{"id":234390,"date":"2024-10-19T15:17:13","date_gmt":"2024-10-19T15:17:13","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/aws-d1-5m-d1-5-2020\/"},"modified":"2024-10-25T09:50:20","modified_gmt":"2024-10-25T09:50:20","slug":"aws-d1-5m-d1-5-2020","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/aws\/aws-d1-5m-d1-5-2020\/","title":{"rendered":"AWS D1.5M D1.5 2020"},"content":{"rendered":"

This code covers the welding requirements for welded bridges made from carbon and low-alloy constructional steels and designed to AASHTO or AREMA requirements. This 2020 edition contains dimensions in metric SI Units and U.S. Customary Units. Clauses 1 through 9 constitute a body of rules for the regulation of welding in steel construction. Clauses 10 and 11 do not contain provisions, as their analogue D1.1 sections are not applicable to the D1.5 code. Clause 12 contains the requirements for fabricating fracture critical members.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\nCover page <\/td>\n<\/tr>\n
2<\/td>\nTitle page
\n
Abstract <\/td>\n<\/tr>\n
3<\/td>\nCopyright page
\n <\/td>\n<\/tr>\n
4<\/td>\nStatement on the Use of American Welding Society Standards <\/td>\n<\/tr>\n
6<\/td>\nPersonnel <\/td>\n<\/tr>\n
10<\/td>\nForeword <\/td>\n<\/tr>\n
14<\/td>\nTable of Contents <\/td>\n<\/tr>\n
19<\/td>\nList of Tables <\/td>\n<\/tr>\n
20<\/td>\nList of Figures <\/td>\n<\/tr>\n
22<\/td>\nList of Forms <\/td>\n<\/tr>\n
24<\/td>\nBridge Welding Code
1. General Provisions
1.1 Application
1.2 Base Metal <\/td>\n<\/tr>\n
25<\/td>\n1.3 Welding Processes <\/td>\n<\/tr>\n
26<\/td>\n1.4 Fabricator Requirements
1.5 Definitions
1.6 Welding Symbols
1.7 Safety Precautions
1.8 Standard Units of Measurement
1.9 Welding Procedure Specifications (WPSs) <\/td>\n<\/tr>\n
27<\/td>\n1.10 Mechanical Testing
1.11 Reference Documents <\/td>\n<\/tr>\n
28<\/td>\n2. Normative References <\/td>\n<\/tr>\n
31<\/td>\n3. Terms and Definitions <\/td>\n<\/tr>\n
40<\/td>\n4. Design of Welded Connections
Part A General Requirements
4.1 Drawings <\/td>\n<\/tr>\n
41<\/td>\n4.2 Basic Unit Stresses
4.3 Effective Weld Areas, Lengths, Throats, and Sizes <\/td>\n<\/tr>\n
42<\/td>\nPart B Structural Details
4.4 General
4.5 Welded Filler Plates
4.6 PJP Groove Welds
Part C Details of Welded Joints
4.7 Joint Qualification
4.8 Details of Fillet Welds <\/td>\n<\/tr>\n
43<\/td>\n4.9 Details of Plug and Slot Welds
4.10 Lap Joints <\/td>\n<\/tr>\n
44<\/td>\n4.11 Corner and T-Joints
4.12 CJP Groove Welds
4.13 PJP Groove Welds (see Figure 4.5)
4.14 Prohibited Types of Joints and Welds <\/td>\n<\/tr>\n
45<\/td>\n4.15 Combinations of Welds
4.16 Welds in Combination with Rivets and Bolts
4.17 Connection Details <\/td>\n<\/tr>\n
86<\/td>\n5. Workmanship
5.1 General Requirements
