{"id":214398,"date":"2024-10-19T13:53:41","date_gmt":"2024-10-19T13:53:41","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-13-30288537-dc\/"},"modified":"2024-10-25T06:52:07","modified_gmt":"2024-10-25T06:52:07","slug":"bsi-13-30288537-dc","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-13-30288537-dc\/","title":{"rendered":"BSI 13\/30288537 DC"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
8<\/td>\n | 1 Scope 2 Normative references 3 Terms, definitions, symbols and abbreviations 3.1 Terms and definitions <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 3.2 Symbols and abbreviations <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 4 Principle 5 Apparatus 5.1 Method using a wheel or two wheels fitted with pneumatic tyres <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 5.2 Methods using a smooth steel roller 5.2.1 Smooth steel roller <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 5.2.2 Steel roller used on wheel fitted with pneumatic tyres 5.3 Method using a roller running on vertical sliding steel plates 5.3.2 A device to compact the bituminous mixture in the moulds (see Figure 2) and which shall comprise: <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 6 Preparation 6.1 Mass of bituminous mixture <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 6.2 Filling the mould 7 Compaction procedure 7.1 Method using wheels fitted with pneumatic tyres 7.1.1 Test conditions 7.1.2 Compaction 7.1.2.1 General 7.1.2.2 Compaction by a specified energy <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 7.1.2.3 Compaction to obtain a specified air voids content or compaction degree 7.1.2.4 Smooth cylinder for final compaction 7.1.3 Timing 7.2 Methods using a smooth steel roller 7.2.1 General 7.2.2 Compaction by a specified energy 7.2.3 Compaction with controlled compaction energy <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 7.2.4 Compaction to obtain a specified air voids content or compaction degree 7.2.4.1 Compaction by a constant energy 7.2.4.2 Compaction with controlled compaction energy 7.3 Method using a roller running on vertical sliding steel plates 7.4 Removing the mould 8 Test report <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | Table 1 \u2014 Sweep plan, specimens 500 mm ( 180 mm ( e, light compaction, 1 tyre <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | Table 2 \u2014 Sweep plan, specimens 600 mm ( 400 mm ( e, light compaction, 2 tyres <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | Table 3 \u2014 Sweep plan, specimens 500 mm ( 180 mm ( e, heavy compaction, 1 tyre <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | Table 4 \u2014 Sweep plan, specimens 600 mm ( 400 mm ( e, heavy compaction, 2 tyres <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | Annex A (informative) Example of energy-controlled smooth roller compaction procedure <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" BS EN 12697-33. Bituminous mixtures. Test methods for hot mix asphalt. Part 33. Specimen prepared by roller compactor<\/b><\/p>\n |