IECC <\/td>\n<\/tr>\n
53<\/td>\nBuilding Official and AHJ Role in Commissioning
Commissioning Process for Building Permit <\/td>\n<\/tr>\n
54<\/td>\nCommissioning Checklist for Permit
IECC Commissioning Documentation for Final Inspection and Certificate of Occupancy <\/td>\n<\/tr>\n
55<\/td>\nTable 4.1 Commissioning Documentation for Permit <\/td>\n<\/tr>\n
56<\/td>\nCommissioning Report Outlines
References <\/td>\n<\/tr>\n
57<\/td>\nTable 4.2 Commissioning Documentation for Final Inspection and Certificate of Occupancy <\/td>\n<\/tr>\n
58<\/td>\nChapter 5\u2014Building System Selectionfor Commissioning
Basic Commissioning Activities
Building System Commissioning Checklists <\/td>\n<\/tr>\n
59<\/td>\nTable 5.1 Commercial and Office Buildings\u2014Systems to Commission <\/td>\n<\/tr>\n
60<\/td>\nTable 5.2 Medical Buildings and Hospitals\u2014Systems to Commission <\/td>\n<\/tr>\n
61<\/td>\nTable 5.3 Educational Facilities\u2014Pre-K\u201312 Schools\u2014Systems to Commission <\/td>\n<\/tr>\n
62<\/td>\nTable 5.4 College and University Facilities\u2014Systems to Commission <\/td>\n<\/tr>\n
63<\/td>\nTable 5.5 Municipal and State Buildings\u2014Systems to Commission <\/td>\n<\/tr>\n
64<\/td>\nTable 5.6 Federal Buildings\u2014Systems to Commission <\/td>\n<\/tr>\n
65<\/td>\nTable 5.7 Industrial Facilities\u2014Systems to Commission <\/td>\n<\/tr>\n
66<\/td>\nTable 5.8 High-Rise Residential Buildings\u2014Systems to Commission <\/td>\n<\/tr>\n
67<\/td>\nTable 5.9 Retail Buildings and Areas\u2014Systems to Commission <\/td>\n<\/tr>\n
68<\/td>\nTable 5.10 Justice Buildings\u2014Systems to Commission <\/td>\n<\/tr>\n
70<\/td>\nChapter 6\u2014Building System Commissioning Requirements
Commissioning Major Specialty Task Selection
Building Enclosures
Air-Conditioning and Ventilation Systems <\/td>\n<\/tr>\n
71<\/td>\nPlumbing Systems
Electric Power Systems
Lighting and Control Systems
Energy Monitoring and Management Systems
Indoor Environmental Quality
Landscape Irrigation Systems <\/td>\n<\/tr>\n
72<\/td>\nFire Protection Systems
Fire Alarm Systems
Vertical Transportation Systems
On-Site Energy Generation Systems
Telephone and Communication Systems
References <\/td>\n<\/tr>\n
73<\/td>\nTable 6.1 Building Enclosure Commissioning <\/td>\n<\/tr>\n
74<\/td>\nTable 6.2 Air-Conditioning and Ventilation Systems Commissioning <\/td>\n<\/tr>\n
76<\/td>\nTable 6.3 Plumbing Commissioning <\/td>\n<\/tr>\n
77<\/td>\nTable 6.4 Electrical Power Systems Commissioning <\/td>\n<\/tr>\n
78<\/td>\nTable 6.5 Lighting and Control Systems Commissioning <\/td>\n<\/tr>\n
79<\/td>\nTable 6.6 Energy Monitoring and Management Commissioning <\/td>\n<\/tr>\n
80<\/td>\nTable 6.7 Indoor Environmental Quality Commissioning <\/td>\n<\/tr>\n
81<\/td>\nTable 6.8 Landscape Irrigation Systems Commissioning <\/td>\n<\/tr>\n
82<\/td>\nTable 6.9 Fire Protection Systems Commissioning <\/td>\n<\/tr>\n
83<\/td>\nTable 6.10 Fire Alarm Systems Commissioning <\/td>\n<\/tr>\n
85<\/td>\nTable 6.11 Vertical Transportation Systems Commissioning <\/td>\n<\/tr>\n
86<\/td>\nTable 6.12 On-Site Energy Generation System Commissioning <\/td>\n<\/tr>\n
87<\/td>\nTable 6.13 Telephone and Communication Systems Commissioning <\/td>\n<\/tr>\n
88<\/td>\nChapter 7\u2014Selecting and Hiring a Commissioning Provider
