{"id":218398,"date":"2024-10-19T14:10:05","date_gmt":"2024-10-19T14:10:05","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-60312009\/"},"modified":"2024-10-25T07:24:10","modified_gmt":"2024-10-25T07:24:10","slug":"bs-60312009","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-60312009\/","title":{"rendered":"BS 6031:2009"},"content":{"rendered":"
This standard gives recommendations and guidance for unreinforced earthworks forming part of general civil engineering construction, with the exception of dams. This standard also gives recommendations and guidance for temporary excavations such as trenches and pits.<\/p>\n
\nNOTE Reinforced earthworks are covered in BS 8006\u20111 and BS 8006\u20112.<\/p>\n<\/blockquote>\n
This document applies to earthworks classified as Geotechnical Category 1, 2 and 3 structures as defined in BS EN 1997\u20111:2004.<\/p>\n
PDF Catalog<\/h4>\n
\n
\n PDF Pages<\/th>\n PDF Title<\/th>\n<\/tr>\n \n 5<\/td>\n \t\tForeword <\/td>\n<\/tr>\n \n 7<\/td>\n Section 1: General
\t\tIntroduction <\/td>\n<\/tr>\n\n 9<\/td>\n \t1\tScope
\t2\tNormative references
Figure 1\u2003Flow diagram of lifecycle of an earthworks project <\/td>\n<\/tr>\n\n 11<\/td>\n \t3\tTerms and definitions <\/td>\n<\/tr>\n \n 16<\/td>\n \t4\tThe control of risk <\/td>\n<\/tr>\n \n 19<\/td>\n Section 2: Design and management of earthworks
\t5\tPlanning of earthworks <\/td>\n<\/tr>\n\n 23<\/td>\n \t6\tSite conditions and investigations <\/td>\n<\/tr>\n \n 29<\/td>\n Figure 2\u2003The iterative feedback processes of a site investigation <\/td>\n<\/tr>\n \n 33<\/td>\n \t7\tDesign of earthworks <\/td>\n<\/tr>\n \n 37<\/td>\n Figure 3\u2003Example of possible surcharge combination on a slope <\/td>\n<\/tr>\n \n 39<\/td>\n Figure 4\u2003General procedure for determining characteristic values from measured values <\/td>\n<\/tr>\n \n 41<\/td>\n Figure 5\u2003Variations of f\u2019 with displacement <\/td>\n<\/tr>\n \n 42<\/td>\n Figure 6\u2003Variation of f\u2019, f\u2019r with Ip <\/td>\n<\/tr>\n \n 44<\/td>\n Figure 7\u2003Short and long term stability of embankment and cutting slopes <\/td>\n<\/tr>\n \n 56<\/td>\n Figure 8\u2003Design of earthworks drainage to capture significant flows <\/td>\n<\/tr>\n \n 67<\/td>\n Figure 9\u2003Determination of acceptability limits for coarse soils using relationship testing data
Figure 10\u2003Determination of acceptability limits for fine soils using relationship testing data <\/td>\n<\/tr>\n\n 68<\/td>\n Figure 11\u2003Example of relationship testing <\/td>\n<\/tr>\n \n 76<\/td>\n \t8\tSpecification of earthworks fill materials <\/td>\n<\/tr>\n \n 84<\/td>\n \t9\tConstruction of earthworks <\/td>\n<\/tr>\n \n 94<\/td>\n \t10\tAdoption <\/td>\n<\/tr>\n \n 97<\/td>\n \t11\tEarthworks asset management <\/td>\n<\/tr>\n \n 105<\/td>\n \t12\tDecommissioning and disposal of earthworks assets <\/td>\n<\/tr>\n \n 106<\/td>\n Section 3: Temporary excavations, trenches pits and\u00a0shafts
\t13\tTemporary excavations <\/td>\n<\/tr>\n\n 112<\/td>\n \t14\tConstruction procedure <\/td>\n<\/tr>\n \n 113<\/td>\n \t15\tTrenches <\/td>\n<\/tr>\n \n 116<\/td>\n \t16\tPits and shafts <\/td>\n<\/tr>\n \n 117<\/td>\n \tAnnex A (informative)\tPotential modes of failure of slopes <\/td>\n<\/tr>\n \n 121<\/td>\n \t\tBibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Code of practice for earthworks<\/b><\/p>\n
\n\n
\n Published By<\/td>\n Publication Date<\/td>\n Number of Pages<\/td>\n<\/tr>\n \n BSI<\/b><\/a><\/td>\n 2010<\/td>\n 128<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":218402,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2641],"product_tag":[],"class_list":{"0":"post-218398","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-bsi","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/218398","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/218402"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=218398"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=218398"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=218398"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}