{"id":194462,"date":"2024-10-19T12:20:23","date_gmt":"2024-10-19T12:20:23","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-c37-122-4-2016\/"},"modified":"2024-10-25T04:51:24","modified_gmt":"2024-10-25T04:51:24","slug":"ieee-c37-122-4-2016","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-c37-122-4-2016\/","title":{"rendered":"IEEE C37.122.4 2016"},"content":{"rendered":"
New IEEE Standard – Active. Guidance for the planning, permitting, design, equipment specification, installation, commissioning, operation, and maintenance of gas-insulated transmission lines is provided in this project. Only technical aspects are addressed in this guide. Commercial and legal issues associated with gas-insulated transmission lines are not considered. This guide applies to ac transmission lines rated for maximum operating voltage of 72.5 kV and higher.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | IEEE Std C37.122.4\u2122-2016 Front cover <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | Title page <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | Important Notices and Disclaimers Concerning IEEE Standards Documents <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Participants <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 1.\u2002Overview 1.1\u2002Scope 1.2\u2002Purpose 2.\u2002Normative references <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 3.\u2002Definitions <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 4.\u2002Technical details of GIL 4.1\u2002General information 4.2\u2002Description 4.3\u2002Typical installations <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 4.4\u2002GIL application information <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 4.5\u2002Influence of GIL on the transmission network 4.6\u2002Temperature design criteria 4.7\u2002Seismic aspects <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 4.8\u2002Terminations 4.9\u2002Installation criteria <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 4.10\u2002Testing criteria 4.11\u2002Environmental aspects <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 4.12\u2002Technical data to be given in the request for proposal <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 5.\u2002Detailed project implementation and service 5.1\u2002Construction aspects 5.2\u2002Transportation and storage <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 5.3\u2002GIL installation (on-site welded assembly) <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 5.4\u2002Testing and commissioning <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 5.5\u2002Secondary equipment <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 5.6\u2002GIL grounding <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 5.7\u2002Seismic requirements 5.8\u2002Repair techniques 6.\u2002Gas handling of gas mixtures 6.1\u2002General <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 6.2\u2002Pure SF6 and N2\/SF6 gas mixture 6.3\u2002Gas handling equipment 6.4\u2002Filling with SF6 or SF6\/N2 gas mixture 6.5\u2002Removal of SF6 or SF6\/N2 gas mixture <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 7.\u2002Maintenance and inspections 8.\u2002Training 9.\u2002Decommissioning 9.1\u2002General 9.2\u2002Removal of SF6 or SF6\/N2 gas mixture 9.3\u2002Dismantling of the GIL <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | Annex A (informative) Typical installations A.1\u2002Installations in a tunnel <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | A.2\u2002Above ground <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | A.3\u2002Direct buried <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | Annex B (informative) Comparison of GIL, OHL, and XLPE cable B.1\u2002General information <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | B.2\u2002OHL, cable, and GIL technical points <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | Annex C (informative) Proposal fill-in data table <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | Annex D (informative) Execution of GIL project planning and engineering process D.1\u2002Flowchart <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | D.2\u2002Initiation of a project D.3\u2002Preliminary system studies\/needs assessment D.4\u2002Routing D.5\u2002Pre-proposal stage D.6\u2002Further studies <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | D.7\u2002Approval of the right-of-way D.8\u2002Preparation of a request for quotation <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | D.9\u2002Evaluation of quotation D.10\u2002Project implementation <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | Annex E (informative) Bibliography <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | Back cover <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Guide for Application and User Guide for Gas-Insulated Transmission Lines, Rated 72.5 kV and Above<\/b><\/p>\n |