{"id":397977,"date":"2024-10-20T04:33:12","date_gmt":"2024-10-20T04:33:12","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-c57-32-2015\/"},"modified":"2024-10-26T08:21:28","modified_gmt":"2024-10-26T08:21:28","slug":"ieee-c57-32-2015","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-c57-32-2015\/","title":{"rendered":"IEEE C57.32-2015"},"content":{"rendered":"
Revision Standard – Active. This standard applies to devices used for the purpose of controlling the ground current or the potentials to ground of an alternating current system. These devices are: grounding transformers, ground-fault neutralizers, resistors, reactors, or combinations of these.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | IEEE Std C57.32-2015 Front Cover <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | Title page <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | Important Notices and Disclaimers Concerning IEEE Standards Documents <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Participants <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | Important Notice 1. Overview 1.1 Scope 1.2 General considerations <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 2. Normative references <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 3. Definitions <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 4. Grounding reactors 4.1 General description 4.2 Safety <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 4.3 Clearances: electrical, ventilation, and magnetic 4.4 Mechanical considerations <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 4.5 Concrete foundation and mounting 4.6 Service conditions 4.7 Basis for rating 4.7.1 Conditions 4.7.2 Rated current 4.7.2.1 Rated thermal current <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 4.7.2.2 Short-circuit current\u2014asymmetrical <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 4.7.2.3 Maximum mechanical stress of neutral grounding reactors for short-circuit conditions <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 4.7.3 Rated voltage 4.7.4 Rated frequency 4.7.5 Rated time 4.8 Insulation levels 4.8.1 Insulation classes <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 4.8.2 Impulse insulation levels 4.9 Limiting temperature rises 4.9.1 Temperature limitations at rated continuous current <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 4.9.2 Temperature limitations under short-circuit conditions 4.10 Routine, design, and other tests for neutral grounding reactors <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 4.11 Dielectric tests 4.11.1 Turn-to-turn overvoltage test 4.11.2 Impulse tests 4.11.3 Power frequency withstand voltage test 4.12 Temperature rise test <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 4.13 Impedance and losses test 4.14 DC resistance test 4.15 Seismic verification 4.16 Short-circuit test <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 4.17 Nameplates 5. Ground-fault neutralizers (arc-suppression reactors) 5.1 General <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 5.2 Service conditions 5.3 Design 5.4 Bushings, insulators, and insulating liquids 5.5 Nameplates <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 5.6 Tanks and enclosures 5.7 Ratings 5.7.1 Rated voltage <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 5.7.2 Maximum continuous voltage 5.7.3 Rated thermal current 5.7.4 Rated thermal current duration 5.7.5 Rated continuous current <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 5.7.6 Adjustment range 5.7.7 Auxiliary winding 5.7.8 Secondary winding 5.7.9 Linearity of the ground fault neutralizer 5.8 Temperature limitations 5.8.1 Limits <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 5.9 Insulation levels 5.10 Temperature rise <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 5.11 Routine, design, and other tests for ground-fault neutralizers 5.12 Dielectric tests <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 5.12.1 Impulse tests 5.12.2 Applied voltage tests 5.12.3 Low-frequency withstand tests 5.13 Measurement of current at rated voltage <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 5.14 Measurement of no-load voltage of the auxiliary and secondary windings 5.15 Temperature rise test 5.16 Measurement of loss 5.17 Measurement of linearity <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 5.18 Measurement of acoustic sound level 5.19 Endurance tests of the inductance regulation mechanism 6. Grounding transformers 6.1 General description 6.2 Service conditions 6.2.1 Usual temperature and altitude service conditions <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 6.2.2 Temperature 6.2.3 Altitude 6.3 Unusual service conditions 6.3.1 Operation at altitudes in excess of 1000 m (3300 ft) 6.3.2 Insulation <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 6.3.3 Operation at rated current 6.3.4 Other unusual service conditions <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 6.4 Basis for rating 6.4.1 Conditions 6.4.2 Rated current 6.4.2.1 Rated thermal current <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | 6.4.2.2 Short-circuit current\u2014asymmetrical <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | 6.4.2.3 Rated continuous neutral current 6.4.3 Rated voltage <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | 6.4.4 Rated frequency 6.4.5 Rated time 6.4.6 Impedance 6.5 Insulation classes and dielectric withstand levels 6.5.1 Basic impulse insulation levels and insulation classes <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | 6.5.2 Protective devices 6.6 Temperature limitations 6.6.1 Limits <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | 6.6.2 Steady-state temperature rises 6.6.3 Rated-time temperature rises 6.6.3.1 Ten-second and one-minute ratings <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | 6.6.3.2 Ten-minute ratings 6.6.3.3 Extended-time ratings 6.6.4 Thermal short-time capability calculations for grounding transformers <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | 6.7 Tests 6.7.1 Routine, design, and other tests for grounding transformers <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | 6.7.1.1 Routine tests 6.7.1.2 Design tests 6.7.1.3 Other tests 6.7.2 Test sequence <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | 6.7.3 Dielectric tests <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | 6.8 Construction 6.8.1 Bushings, insulators, and liquid 6.8.2 Nameplates <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | 6.8.3 Tanks and enclosures 7. Grounding resistors 7.1 Resistor element 7.1.1 Conductor connections 7.2 Rated voltage <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | 7.3 Temperature coefficient of resistance 7.4 Mechanical considerations 7.5 Insulation levels 7.6 Routine, design, and other tests for neutral grounding resistors <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | 7.7 Temperature rise test <\/td>\n<\/tr>\n | ||||||
54<\/td>\n | 7.8 Resistance test 7.9 Dielectric tests 7.9.1 Impulse tests <\/td>\n<\/tr>\n | ||||||
55<\/td>\n | 7.9.2 Applied-voltage tests 7.9.3 Low-frequency withstand tests 7.9.4 Thermal capability calculation for neutral grounding resistors 7.9.4.1 Equations for temperature rise and current density, when current is constant <\/td>\n<\/tr>\n | ||||||
56<\/td>\n | 7.9.4.2 Equations for temperature rise and current density, when voltage is constant <\/td>\n<\/tr>\n | ||||||
57<\/td>\n | 8. Combination devices 8.1 Insulation levels 8.2 Routine, design and other tests for combination grounding devices 8.3 Dielectric tests 8.3.1 Impulse tests 8.3.2 Applied-voltage tests <\/td>\n<\/tr>\n | ||||||
58<\/td>\n | 8.3.3 Low-frequency withstand tests <\/td>\n<\/tr>\n | ||||||
59<\/td>\n | Annex A (informative) Test code <\/td>\n<\/tr>\n | ||||||
80<\/td>\n | Annex B (informative) Bibliography <\/td>\n<\/tr>\n | ||||||
83<\/td>\n | Back Cover <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Standard for Requirements, Terminology, and Test Procedures for Neutral Grounding Devices<\/b><\/p>\n |