{"id":347489,"date":"2024-10-20T00:26:30","date_gmt":"2024-10-20T00:26:30","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iso-iec-265612019\/"},"modified":"2024-10-25T23:57:10","modified_gmt":"2024-10-25T23:57:10","slug":"bs-iso-iec-265612019","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iso-iec-265612019\/","title":{"rendered":"BS ISO\/IEC 26561:2019"},"content":{"rendered":"
This document, within the context of methods and tools for supporting the diagnosis of the organization\u2019s capability to adopt or improve software and systems product line engineering:<\/b><\/p>\n defines processes for product line technical probe; those processes are described in terms of purpose, inputs, tasks and outcomes;<\/p>\n<\/li>\n defines method capabilities to support the defined tasks of each process; and<\/p>\n<\/li>\n defines tool capabilities that automate or semi-automate tasks and methods.<\/p>\n<\/li>\n<\/ul>\n This document does not concern processes and capabilities of tools and methods for a single system but rather deals with those for a family of products.<\/p>\n Software and systems engineering. Methods and tools for product line technical probe<\/b><\/p>\n\n
PDF Catalog<\/h4>\n
\n
\n PDF Pages<\/th>\n PDF Title<\/th>\n<\/tr>\n \n 2<\/td>\n undefined <\/td>\n<\/tr>\n \n 7<\/td>\n Foreword <\/td>\n<\/tr>\n \n 8<\/td>\n Introduction <\/td>\n<\/tr>\n \n 11<\/td>\n 1 Scope
2 Normative references
3 Terms and Definitions <\/td>\n<\/tr>\n\n 12<\/td>\n 4 Abbreviated terms
5 Reference model for product line technical probe
5.1 Overview <\/td>\n<\/tr>\n\n 13<\/td>\n 5.2 Reference model for product line technical probe <\/td>\n<\/tr>\n \n 16<\/td>\n 6 Product line technical probe management
6.1 General
6.2 Technical probe planning
6.2.1 Principal constituents <\/td>\n<\/tr>\n\n 17<\/td>\n 6.2.2 Establish technical probe goals
6.2.3 Define key procedures for technical probe
6.2.4 Formulate schedules and required resources for technical probe <\/td>\n<\/tr>\n\n 18<\/td>\n 6.2.5 Specify how to monitor, measure, and control the effectiveness of technical probe
6.2.6 Document the product line technical probe plan <\/td>\n<\/tr>\n\n 19<\/td>\n 6.3 Technical probe enabling
6.3.1 Principal constituents <\/td>\n<\/tr>\n\n 20<\/td>\n 6.3.2 Establish governance policy for technical probe
6.3.3 Mobilize qualified human resources for technical probe
6.3.4 Identify infrastructure and resource needs for technical probe operationalization and support <\/td>\n<\/tr>\n\n 21<\/td>\n 6.3.5 Enable quality assurance measurement for technical probe
6.3.6 Improve technical probe process continuously <\/td>\n<\/tr>\n\n 22<\/td>\n 6.4 Technical probe managing
6.4.1 Principal constituents <\/td>\n<\/tr>\n\n 23<\/td>\n 6.4.2 Tailor and allocate governance policy, R & R, and resources to relevant sub functions of technical probe
6.4.3 Collect data from SSPL technical probe sub functions
6.4.4 Monitor, measure, and control technical probe operation and support <\/td>\n<\/tr>\n\n 24<\/td>\n 6.4.5 Manage actual operation and support of technical probe
6.4.6 Provide feedback to planning and enabling functions of technical probe <\/td>\n<\/tr>\n\n 25<\/td>\n 7 Product line technical probe operationalization
7.1 General
7.2 Technical probe preparation
7.2.1 Principal constituents <\/td>\n<\/tr>\n\n 26<\/td>\n 7.2.2 Review and refine the context of technical probe
7.2.3 Specify the phases of technical probe <\/td>\n<\/tr>\n\n 27<\/td>\n 7.2.4 Identify the organization\u2019s SSPL stakeholders
7.2.5 Analyse the organization\u2019s level of process maturity <\/td>\n<\/tr>\n\n 28<\/td>\n 7.2.6 Distribute and gather preliminary phase questionnaire
