{"id":300315,"date":"2024-10-19T20:29:49","date_gmt":"2024-10-19T20:29:49","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/aci-522-1-2020\/"},"modified":"2024-10-25T17:56:05","modified_gmt":"2024-10-25T17:56:05","slug":"aci-522-1-2020","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/aci\/aci-522-1-2020\/","title":{"rendered":"ACI 522.1 2020"},"content":{"rendered":"
This Specification covers minimum requirements for the construction of pervious concrete pavement. This Specification covers materials, preparation, forming, lacing, finishing, jointing, curing, and quality control of pervious concrete pavement. Provisions governing testing, evaluation, and acceptance of pervious concrete pavement are included. Keywords: construction; curing; inspection; jointing; parking lots; testing<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
3<\/td>\n | Title Page <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | PART 1\u2014GENERAL 1.1\u2014Scope 1.2\u2014Interpretation 1.3\u2014Definitions <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | 1.4\u2014Referenced standards 1.5\u2014Submittals 1.6\u2014Quality assurance and quality control <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | PART 2\u2014PRODUCTS 2.1\u2014Subbase 2.2\u2014Pervious concrete <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | 2.3\u2014Isolation joint material 2.4\u2014Forms 2.5\u2014Curing materials PART 3\u2014EXECUTION 3.1\u2014Subgrade preparation 3.2\u2014Subbase 3.3\u2014Setting formwork 3.4\u2014Batching, mixing, and delivery 3.5\u2014Placing and finishing fixed-form pavement 3.6\u2014Placing and finishing slipform pavement <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 3.7\u2014Edging 3.8\u2014Final surface texture 3.9\u2014Jointing 3.10\u2014Curing 3.11\u2014Hot or cold weather construction 3.12\u2014Tolerances 3.13\u2014Opening to traffic NOTES TO SPECIFIER (nonmandatory) General notes FOREWORD TO CHECKLISTS <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" ACI SPEC-522.1-20: Specification for Construction of Pervious Concrete Pavement<\/b><\/p>\n |