{"id":312995,"date":"2024-10-19T21:32:14","date_gmt":"2024-10-19T21:32:14","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-iso-21225-12018\/"},"modified":"2024-10-25T19:35:08","modified_gmt":"2024-10-25T19:35:08","slug":"bs-en-iso-21225-12018","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-iso-21225-12018\/","title":{"rendered":"BS EN ISO 21225-1:2018"},"content":{"rendered":"
This document specifies requirements and test methods for pipes and fittings which are part of plastics piping systems for the trenchless replacement of underground non-pressure and pressure drainage and sewerage networks and underground water and gas supply networks, by means of pipe bursting and pipe extraction.<\/p>\n
It is applicable to polyethylene (PE) pipes and fittings, as manufactured, as well as to the installed replacement system.<\/p>\n
This document is intended to be used in conjunction with standards applicable for the construction of PE pipeline systems where available.<\/p>\n
Regarding manufactured pipes it is applicable to three different PE pipe types:<\/p>\n
PE solid wall single layered pipes (nominal outside diameter, d<\/i>n<\/sub>), including any identification stripes;<\/p>\n<\/li>\n PE pipes with co-extruded layers on either or both the outside and inside of the pipe (total outside diameter, d<\/i>n<\/sub>), as specified in Annex A, where all layers have the same MRS rating;<\/p>\n<\/li>\n PE pipes (outside diameter, d<\/i>n<\/sub>) having a peelable, contiguous, thermoplastics additional layer on the outside of the pipe (\u201ccoated pipe\u201d), see Annex A.<\/p>\n<\/li>\n<\/ul>\n In addition it is applicable to:<\/p>\n jointing of pipe lengths by means of butt fusion joint;<\/p>\n<\/li>\n jointing of pipe lengths by means of electrofusion joint;<\/p>\n<\/li>\n fabricated and injection-moulded fittings made of PE.<\/p>\n<\/li>\n<\/ul>\n Pipes made from other plastics, e.g. glass reinforced plastics (GRP), are outside the scope of this document.<\/p>\n Plastics piping systems for the trenchless replacement of underground pipeline networks – Replacement on the line by pipe bursting and pipe extraction<\/b><\/p>\n\n
PDF Catalog<\/h4>\n
\n
\n PDF Pages<\/th>\n PDF Title<\/th>\n<\/tr>\n \n 2<\/td>\n National foreword <\/td>\n<\/tr>\n \n 4<\/td>\n European foreword <\/td>\n<\/tr>\n \n 6<\/td>\n Foreword <\/td>\n<\/tr>\n \n 7<\/td>\n Introduction <\/td>\n<\/tr>\n \n 9<\/td>\n 1 Scope
2 Normative references <\/td>\n<\/tr>\n\n 10<\/td>\n 3 Terms and definitions <\/td>\n<\/tr>\n \n 11<\/td>\n 3.1 General <\/td>\n<\/tr>\n \n 12<\/td>\n 3.2 Techniques <\/td>\n<\/tr>\n \n 13<\/td>\n 3.3 Geometrics <\/td>\n<\/tr>\n \n 14<\/td>\n 3.4 Materials <\/td>\n<\/tr>\n \n 15<\/td>\n 3.5 Joints
4 Symbols and abbreviated terms
4.1 Symbols <\/td>\n<\/tr>\n\n 16<\/td>\n 4.2 Abbreviated terms
5 Design aspects
6 Material selection
6.1 Pipes and fittings
6.2 Regional requirements for pipes and fittings <\/td>\n<\/tr>\n\n 17<\/td>\n 6.3 Ancillary components
7 Installation practice
7.1 Preparatory work
7.2 Storage, handling and transport <\/td>\n<\/tr>\n\n 18<\/td>\n 7.3 Equipment
7.3.1 General
7.3.2 Inspection equipment
7.3.3 Lifting equipment
7.3.4 Butt fusion equipment and debeading equipment
7.3.5 Pipe skids\/rollers
7.3.6 Winching and rod-pulling equipment <\/td>\n<\/tr>\n\n 19<\/td>\n 7.3.7 Pipe bursting equipment
7.3.8 Pipe extraction equipment <\/td>\n<\/tr>\n\n 20<\/td>\n 7.3.9 Electrofusion equipment
7.4 Installation
7.4.1 General <\/td>\n<\/tr>\n\n 21<\/td>\n 7.4.2 Disconnection from the existing pipeline
7.5 Process-related inspection and testing
7.6 Finishing off
7.7 Reconnection to the existing pipeline system
8 Fitness for purpose
8.1 General <\/td>\n<\/tr>\n\n 22<\/td>\n 8.2 Final inspection
8.3 Pressure testing
8.4 Disinfection
8.5 Documentation <\/td>\n<\/tr>\n\n 23<\/td>\n Annex A (normative) Layered pipes <\/td>\n<\/tr>\n \n 24<\/td>\n Annex B (informative) Pipe design considerations particular to pipe bursting and pipe extraction <\/td>\n<\/tr>\n \n 26<\/td>\n Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" \n\n
\n Published By<\/td>\n Publication Date<\/td>\n Number of Pages<\/td>\n<\/tr>\n \n BSI<\/b><\/a><\/td>\n 2018<\/td>\n 28<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":313003,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[349,2641],"product_tag":[],"class_list":{"0":"post-312995","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-23-040-20","7":"product_cat-bsi","9":"first","10":"instock","11":"sold-individually","12":"shipping-taxable","13":"purchasable","14":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/312995","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/313003"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=312995"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=312995"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=312995"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}