5.2 Preparation of Base Metal <\/td>\n<\/tr>\n
90<\/td>\n5.3 Assembly <\/td>\n<\/tr>\n
92<\/td>\n5.4 Control of Distortion and Shrinkage <\/td>\n<\/tr>\n
93<\/td>\n5.5 Dimensional Tolerances <\/td>\n<\/tr>\n
96<\/td>\n5.6 Weld Profiles
5.7 Repairs <\/td>\n<\/tr>\n
98<\/td>\n5.8 Peening
5.9 Caulking
5.10 Arc Strikes
5.11 Weld Cleaning
5.12 Weld Termination <\/td>\n<\/tr>\n
99<\/td>\n5.13 Weld Backing <\/td>\n<\/tr>\n
104<\/td>\n6. Technique
Part A General Requirements
6.1 Filler Metal Requirements <\/td>\n<\/tr>\n
106<\/td>\n6.2 Preheat and Interpass Temperature Requirements <\/td>\n<\/tr>\n
107<\/td>\n6.3 Heat Input Control for Grade HPS 690W [HPS 100W] Steel
6.4 Stress Relief Heat Treatment
Part B Shielded Metal Arc Welding (SMAW)
6.5 Electrodes for SMAW <\/td>\n<\/tr>\n
108<\/td>\n6.6 Procedures for SMAW <\/td>\n<\/tr>\n
109<\/td>\nPart C Submerged Arc Welding (SAW)
6.7 General Requirements
6.8 Electrodes and Fluxes for SAW <\/td>\n<\/tr>\n
110<\/td>\n6.9 Procedures for SAW with a Single Electrode
6.10 Procedures for SAW with Parallel and Multiple Electrodes <\/td>\n<\/tr>\n
111<\/td>\nPart D Gas Metal Arc Welding (GMAW) and Flux Cored Arc Welding (FCAW)
6.11 GMAW\/FCAW Electrodes
6.12 Shielding Gas
6.13 Procedures for GMAW and FCAW with a Single Electrode <\/td>\n<\/tr>\n
112<\/td>\nPart E Electrogas Welding (EGW)
6.14 Qualification of Process, WPSs, and Joint Details
6.15 Condition of Electrodes and Guide Tubes
6.16 Shielding Gas
6.17 Procedures for EGW <\/td>\n<\/tr>\n
113<\/td>\nPart F Electroslag Welding (ESW)
6.18 Qualification of Process, WPSs, and Joint Details
6.19 Condition of Electrodes and Consumable Guides <\/td>\n<\/tr>\n
114<\/td>\n6.20 Condition of Flux
6.21 Consumable Guide Electrical Insulators
6.22 Procedures for ESW <\/td>\n<\/tr>\n
116<\/td>\nPart G Plug and Slot Welds
6.23 Plug Welds
6.24 Slot Welds
6.25 Plug and Slot Welds
Part H Control of Production Welding Variables
6.26 Tests
6.27 Control of Variables
6.28 Calibration of Equipment <\/td>\n<\/tr>\n
117<\/td>\n6.29 Current Control <\/td>\n<\/tr>\n
123<\/td>\n7. Qualification
7.0 Scope
Part A Welding Procedure Specification (WPS) Qualification
7.1 Approval
7.2 Qualification Responsibility
7.3 Duration <\/td>\n<\/tr>\n
124<\/td>\n7.4 Base Metal <\/td>\n<\/tr>\n
125<\/td>\n7.5 Welding Consumables
7.6 Test Plate Thickness
7.7 General Requirements for WPS Qualification <\/td>\n<\/tr>\n
126<\/td>\n7.8 Position of Test Welds
7.9 Options for WPS Qualification or Prequalification <\/td>\n<\/tr>\n
127<\/td>\n7.10 Fillet Weld WPS Qualification
7.11 Prequalified WPS
7.12 Heat Input Qualifications <\/td>\n<\/tr>\n
129<\/td>\n7.13 Electrogas Welding
7.14 Electroslag Welding <\/td>\n<\/tr>\n
130<\/td>\n7.15 Type of Tests and Purpose
