{"id":390387,"date":"2024-10-20T03:54:29","date_gmt":"2024-10-20T03:54:29","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-174632021-2\/"},"modified":"2024-10-26T07:12:10","modified_gmt":"2024-10-26T07:12:10","slug":"bs-en-174632021-2","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-174632021-2\/","title":{"rendered":"BS EN 17463:2021"},"content":{"rendered":"

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
2<\/td>\nundefined <\/td>\n<\/tr>\n
11<\/td>\n1 Scope
2 Normative references
3 Terms and definitions <\/td>\n<\/tr>\n
14<\/td>\n4 Symbols, abbreviations and subscripts <\/td>\n<\/tr>\n
15<\/td>\n5 Valuation procedure <\/td>\n<\/tr>\n
17<\/td>\n6 Setting up a model (phase A)
6.1 Determination and qualitative description of benefits and efforts <\/td>\n<\/tr>\n
18<\/td>\n6.2 Quantification of the benefits and efforts <\/td>\n<\/tr>\n
19<\/td>\n6.3 Monetisation, determination of the relevant points in time, consideration of price variations and of degradation
6.3.1 General <\/td>\n<\/tr>\n
20<\/td>\n6.3.2 Consideration of price variation effects
6.3.3 Consideration of degradation <\/td>\n<\/tr>\n
22<\/td>\n6.4 Number of periods to be considered
6.5 Consideration of risk
6.6 Determination of the appropriate discount rate <\/td>\n<\/tr>\n
23<\/td>\n7 Calculation (phase B)
7.1 Determination of the NPV of the ERI (most-likely-case scenario)
7.1.1 General <\/td>\n<\/tr>\n
25<\/td>\n7.1.2 Consideration of tax
7.2 Performing a sensitivity analysis under variation of all parameters containing considerable uncertainty <\/td>\n<\/tr>\n
27<\/td>\n7.3 Performing a scenario analysis (best-case, worst-case, and most-likely-case scenario) <\/td>\n<\/tr>\n
28<\/td>\n8 Assessment (phase C)
8.1 Interpretation of the results
8.1.1 General
8.1.2 Net Present Value (NPV) <\/td>\n<\/tr>\n
29<\/td>\n8.1.3 Scenario and sensitivity analyses
8.2 Valuation of non-monetisable qualitative and quantitative effects on the decision
9 Reporting (phase D) <\/td>\n<\/tr>\n
32<\/td>\nAnnex A (informative)The NPV calculation table (basic version) with visible formulas <\/td>\n<\/tr>\n
33<\/td>\nAnnex B (informative)Comprehensive version of the NPV calculation table <\/td>\n<\/tr>\n
37<\/td>\nAnnex C (informative)Selection of the appropriate valuation method
C.1 Objective
C.2 Introduction
C.3 Differentiation between those methods that consider the time value of money and others that don\u2019t <\/td>\n<\/tr>\n
39<\/td>\nC.4 Limitations of the Internal Rate of Return method (IRR) <\/td>\n<\/tr>\n
41<\/td>\nC.5 Limitations of the Discounted Payback Period method (DPB or DPP) <\/td>\n<\/tr>\n
44<\/td>\nC.6 Summary <\/td>\n<\/tr>\n
45<\/td>\nAnnex D (informative)Case study: Application of the valuation procedure to the integration of a cogeneration unit within an industrial organization
D.1 General
D.2 Determination and qualitative description of all direct and indirect effects <\/td>\n<\/tr>\n
46<\/td>\nD.3 Quantification of the benefits and efforts <\/td>\n<\/tr>\n
48<\/td>\nD.4 Monetisation, determination of the relevant points in time, consideration of price variations and of degradation <\/td>\n<\/tr>\n
49<\/td>\nD.5 Number of periods to be considered
D.6 Determination of the appropriate discount rate
D.7 Consideration of risk <\/td>\n<\/tr>\n
50<\/td>\nD.8 Determination of the value added by the ERI (most-likely-case scenario) <\/td>\n<\/tr>\n
51<\/td>\nD.9 Performing sensitivity analysis under variation of all parameters containing considerable uncertainty <\/td>\n<\/tr>\n
53<\/td>\nD.10 Performing scenario analysis (best-case and worst-case scenario)
D.11 Interpretation of the results
D.12 Transparent and comprehensible presentation of the calculation and the results with consideration of not quantified and not monetised effects <\/td>\n<\/tr>\n
55<\/td>\nAnnex E (informative)Checklist for the Valuation Report <\/td>\n<\/tr>\n
57<\/td>\nAnnex F (informative)Consideration of risk <\/td>\n<\/tr>\n
60<\/td>\nAnnex G (informative)Consideration of price variation <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Valuation of Energy Related Investments (VALERI)<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2022<\/td>\n62<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":390396,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[83,2641],"product_tag":[],"class_list":{"0":"post-390387","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-03-100-01","7":"product_cat-bsi","9":"first","10":"instock","11":"sold-individually","12":"shipping-taxable","13":"purchasable","14":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/390387","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/390396"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=390387"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=390387"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=390387"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}