Guidelines for Qualifications and Independence of Approved Commissioning Providers <\/td>\n<\/tr>\n
89<\/td>\nQualifications-Based Selection
Owners and Commissioning Providers: You Need QBS <\/td>\n<\/tr>\n
92<\/td>\nReferences <\/td>\n<\/tr>\n
94<\/td>\nAppendix A\u2014Commissioning Process Definitions and Resources
Commissioning Definitions (ASHRAE\/IES Standard 202) <\/td>\n<\/tr>\n
96<\/td>\nCommissioning Organizations and Resources
REFERENCE <\/td>\n<\/tr>\n
98<\/td>\nAppendix B\u2014Commissioning Process Documentation: New Construction Checklists
New Construction Commissioning Documentation Checklists
Owner’s Project Requirements (OPR) Document
OPR Documentation Development <\/td>\n<\/tr>\n
99<\/td>\nCommissioning Plan
Commissioning Plan Contents <\/td>\n<\/tr>\n
100<\/td>\nBasis of Design (BoD) <\/td>\n<\/tr>\n
101<\/td>\nCommissioning Specifications
Specifications for the Commissioning Process
Project Documents, Submittal Review, and Reports <\/td>\n<\/tr>\n
102<\/td>\nDesign Submissions <\/td>\n<\/tr>\n
104<\/td>\nConstruction Observation, Testing, Checklists, and Reports <\/td>\n<\/tr>\n
105<\/td>\nIssues and Resolution Log
Contents
Systems Manual <\/td>\n<\/tr>\n
106<\/td>\nTraining Plan and Records
Commissioning Process Reports and Testing Records
References <\/td>\n<\/tr>\n
108<\/td>\nTable B.1 Commissioning Documentation <\/td>\n<\/tr>\n
109<\/td>\nTable B.2 Owner\u2019s Project Requirements <\/td>\n<\/tr>\n
110<\/td>\nTable B.3 Preliminary Commissioning Plan <\/td>\n<\/tr>\n
111<\/td>\nTable B.4 Final Commissioning Plan <\/td>\n<\/tr>\n
112<\/td>\nTable B.5 Basis of Design <\/td>\n<\/tr>\n
113<\/td>\nTable B.6 Commissioning Specifications in Construction Documents <\/td>\n<\/tr>\n
114<\/td>\nTable B.7 Design Review Commissioning <\/td>\n<\/tr>\n
115<\/td>\nTable B.8 Commissioning Submittal Review <\/td>\n<\/tr>\n
116<\/td>\nTable B.9 Commissioning Observation and Testing Report <\/td>\n<\/tr>\n
117<\/td>\nTable B.10 Equipment and Assemblies Tested <\/td>\n<\/tr>\n
118<\/td>\nTable B.11 Sample Commissioning Issues and Resolution Log <\/td>\n<\/tr>\n
119<\/td>\nTable B.12 Commissioning Issues and Resolution Log <\/td>\n<\/tr>\n
120<\/td>\nTable B.13 Systems Manual <\/td>\n<\/tr>\n
121<\/td>\nTable B.14 Training Plan <\/td>\n<\/tr>\n
122<\/td>\nTable B.15 Commissioning Documentation for Final Inspection and Certificate of Occupancy <\/td>\n<\/tr>\n
123<\/td>\nTable B.16 Final Commissioning Report <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Commissioning Stakeholders\u2019 Guide<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
ASHRAE<\/b><\/a><\/td>\n2018<\/td>\n124<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":189175,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2719],"product_tag":[],"class_list":{"0":"post-189170","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-ashrae","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/189170","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/189175"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=189170"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=189170"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=189170"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}