7.16 Weld Specimens\u2014Number, Type, and Preparation <\/td>\n<\/tr>\n
131<\/td>\n7.17 Nondestructive Testing (NDT)
7.18 Method of Testing Specimens
7.19 Test Results Required <\/td>\n<\/tr>\n
132<\/td>\n7.20 Retests <\/td>\n<\/tr>\n
133<\/td>\nPart B Welder, Welding Operator, and Tack Welder Qualification
7.21 General Requirements <\/td>\n<\/tr>\n
134<\/td>\n7.22 Production Welding Positions Qualified
7.23 Qualification Tests Required <\/td>\n<\/tr>\n
135<\/td>\n7.24 Limitations of Variables <\/td>\n<\/tr>\n
136<\/td>\n7.25 Test Specimens: Number, Type, and Preparation
7.26 Method of Testing Specimens <\/td>\n<\/tr>\n
137<\/td>\n7.27 Test Results Required <\/td>\n<\/tr>\n
138<\/td>\n7.28 Retests <\/td>\n<\/tr>\n
174<\/td>\n8. Inspection
Part A General Requirements
8.1 General <\/td>\n<\/tr>\n
175<\/td>\n8.2 Inspection of Materials
8.3 Inspection of WPS Qualification and Equipment
8.4 Inspection of Welder, Welding Operator, and Tack Welder Qualifications <\/td>\n<\/tr>\n
176<\/td>\n8.5 Inspection of Work and Records
8.6 Obligations of the Contractor <\/td>\n<\/tr>\n
177<\/td>\n8.7 Nondestructive Testing (NDT) <\/td>\n<\/tr>\n
179<\/td>\nPart B Radiographic Testing (RT) of Groove Welds in Butt Joints
8.8 Extent of Testing
8.10 RT Procedure <\/td>\n<\/tr>\n
182<\/td>\n8.11 Acceptability of Welds
8.12 Examination, Report, and Disposition of Radiographs <\/td>\n<\/tr>\n
183<\/td>\nPart C Ultrasonic Testing (UT) of Groove Welds
8.13 General
8.14 Extent of Testing
8.15 UT Equipment <\/td>\n<\/tr>\n
184<\/td>\n8.16 Reference Standards
8.17 Equipment Qualification <\/td>\n<\/tr>\n
185<\/td>\n8.18 Calibration for Testing <\/td>\n<\/tr>\n
186<\/td>\n8.19 Testing Procedures <\/td>\n<\/tr>\n
187<\/td>\n8.20 Preparation and Disposition of Reports
8.21 Calibration of the UT Unit With IIW or Other Approved Reference Blocks <\/td>\n<\/tr>\n
188<\/td>\n8.22 Equipment Qualification Procedures <\/td>\n<\/tr>\n
190<\/td>\n8.23 Discontinuity Size Evaluation Procedures <\/td>\n<\/tr>\n
191<\/td>\n8.24 Scanning Patterns
8.25 Examples of dB Accuracy Certification
Part D Weld Acceptance Criteria
8.26 Quality of Welds <\/td>\n<\/tr>\n
213<\/td>\n9. Stud Welding
9.1 Scope
9.2 General Requirements <\/td>\n<\/tr>\n
214<\/td>\n9.3 Mechanical Requirements
9.4 Workmanship <\/td>\n<\/tr>\n
215<\/td>\n9.5 Technique
9.6 Stud Application Qualification Requirements <\/td>\n<\/tr>\n
216<\/td>\n9.7 Production Control <\/td>\n<\/tr>\n
218<\/td>\n9.8 Inspection Requirements <\/td>\n<\/tr>\n
222<\/td>\n10. Tubular Structures <\/td>\n<\/tr>\n
223<\/td>\n11. Strengthening and Repairing Existing Structures <\/td>\n<\/tr>\n
224<\/td>\n12. AASHTO\/AWS Fracture Control Plan (FCP) for Nonredundant Members
12.1 General Provisions
12.2 Definitions
12.3 Contract Documents <\/td>\n<\/tr>\n
