{"id":398831,"date":"2024-10-20T04:38:54","date_gmt":"2024-10-20T04:38:54","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-1865-2-2019\/"},"modified":"2024-10-26T08:26:33","modified_gmt":"2024-10-26T08:26:33","slug":"ieee-1865-2-2019","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-1865-2-2019\/","title":{"rendered":"IEEE 1865.2-2019"},"content":{"rendered":"
New IEEE Standard – Active. The basic principles, items, methods, performance indicators, and acceptance requirements for the maintenance and testing of the distributed control systems (DCSs) of thermal power plants are specified. This standard is mainly applicable to the maintenance and testing of DCSs of conventional thermal power plants in commercial operation.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | IEEE Std 1865.2\u2122-2019 Front cover <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | Title page <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | Important Notices and Disclaimers Concerning IEEE Standards Documents <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Participants <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | 1.\u2002Overview 1.1\u2002Scope 1.2\u2002Purpose 1.3\u2002Word usage <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 2.\u2002Normative references 3.\u2002Definitions, acronyms, and abbreviations 3.1\u2002Definitions <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 4.\u2002General requirements 4.1\u2002Operation service 4.2\u2002Management rules and procedures <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 4.3\u2002Data and records 4.4\u2002Process safety control <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 5.\u2002Routine maintenance 5.1\u2002Basic requirements 5.2\u2002Routine inspection <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 5.3\u2002Defects and troubleshooting <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 5.4\u2002Modification of settings and configuration <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 6.\u2002Scheduled maintenance 6.1\u2002Basic requirements 6.2\u2002Scheduled maintenance of hardware and software systems <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | 6.3\u2002System safety maintenance <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | 6.4\u2002Shutdown of DCS <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | 6.5\u2002Upgrade and modification of DCS <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | 7.\u2002Technical management of DCS 7.1\u2002Introduction 7.2\u2002Basic requirements 7.3\u2002Management of parameter settings <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | 7.4\u2002Performance management <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | 7.5\u2002Security management <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | 7.6\u2002Management of emergency response to faults <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | 7.7\u2002Risk management 7.8\u2002Development and management of materials plan <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | 7.9\u2002Spare parts management 7.10\u2002Management of technical data <\/td>\n<\/tr>\n | ||||||
56<\/td>\n | 7.11\u2002Outsourcing management 8.\u2002Technical assessment of reliability 8.1\u2002Introduction 8.2\u2002Basic requirements <\/td>\n<\/tr>\n | ||||||
58<\/td>\n | 8.3\u2002Assessment contents <\/td>\n<\/tr>\n | ||||||
66<\/td>\n | 8.4\u2002Settlement of assessment <\/td>\n<\/tr>\n | ||||||
68<\/td>\n | Annex\u00a0A (informative) Dynamic and steady-state performance specification for modulation control system (MCS) <\/td>\n<\/tr>\n | ||||||
69<\/td>\n | Annex\u00a0B (informative) Distributed control system (DCS) inspection form examples <\/td>\n<\/tr>\n | ||||||
81<\/td>\n | Annex\u00a0C (informative) Modification and setting form examples <\/td>\n<\/tr>\n | ||||||
83<\/td>\n | Annex\u00a0D (informative) Modulation control system assessment methods D.1\u2002Assessment of coordinated control system <\/td>\n<\/tr>\n | ||||||
84<\/td>\n | D.2\u2002Assessment of feed-water control system (drum boiler) <\/td>\n<\/tr>\n | ||||||
86<\/td>\n | D.3\u2002Assessment of feed-water control system (once-through boiler) <\/td>\n<\/tr>\n | ||||||
87<\/td>\n | D.4\u2002Evaluation of main steam temperature control system <\/td>\n<\/tr>\n | ||||||
89<\/td>\n | D.5\u2002Assessment of reheat steam temperature control system <\/td>\n<\/tr>\n | ||||||
90<\/td>\n | D.6\u2002Assessment of furnace pressure control system <\/td>\n<\/tr>\n | ||||||
91<\/td>\n | D.7\u2002Assessment of air flow and oxygen control system <\/td>\n<\/tr>\n | ||||||
92<\/td>\n | D.8\u2002Assessment of primary air pressure control system <\/td>\n<\/tr>\n | ||||||
93<\/td>\n | D.9\u2002Assessment of coal mill outlet temperature control system <\/td>\n<\/tr>\n | ||||||
94<\/td>\n | D.10\u2002Assessment of deaerator pressure control system <\/td>\n<\/tr>\n | ||||||
95<\/td>\n | D.11\u2002Assessment of deaerator level control system <\/td>\n<\/tr>\n | ||||||
96<\/td>\n | D.12\u2002Assessment of condenser level control system D.13\u2002Assessment of heater level control system <\/td>\n<\/tr>\n | ||||||
97<\/td>\n | D.14\u2002Assessment of digital electro-hydraulic (DEH) speed control system <\/td>\n<\/tr>\n | ||||||
99<\/td>\n | D.15\u2002Assessment of DEH load control system <\/td>\n<\/tr>\n | ||||||
101<\/td>\n | Annex\u00a0E (informative) Bibliography <\/td>\n<\/tr>\n | ||||||
102<\/td>\n | Back cover <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Standard Specifications for Maintenance and Test of Distributed Control Systems in Thermal Power Stations: Operation Service and Management<\/b><\/p>\n |