{"id":194462,"date":"2024-10-19T12:20:23","date_gmt":"2024-10-19T12:20:23","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-c37-122-4-2016\/"},"modified":"2024-10-25T04:51:24","modified_gmt":"2024-10-25T04:51:24","slug":"ieee-c37-122-4-2016","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-c37-122-4-2016\/","title":{"rendered":"IEEE C37.122.4 2016"},"content":{"rendered":"

New IEEE Standard – Active. Guidance for the planning, permitting, design, equipment specification, installation, commissioning, operation, and maintenance of gas-insulated transmission lines is provided in this project. Only technical aspects are addressed in this guide. Commercial and legal issues associated with gas-insulated transmission lines are not considered. This guide applies to ac transmission lines rated for maximum operating voltage of 72.5 kV and higher.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\nIEEE Std C37.122.4\u2122-2016 Front cover <\/td>\n<\/tr>\n
2<\/td>\nTitle page <\/td>\n<\/tr>\n
4<\/td>\nImportant Notices and Disclaimers Concerning IEEE Standards Documents <\/td>\n<\/tr>\n
7<\/td>\nParticipants <\/td>\n<\/tr>\n
8<\/td>\nIntroduction <\/td>\n<\/tr>\n
9<\/td>\nContents <\/td>\n<\/tr>\n
11<\/td>\n1.\u2002Overview
1.1\u2002Scope
1.2\u2002Purpose
2.\u2002Normative references <\/td>\n<\/tr>\n
12<\/td>\n3.\u2002Definitions <\/td>\n<\/tr>\n
13<\/td>\n4.\u2002Technical details of GIL
4.1\u2002General information
4.2\u2002Description
4.3\u2002Typical installations <\/td>\n<\/tr>\n
14<\/td>\n4.4\u2002GIL application information <\/td>\n<\/tr>\n
15<\/td>\n4.5\u2002Influence of GIL on the transmission network
4.6\u2002Temperature design criteria
4.7\u2002Seismic aspects <\/td>\n<\/tr>\n
16<\/td>\n4.8\u2002Terminations
4.9\u2002Installation criteria <\/td>\n<\/tr>\n
17<\/td>\n4.10\u2002Testing criteria
4.11\u2002Environmental aspects <\/td>\n<\/tr>\n
18<\/td>\n4.12\u2002Technical data to be given in the request for proposal <\/td>\n<\/tr>\n
19<\/td>\n5.\u2002Detailed project implementation and service
5.1\u2002Construction aspects
5.2\u2002Transportation and storage <\/td>\n<\/tr>\n
20<\/td>\n5.3\u2002GIL installation (on-site welded assembly) <\/td>\n<\/tr>\n
21<\/td>\n5.4\u2002Testing and commissioning <\/td>\n<\/tr>\n
23<\/td>\n5.5\u2002Secondary equipment <\/td>\n<\/tr>\n
24<\/td>\n5.6\u2002GIL grounding <\/td>\n<\/tr>\n
25<\/td>\n5.7\u2002Seismic requirements
5.8\u2002Repair techniques
6.\u2002Gas handling of gas mixtures
6.1\u2002General <\/td>\n<\/tr>\n
26<\/td>\n6.2\u2002Pure SF6 and N2\/SF6 gas mixture
6.3\u2002Gas handling equipment
6.4\u2002Filling with SF6 or SF6\/N2 gas mixture
6.5\u2002Removal of SF6 or SF6\/N2 gas mixture <\/td>\n<\/tr>\n
27<\/td>\n7.\u2002Maintenance and inspections
8.\u2002Training
9.\u2002Decommissioning
9.1\u2002General
9.2\u2002Removal of SF6 or SF6\/N2 gas mixture
9.3\u2002Dismantling of the GIL <\/td>\n<\/tr>\n
28<\/td>\nAnnex A (informative) Typical installations
A.1\u2002Installations in a tunnel <\/td>\n<\/tr>\n
32<\/td>\nA.2\u2002Above ground <\/td>\n<\/tr>\n
35<\/td>\nA.3\u2002Direct buried <\/td>\n<\/tr>\n
37<\/td>\nAnnex B (informative) Comparison of GIL, OHL, and XLPE cable
B.1\u2002General information <\/td>\n<\/tr>\n
38<\/td>\nB.2\u2002OHL, cable, and GIL technical points <\/td>\n<\/tr>\n
39<\/td>\nAnnex C (informative) Proposal fill-in data table <\/td>\n<\/tr>\n
41<\/td>\nAnnex D (informative) Execution of GIL project planning and engineering process
D.1\u2002Flowchart <\/td>\n<\/tr>\n
42<\/td>\nD.2\u2002Initiation of a project
D.3\u2002Preliminary system studies\/needs assessment
D.4\u2002Routing
D.5\u2002Pre-proposal stage
D.6\u2002Further studies <\/td>\n<\/tr>\n
43<\/td>\nD.7\u2002Approval of the right-of-way
D.8\u2002Preparation of a request for quotation <\/td>\n<\/tr>\n
44<\/td>\nD.9\u2002Evaluation of quotation
D.10\u2002Project implementation <\/td>\n<\/tr>\n
46<\/td>\nAnnex E (informative) Bibliography <\/td>\n<\/tr>\n
49<\/td>\nBack cover <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

IEEE Guide for Application and User Guide for Gas-Insulated Transmission Lines, Rated 72.5 kV and Above<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
IEEE<\/b><\/a><\/td>\n2017<\/td>\n49<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":194464,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2644],"product_tag":[],"class_list":{"0":"post-194462","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-ieee","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/194462","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/194464"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=194462"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=194462"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=194462"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}