225<\/td>\n12.4 Base Metal Requirements
12.5 Welding Processes
12.6 Consumable Requirements <\/td>\n<\/tr>\n
228<\/td>\n12.7 Welding Procedure Specification (WPS) <\/td>\n<\/tr>\n
229<\/td>\n12.8 Certification and Qualification
12.9 As-Received Inspection of Base Metal
12.10 Thermal Cutting
12.11 Repair of Base Metal <\/td>\n<\/tr>\n
230<\/td>\n12.12 Straightening, Curving, and Cambering
12.13 Tack Welds and Temporary Welds
12.14 Preheat and Interpass Temperature Control
12.15 Postweld Thermal Treatments <\/td>\n<\/tr>\n
231<\/td>\n12.16 Weld Inspection <\/td>\n<\/tr>\n
232<\/td>\n12.17 Repair Welding <\/td>\n<\/tr>\n
238<\/td>\nAnnexes Normative Information
Informative Information <\/td>\n<\/tr>\n
240<\/td>\nAnnex A (Normative) Effective Throat <\/td>\n<\/tr>\n
242<\/td>\nAnnex B (Normative) Effective Throats of Fillet Welds in Skewed T-Joints <\/td>\n<\/tr>\n
244<\/td>\nAnnex C (Normative) Flatness of Girder Webs\u2014Bridges <\/td>\n<\/tr>\n
249<\/td>\nAnnex D (Normative) Manufacturer\u2019s Stud Base Qualification Requirements
D1. Purpose
D2. Responsibility for Tests
D3. Extent of Qualification
D4. Duration of Qualification
D5. Preparation of Specimens <\/td>\n<\/tr>\n
250<\/td>\nD6. Number of Test Specimens
D7. Tests
D8. Retests
D9. Acceptance
D10. Manufacturer\u2019s Qualification Test Data <\/td>\n<\/tr>\n
253<\/td>\nAnnex E (Normative)
Part A Qualification and Calibration of the UT Unit with Other Approved Reference Blocks (see Figure 8.5B)
E1. Longitudinal Mode
E2. Shear Wave Mode (Transverse) <\/td>\n<\/tr>\n
254<\/td>\nE3. Horizontal Linearity Procedure
Part B UT Equipment Qualification Procedures <\/td>\n<\/tr>\n
262<\/td>\nAnnex F (Normative) Guidelines on Alternative Methods for Determining Preheat
F1. Introduction
F2. Methods
F3. HAZ Hardness Control <\/td>\n<\/tr>\n
263<\/td>\nF4. Hydrogen Control <\/td>\n<\/tr>\n
264<\/td>\nF5. Selection of Method
F6. Detailed Computation Guide <\/td>\n<\/tr>\n
265<\/td>\nF6.2 Hydrogen Control Method <\/td>\n<\/tr>\n
274<\/td>\nAnnex G (Normative) Welding Requirements for Conventional, Nonfracture Critical AASHTO M 270M\/M 270 (A709\/A709M) HPS 485W [HPS 70W] Components with Reduced Preheat and Interpass Temperature
G1. Purpose
G2. Filler Metal Requirements
G3. Additional NDT Testing Requirement <\/td>\n<\/tr>\n
275<\/td>\nG4. WPS <\/td>\n<\/tr>\n
276<\/td>\nAnnex H (Normative) ESW Consumable Requirements
H1. Electrode
H2. Consumable Guide
H3. Flux Moisture Content <\/td>\n<\/tr>\n
278<\/td>\nAnnex I (Normative) Guidelines for the Acceptance of Alternative ESW Processes <\/td>\n<\/tr>\n
280<\/td>\nAnnex J (Normative) Advanced Ultrasonic Examination
J1. Introduction
J2. Scope
J3. Definitions <\/td>\n<\/tr>\n
282<\/td>\nJ4. Personnel Requirements.
