{"id":389883,"date":"2024-10-20T03:52:03","date_gmt":"2024-10-20T03:52:03","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-13941-22019a12021\/"},"modified":"2024-10-26T07:06:36","modified_gmt":"2024-10-26T07:06:36","slug":"bs-en-13941-22019a12021","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-13941-22019a12021\/","title":{"rendered":"BS EN 13941-2:2019+A1:2021"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | undefined <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 6.3.1 General <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 10.2.1 Loading and unloading <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 10.2.2 Checking of the delivery 10.3.1 General 10.3.2 Storage of pipe assemblies <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 10.3.3 Storage of fitting and valve assemblies 10.3.4 Storage of joint casing systems and other materials <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 11.3.1 Welding of the steel service pipe and testing of the welds 11.3.1.1 General <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 11.3.1.2 Quality system for the different project classes <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 11.3.1.3 Welding procedures and the welding process 11.3.1.4 Welding consumables 11.3.1.5 Place and position of the weld <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 11.3.1.6 Performance of welding work <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 11.3.1.7 Special procedures <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 11.3.1.8 Documentation <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 11.5.1 General 11.5.2 Visual test with !overpressure” by air <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 11.5.3 Visual test below atmospheric pressure by air 11.5.4 Hydrostatic test 11.5.4.1 General 11.5.4.2 Safety <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 11.5.4.3 Procedures 11.5.4.4 Water as test medium <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 11.5.4.5 Acceptance criteria 11.5.4.6 Leak finding <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | 11.5.4.7 Testing equipment 11.5.4.8 Test documentation and records <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | 11.5.4.9 Disposal of test water 11.5.4.10 Protection following test 11.6.1 General 11.6.2 Joints 11.6.3 Site prepared components <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | 11.11.1 Wall penetrations 11.11.1.1 General 11.11.1.2 Sealing on the building side of the pipe entry 11.11.1.3 Sealing of the casing of the pipe assembly against the pipe entry <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | 11.11.2 Connections to other pipe systems 11.11.3 Pipe laying in protection tubes 11.11.4 Protection against external impact for above ground installations <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | 15.1.1 Range of application 15.1.2 Documentation \u2014 aims and uses <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | 15.1.3 Technical documentation 15.1.3.1 General 15.1.3.2 Project documentation <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | 15.1.3.3 Test and proof documentation 15.1.3.4 Checklists for technical documentation <\/td>\n<\/tr>\n | ||||||
56<\/td>\n | 15.1.4 Drawings of the technical documentation 15.1.4.1 General <\/td>\n<\/tr>\n | ||||||
58<\/td>\n | 15.1.4.2 Design plan <\/td>\n<\/tr>\n | ||||||
59<\/td>\n | 15.1.4.3 Detailed drawing 15.1.4.4 Pipeline sequence drawing and wiring diagram <\/td>\n<\/tr>\n | ||||||
60<\/td>\n | 15.1.5 As-built documentation <\/td>\n<\/tr>\n | ||||||
61<\/td>\n | Annex A (informative)Venting and Draining A.1 General A.2 Venting and draining devices <\/td>\n<\/tr>\n | ||||||
63<\/td>\n | A.3 Draining devices for large pipeline dimensions <\/td>\n<\/tr>\n | ||||||
64<\/td>\n | A.4 Venting of new pipe sections A.4.1 Venting by house connection pipeline <\/td>\n<\/tr>\n | ||||||
65<\/td>\n | A.4.2 Venting by venting cabinets <\/td>\n<\/tr>\n | ||||||
67<\/td>\n | Annex B (informative)Recommendations for HDD B.1 General B.2 Depth under roads <\/td>\n<\/tr>\n | ||||||
68<\/td>\n | B.3 Minimum intermediate distances B.4 Casing and casing field joints B.5 Drilling fluid composition B.6 Drilling fluid pressures <\/td>\n<\/tr>\n | ||||||
69<\/td>\n | B.7 Borehole dimensions and borehole stability B.8 Ballasting <\/td>\n<\/tr>\n | ||||||
70<\/td>\n | B.9 Installation of pipe bundles B.10 Determination of position and route corrections <\/td>\n<\/tr>\n | ||||||
71<\/td>\n | B.11 Registration and control of HDD B.12 Drilling Tolerances <\/td>\n<\/tr>\n | ||||||
72<\/td>\n | B.13 Verification of design and methodology for the pullback operation B.14 As-Built information <\/td>\n<\/tr>\n | ||||||
73<\/td>\n | Annex C (informative)Qualification of fitters installing joints in pre-insulated bonded pipe networks C.1 Knowledge and skills C.2 Background for training and testing C.3 Subjects for training and testing C.3.1 General <\/td>\n<\/tr>\n | ||||||
74<\/td>\n | C.3.2 Casing of polyethylene (PE) C.3.2.1 Important construction characteristics and properties C.3.2.2 Technological behaviour of PE C.3.2.3 Mechanical properties of PE <\/td>\n<\/tr>\n | ||||||
75<\/td>\n | C.3.2.4 Conditions for casing elements under load C.3.3 Surveillance C.3.4 PUR-foam system C.3.4.1 PUR-foam as a two component material C.3.4.2 Insulation procedures on job site <\/td>\n<\/tr>\n | ||||||
76<\/td>\n | C.3.5 Joint types\/jointing systems C.3.5.1 General C.3.5.2 Shrink sleeve joint with mastic\/adhesive sealing C.3.5.3 Welded joints\/systems <\/td>\n<\/tr>\n | ||||||
77<\/td>\n | C.3.6 Installation of joints C.3.6.1 General C.3.6.2 Installation of surveillance system <\/td>\n<\/tr>\n | ||||||
78<\/td>\n | C.3.6.3 Sealed joints <\/td>\n<\/tr>\n | ||||||
79<\/td>\n | C.3.6.4 Welded joints C.3.6.5 Insulation of joints <\/td>\n<\/tr>\n | ||||||
80<\/td>\n | C.3.6.6 Documentation <\/td>\n<\/tr>\n | ||||||
81<\/td>\n | Annex D (informative)Quality control program and documentation <\/td>\n<\/tr>\n | ||||||
94<\/td>\n | Annex E (normative)Commissioning E.1 Commissioning E.1.1 General <\/td>\n<\/tr>\n | ||||||
95<\/td>\n | E.1.2 Filling with water for initial operation E.1.3 Surveillance system <\/td>\n<\/tr>\n | ||||||
96<\/td>\n | Annex F (informative)Operation <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" District heating pipes. Design and installation of thermal insulated bonded single and twin pipe systems for directly buried hot water networks – Installation<\/b><\/p>\n |