7.2.7 Analyse and document preliminary phase findings <\/td>\n<\/tr>\n\n 29<\/td>\n 7.3 Technical probe operation
7.3.1 Principal constituents
7.3.2 Perform technical probe interview with organization\u2019s SSPL stakeholders <\/td>\n<\/tr>\n\n 30<\/td>\n 7.3.3 Capture relevant data from the interview
7.3.4 Document the findings, strengths and weaknesses
7.3.5 Assess gaps between to-be and as-is
7.3.6 Provide recommendations <\/td>\n<\/tr>\n\n 31<\/td>\n 7.4 Product line value estimation
7.4.1 Principal constituents
7.4.2 Determine potential member products <\/td>\n<\/tr>\n\n 32<\/td>\n 7.4.3 Measure potential reusability and opportunity
7.4.4 Analyse the costs and benefits of a product line <\/td>\n<\/tr>\n\n 33<\/td>\n 7.4.5 Perform go\/no-go decision to a product line basis
7.4.6 Hand over product line value estimation results to scoping
7.5 Product line adoption scenarios structuring
7.5.1 Principal constituents <\/td>\n<\/tr>\n\n 34<\/td>\n 7.5.2 Coordinate the adoption strategy with the technical probe results
7.5.3 Structure product line adoption scenarios <\/td>\n<\/tr>\n\n 35<\/td>\n 7.5.4 Document a draft CONOPS
8 Product line technical probe support
8.1 General
8.2 Quality assurance for technical probe
8.2.1 Principal constituents <\/td>\n<\/tr>\n\n 36<\/td>\n 8.2.2 Objectively evaluate technical probe process <\/td>\n<\/tr>\n \n 37<\/td>\n 8.2.3 Objectively evaluate technical probe work products
8.2.4 Communicate and resolve noncompliance issues
8.2.5 Establish records of technical probe quality assurance activities <\/td>\n<\/tr>\n\n 38<\/td>\n 8.3 Decision support for technical probe
8.3.1 Principal constituents <\/td>\n<\/tr>\n\n 39<\/td>\n 8.3.2 Establish decision support policy for technical probe
8.3.3 Tailor decision procedure for technical probe <\/td>\n<\/tr>\n\n 40<\/td>\n 8.3.4 Guide the decision execution for technical probe
8.3.5 Document the rationale for decisions concerning technical probe <\/td>\n<\/tr>\n\n 41<\/td>\n 8.3.6 Learn from decision results of technical probe
8.4 Risk management for technical probe
8.4.1 Principal constituents <\/td>\n<\/tr>\n\n 42<\/td>\n 8.4.2 Identify risks related to the success of technical probe <\/td>\n<\/tr>\n \n 43<\/td>\n 8.4.3 Develop mitigation plans for the identified risks
8.4.4 Monitor the execution of the mitigation plan <\/td>\n<\/tr>\n\n 44<\/td>\n 8.4.5 Learn from actual results of risk management for technical probe <\/td>\n<\/tr>\n \n 45<\/td>\n Annex A (informative) Exemplar multi-criteria decision mechanism for technical probe <\/td>\n<\/tr>\n \n 47<\/td>\n Annex B (informative) Exemplar adoption scenario <\/td>\n<\/tr>\n \n 48<\/td>\n Annex C (informative) Exemplar frameworks of maturity and questionnaire <\/td>\n<\/tr>\n \n 49<\/td>\n Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" \n\n
\n Published By<\/td>\n Publication Date<\/td>\n Number of Pages<\/td>\n<\/tr>\n \n BSI<\/b><\/a><\/td>\n 2019<\/td>\n 50<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":347498,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2641],"product_tag":[],"class_list":{"0":"post-347489","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-bsi","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/347489","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/347498"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=347489"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=347489"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=347489"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}