J5. Equipment <\/td>\n<\/tr>\n
283<\/td>\nJ6. Equipment Qualification
J7. Scan Plans <\/td>\n<\/tr>\n
285<\/td>\nJ8. Calibration for Testing
J8.1 Straight Beam Calibration.
J8.2 Shear Wave Calibration
J9. Examination Procedure <\/td>\n<\/tr>\n
286<\/td>\nJ10. Evaluation <\/td>\n<\/tr>\n
287<\/td>\nJ11. Data Analysis
J12. Data Management
J13. Documentation and Reporting
J14. System Linearity Verification <\/td>\n<\/tr>\n
288<\/td>\nJ14.2 Display Height Linearity Verification Procedure
J14.3 Amplitude Control Linearity Verification Procedure <\/td>\n<\/tr>\n
289<\/td>\nJ14.4 Time-Based Linearity (Horizontal Linearity) Verification Procedure
J15. Background References <\/td>\n<\/tr>\n
296<\/td>\nAnnex K (Informative) Weld Quality Requirements for Tension Joints <\/td>\n<\/tr>\n
298<\/td>\nAnnex L (Informative) Description of Common Weld and Base Metal Discontinuities (Reprinted with modification from New York State Steel Construction Manual)
L1. General
L2. List of Discontinuities <\/td>\n<\/tr>\n
310<\/td>\nAnnex M (Informative) Short Circuiting Transfer <\/td>\n<\/tr>\n
314<\/td>\nAnnex N Suggested Sample Welding Forms <\/td>\n<\/tr>\n
328<\/td>\nAnnex O (Informative) Guide for Use of Electroslag Welding\u2014Narrow Gap (ESW-NG)
O1. General
O2. Background Documents <\/td>\n<\/tr>\n
329<\/td>\nO3. Definitions
O4. Process Description
O5. Equipment <\/td>\n<\/tr>\n
331<\/td>\nO6. Electrodes and Flux <\/td>\n<\/tr>\n
332<\/td>\nO7. Sumps and Run-off Tabs
O8. Base Metals
O9. Joint Design
O10. Assembly and Alignment <\/td>\n<\/tr>\n
333<\/td>\nO11. Application Restrictions
O12. Process Variables <\/td>\n<\/tr>\n
334<\/td>\nO13. Inspection
O14. Repair <\/td>\n<\/tr>\n
335<\/td>\nO15. Qualifications
O16. Weld Quality
O17. Troubleshooting Guide <\/td>\n<\/tr>\n
342<\/td>\nAnnex P Requesting an Official Interpretation of a Joint AASHTO\/AWS Standard
P1. Introduction
P2. Limitations
P3. General Procedure for all Requests <\/td>\n<\/tr>\n
343<\/td>\nP4. AWS Policy on Interpretations
P5. AWS Response to Requests
P6. Telephone Inquiries <\/td>\n<\/tr>\n
344<\/td>\nCommentary on Bridge Welding Code <\/td>\n<\/tr>\n
346<\/td>\nForeword <\/td>\n<\/tr>\n
350<\/td>\nCommentary on Bridge Welding Code
C-1. General Provisions
C-1.1 Application <\/td>\n<\/tr>\n
351<\/td>\nC-1.2 Base Metal
C-1.3 Welding Processes <\/td>\n<\/tr>\n
352<\/td>\nC-1.8 Standard Units of Measurement
C-1.9 Welding Procedure Specifications (WPSs)
C-1.10 Mechanical Testing <\/td>\n<\/tr>\n
353<\/td>\nC-4. Design of Welded Connections
