{"id":379957,"date":"2024-10-20T03:04:46","date_gmt":"2024-10-20T03:04:46","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-53252021\/"},"modified":"2024-10-26T05:33:29","modified_gmt":"2024-10-26T05:33:29","slug":"bs-53252021","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-53252021\/","title":{"rendered":"BS 5325:2021"},"content":{"rendered":"
This British Standard gives recommendations for the installation of textile floor coverings in new or existing buildings. It covers the installation of all products composed of textile material with a pile or non\u2011pile use surface and includes the laying of modular carpet, e.g. tiles and planks. It details suitable methods of design and installation and advises on the selection of the materials required for their implementation.<\/p>\n
This British Standard does not include advice on cleaning and maintenance but does include guidance on the decisions made at the design stage which assist cleaning and maintenance and enable the installation to give satisfactory service.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
5<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | 1 Scope 2 Normative references <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 4 Exchange of information 4.1 General <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 4.2 Project 4.3 Contract conditions 4.4 Special attendance 4.5 Design (see also Clause 6) <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 4.6 Testing 4.7 Health and safety 4.8 Responsibilities 4.9 Maintenance 5 Materials (see also Clause 6) 5.1 Carpet underlays <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 5.2 Fabricated underlays <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 5.3 Interlays 5.4 In-situ underlays 5.5 Underlayments 5.6 Textile floor coverings <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 5.7 Adhesives 5.8 Skirtings and covings <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 5.9 Transition strips 6 Subfloors (see also Clause 5) 6.1 General 6.2 Damp proofing solid floors and eliminating construction moisture <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 6.3 Timber bases <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 6.4 Raised access flooring <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 6.5 Other bases 6.6 Fabricated underlays <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 6.7 Smoothing and\/or levelling compounds 6.8 Existing floor covering <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 6.9 Protection against heat 6.10 Fire hazard <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 7 Installation 7.1 General 7.2 Workmanship 7.3 Storage <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 7.4 Fabricated and other underlays <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 7.5 Interlays 7.6 Carpet underlays <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 7.7 Planning and layout <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 7.8 Textile floor coverings <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | Table 1 \u2014 Compatibility of textile floor covering type with method of installation <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 7.9 Installation in electrostatic discharge (ESD) protected areas (EPA) <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 7.10 Seaming <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 7.11 Stairs <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | Figure 1 \u2014 Recommended pile direction on stairs <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 7.12 Modular carpet <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | Figure 2 \u2014 Typical installation formats for carpet tiles <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | 7.13 Plasticizer migration (see also 7.8.2.3) <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | 7.14 Flocked floor coverings Figure 3 \u2014 Orientation of flocked floor coverings 8 Completion <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | Annex A (normative)\u2002 Underfloor heating <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | Annex B (normative)\u2002 Dampness testing \u2013 Hygrometer test for dampness of concrete, cementitious and anhydrite bases <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | Figure B.1 \u2014 Apparatus for hygrometer test (from BS 8203:2017, Figure B.1) <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | Annex C (normative)\u2002 Surface levels and regularity Table C.1 \u2014 Classification of surface regularity of direct finished base slab or levelling screed <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | Annex D (normative)\u2002 Recommendations for the selection and specification of suitable plywood for fabricated underlays <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Installation of textile floor coverings. Code of practice<\/b><\/p>\n |