Part A General Requirements
C-4.1 Drawings <\/td>\n<\/tr>\n
355<\/td>\nC-4.2 Basic Unit Stresses
C-4.3 Effective Weld Areas, Lengths, Throats, and Sizes <\/td>\n<\/tr>\n
356<\/td>\nPart B Structural Details
C-4.4 General
C-4.5 Welded Filler Plates <\/td>\n<\/tr>\n
357<\/td>\nC-4.6 PJP Groove Welds
Part C Details of Welded Joints
C-4.7 Joint Qualification <\/td>\n<\/tr>\n
358<\/td>\nC-4.8 Details of Fillet Welds <\/td>\n<\/tr>\n
359<\/td>\nC-4.9 Details of Plug and Slot Welds
C-4.10 Lap Joints
C-4.11 Corner and T-Joints <\/td>\n<\/tr>\n
360<\/td>\nC-4.12 CJP Groove Welds
C-4.13 PJP Groove Welds <\/td>\n<\/tr>\n
361<\/td>\nC-4.14 Prohibited Types of Joints and Welds <\/td>\n<\/tr>\n
362<\/td>\nC-4.15 Combinations of Welds
C-4.16 Welds in Combination with Rivets and Bolts
C-4.17 Connection Details <\/td>\n<\/tr>\n
368<\/td>\nC-5 Workmanship
C-5.1 General Requirements <\/td>\n<\/tr>\n
369<\/td>\nC-5.2 Preparation of Base Metal <\/td>\n<\/tr>\n
374<\/td>\nC-5.3 Assembly <\/td>\n<\/tr>\n
378<\/td>\nC-5.4 Control of Distortion and Shrinkage <\/td>\n<\/tr>\n
381<\/td>\nC-5.5 Dimensional Tolerances <\/td>\n<\/tr>\n
385<\/td>\nC-5.6 Weld Profiles
C-5.7 Repairs <\/td>\n<\/tr>\n
387<\/td>\nC-5.8 Peening <\/td>\n<\/tr>\n
388<\/td>\nC-5.9 Caulking
C-5.10 Arc Strikes
C-5.11 Weld Cleaning
C-5.12 Weld Termination <\/td>\n<\/tr>\n
389<\/td>\nC-5.13 Weld Backing <\/td>\n<\/tr>\n
396<\/td>\nC-6. Technique.
Part A General Requirements
C-6.1 Filler Metal Requirements <\/td>\n<\/tr>\n
398<\/td>\nC-6.2 Preheat and Interpass Temperature Requirements <\/td>\n<\/tr>\n
401<\/td>\nC-6.3 Heat Input Control for Grade HPS 690W [HPS 100W] Steel <\/td>\n<\/tr>\n
402<\/td>\nC-6.4 Stress Relief Heat Treatment <\/td>\n<\/tr>\n
403<\/td>\nPart B Shielded Metal Arc Welding
C-6.5 Electrodes For SMAW <\/td>\n<\/tr>\n
405<\/td>\nC-6.6 Procedures for SMAW <\/td>\n<\/tr>\n
406<\/td>\nPart C Submerged Arc Welding (SAW)
C-6.7 General Requirements <\/td>\n<\/tr>\n
407<\/td>\nC-6.8 Electrodes and Fluxes for SAW <\/td>\n<\/tr>\n
409<\/td>\nC-6.9 Procedures for Submerged Arc Welding with a Single Electrode
C-6.10 Procedures for SAW with Parallel and Multiple Electrodes <\/td>\n<\/tr>\n
410<\/td>\nPart D Gas Metal Arc Welding (GMAW) and Flux Cored Arc Welding (FCAW)
C-6.11 GMAW\/FCAW Electrodes
C-6.12 Shielding Gas <\/td>\n<\/tr>\n
411<\/td>\nC-6.13 Procedures for GMAW and FCAW with a Single Electrode <\/td>\n<\/tr>\n
412<\/td>\nC-6.20 Condition of Flux. See Annex O.
C-6.21 Consumable Guide Electrical Insulators. See Annex O.
Part G Plug and Slot Welds
C-6.23 Plug Welds <\/td>\n<\/tr>\n
413<\/td>\nC-6.24 Slot Welds
C-6.25 Plug and Slot Welds
Part H Control of Production Welding Variables
C-6.27 Control of Variables
C-6.28 Calibration of Equipment
C-6.29 Current Control <\/td>\n<\/tr>\n
415<\/td>\nC-7. Qualification
Introduction
C-7.0 Scope <\/td>\n<\/tr>\n
416<\/td>\nPart A Welding Procedure Specification (WPS) Qualification
C-7.1 Approval <\/td>\n<\/tr>\n
417<\/td>\nC-7.2 Qualification Responsibility <\/td>\n<\/tr>\n
418<\/td>\nC-7.3 Duration
C-7.4 Base Metal <\/td>\n<\/tr>\n
419<\/td>\nC-7.5 Welding Consumables <\/td>\n<\/tr>\n
420<\/td>\nC-7.6 Test Plate Thickness
C-7.7 General Requirements for WPS Qualification <\/td>\n<\/tr>\n
422<\/td>\nC-7.8 Position of Test Welds
C-7.9 Options for WPS Qualification or Prequalification
C-7.10 Fillet Weld WPS Qualification <\/td>\n<\/tr>\n
423<\/td>\nC-7.11 Prequalified WPS
C-7.12 Heat Input Qualifications <\/td>\n<\/tr>\n
428<\/td>\nC-7.13 Electrogas Welding
C-7.14 Electroslag Welding <\/td>\n<\/tr>\n
429<\/td>\nC-7.15 Type of Tests and Purpose
C-7.17 Nondestructive Testing (NDT)
C-7.18 Method of Testing Specimens
C-7.19 Test Results Required
Part B Welder, Welding Operator, and Tack Welder Qualification <\/td>\n<\/tr>\n
430<\/td>\nC-7.21 General Requirements. <\/td>\n<\/tr>\n
431<\/td>\nC-7.24 Limitations of Variables
C-7.26 Method of Testing Specimens
C-7.28 Retests. <\/td>\n<\/tr>\n
435<\/td>\nC-8. Inspection
Part A General Requirements
C-8.1 General <\/td>\n<\/tr>\n
437<\/td>\nC-8.2 Inspection of Materials
C-8.3 Inspection of WPS Qualification and Equipment
C-8.4 Inspection of Welder, Welding Operator, and Tack Welder Qualifications <\/td>\n<\/tr>\n
438<\/td>\nC-8.5 Inspection of Work and Records <\/td>\n<\/tr>\n
439<\/td>\nC-8.6 Obligations of the Contractor
C-8.7 Nondestructive Testing (NDT) <\/td>\n<\/tr>\n
442<\/td>\nPart B Radiographic Testing (RT) of Groove Welds in Butt Joints
C-8.9 General
C-8.10 RT Procedure <\/td>\n<\/tr>\n
445<\/td>\nC-8.11 Acceptability of Welds
C-8.12 Examination, Report, and Disposition of Radiographs
Part C Ultrasonic Testing (UT) of Groove Welds
C-8.13 General <\/td>\n<\/tr>\n
446<\/td>\nC-8.14 Extent of Testing
C-8.15 UT Equipment
C-8.16 Reference Standards
C-8.17 Equipment Qualification <\/td>\n<\/tr>\n
447<\/td>\nC-8.18 Calibration for Testing
C-8.19 Testing Procedures <\/td>\n<\/tr>\n
449<\/td>\nC-8.20 Preparation and Disposition of Reports
C-8.21 Calibration of the UT Unit with IIW or Other Approved Reference Blocks
C-8.22 Equipment Qualification Procedures
C-8.23 Discontinuity Size Evaluation Procedures <\/td>\n<\/tr>\n
450<\/td>\nC-8.24 Scanning Patterns
C-8.25 Examples of dB Accuracy Certification
Part D Weld Acceptance Criteria
C-8.26 Quality of Welds <\/td>\n<\/tr>\n
459<\/td>\nC-9. Stud Welding
C-9.1 Scope
C-9.2 General Requirements <\/td>\n<\/tr>\n
460<\/td>\nC-9.3 Mechanical Requirements
C-9.4 Workmanship <\/td>\n<\/tr>\n
461<\/td>\nC-9.5 Technique <\/td>\n<\/tr>\n
462<\/td>\nC-9.6 Stud Application Qualification Requirements <\/td>\n<\/tr>\n
463<\/td>\nC-9.7 Production Control <\/td>\n<\/tr>\n
464<\/td>\nC-9.8 Inspection Requirements <\/td>\n<\/tr>\n
465<\/td>\nC-12. AASHTO\/AWS Fracture Control Plan (FCP) for Nonredundant Members
C-12.1 General Provisions
C-12.2 Definitions <\/td>\n<\/tr>\n
466<\/td>\nC-12.3 Contract Documents <\/td>\n<\/tr>\n
467<\/td>\nC-12.4 Base Metal Requirements <\/td>\n<\/tr>\n
468<\/td>\nC-12.5 Welding Processes
C-12.6 Consumable Requirements <\/td>\n<\/tr>\n
473<\/td>\nC-12.7 Welding Procedure Specification (WPS)
C-12.8 Certification and Qualification <\/td>\n<\/tr>\n
474<\/td>\nC-12.9 As-Received Inspection of Base Metal
C-12.10 Thermal Cutting <\/td>\n<\/tr>\n
475<\/td>\nC-12.11 Repair of Base Metal
C-12.12 Straightening, Curving, and Cambering
C-12.13 Tack Welds and Temporary Welds <\/td>\n<\/tr>\n
476<\/td>\nC-12.14 Preheat and Interpass Temperature Control <\/td>\n<\/tr>\n
478<\/td>\nC-12.15 Postweld Thermal Treatments
C-12.16 Weld Inspection <\/td>\n<\/tr>\n
479<\/td>\nC-12.17 Repair Welding <\/td>\n<\/tr>\n
482<\/td>\nC-Annex G Welding Requirements for Conventional, Nonfracture Critical AASHTO M 270M\/M 270 (A709\/A709M) HPS 485W [HPS 70W] Components with Reduced Preheat and Interpass Temperature
C-G2. Filler Metal Requirements <\/td>\n<\/tr>\n
484<\/td>\nC-Annex H ESW Consumable Requirements <\/td>\n<\/tr>\n
486<\/td>\nC-Annex J Advanced Ultrasonic Examination <\/td>\n<\/tr>\n
490<\/td>\nIndex
A
B
\n <\/td>\n<\/tr>\n
491<\/td>\nC
\n <\/td>\n<\/tr>\n
492<\/td>\nD
\n <\/td>\n<\/tr>\n
493<\/td>\nE
\n <\/td>\n<\/tr>\n
495<\/td>\nF
\n <\/td>\n<\/tr>\n
496<\/td>\nG
\n <\/td>\n<\/tr>\n
497<\/td>\nH
\n
I
\n <\/td>\n<\/tr>\n
498<\/td>\nJ
\n
K
\n
L
\n <\/td>\n<\/tr>\n
499<\/td>\nM
\n
N
\n
O
\n
P
\n <\/td>\n<\/tr>\n
500<\/td>\nQ
\n <\/td>\n<\/tr>\n
501<\/td>\nR
\n <\/td>\n<\/tr>\n
502<\/td>\nS
\n <\/td>\n<\/tr>\n
503<\/td>\nT
\n <\/td>\n<\/tr>\n
504<\/td>\nU
\n
V
\n <\/td>\n<\/tr>\n
505<\/td>\nW
\n <\/td>\n<\/tr>\n
506<\/td>\nX
\n
Y
\n
Z
\n <\/td>\n<\/tr>\n
508<\/td>\nList of AWS Documents on Structural Welding <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

AASHTO\/AWS D1.5M\/D1.5:2020 Bridge Welding Code<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
AWS<\/b><\/a><\/td>\n2020<\/td>\n510<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":234396,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2645],"product_tag":[],"class_list":{"0":"post-234390","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-aws","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/234390","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/234396"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=234390"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=234390"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=234390"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}