{"id":403381,"date":"2024-10-20T05:05:51","date_gmt":"2024-10-20T05:05:51","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-pd-iso-ts-128352022-tc\/"},"modified":"2024-10-26T09:05:08","modified_gmt":"2024-10-26T09:05:08","slug":"bsi-pd-iso-ts-128352022-tc","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-pd-iso-ts-128352022-tc\/","title":{"rendered":"BSI PD ISO\/TS 12835:2022 – TC"},"content":{"rendered":"

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
246<\/td>\nundefined <\/td>\n<\/tr>\n
252<\/td>\nForeword <\/td>\n<\/tr>\n
253<\/td>\nIntroduction <\/td>\n<\/tr>\n
255<\/td>\n1 Scope
2 Normative references
3 Terms and definitions <\/td>\n<\/tr>\n
259<\/td>\n4 Abbreviated terms and symbols
4.1 Abbreviated terms <\/td>\n<\/tr>\n
260<\/td>\n4.2 Symbols <\/td>\n<\/tr>\n
261<\/td>\n5 Program overview
5.1 Illustrations of selected definitions
5.2 Program flowchart <\/td>\n<\/tr>\n
262<\/td>\n6 Overview and fundamental assumptions
6.1 General
6.2 Main features
6.2.1 Purpose <\/td>\n<\/tr>\n
263<\/td>\n6.2.2 Applicability to service conditions
6.2.3 Rationale for development
6.2.4 Subject of evaluation
6.2.5 Application severity levels <\/td>\n<\/tr>\n
264<\/td>\n6.3 Assessment philosophy and principles
6.3.1 Fundamental principles <\/td>\n<\/tr>\n
265<\/td>\n6.3.2 Conservative evaluation procedure
6.3.3 Mandatory and optional tasks <\/td>\n<\/tr>\n
266<\/td>\n6.3.4 Use of analysis and physical testing
6.3.5 Performance measures
6.3.6 Assessment criteria <\/td>\n<\/tr>\n
267<\/td>\n6.3.7 Task outcomes \u2014 data categories
6.3.8 Prior evaluation data
6.3.9 Treatment of confidential design information <\/td>\n<\/tr>\n
268<\/td>\n6.3.10 Interpretation of evaluation results
6.3.11 Avoiding perception of conflict of interest
6.4 Evaluation variables
6.4.1 Connection loading
6.4.2 Impacts of contributing variables <\/td>\n<\/tr>\n
270<\/td>\n6.4.3 Pin-box interferences and tapers
6.4.4 Material yield strength <\/td>\n<\/tr>\n
271<\/td>\n6.5 Evaluation procedure
6.5.1 Safety standards
6.5.2 Seepage assessment \u2014 random variations
6.5.3 Seepage rate thresholds <\/td>\n<\/tr>\n
272<\/td>\n6.5.4 Seal isolation
6.5.5 Dope entrapment
6.5.6 Thermal cycle test \u2014 bake-out and hold durations <\/td>\n<\/tr>\n
273<\/td>\n6.5.7 Pressure and temperature loading in thermal cycle test and analysis
6.5.8 Dependence of material strength on temperature <\/td>\n<\/tr>\n
274<\/td>\n6.6 Scope of reporting
7 Program roles and proprietary design information
7.1 Program execution roles
7.2 Proprietary connection design information <\/td>\n<\/tr>\n
275<\/td>\n8 Conformance requirements
8.1 Conformant evaluation program
8.2 Program non-conformances <\/td>\n<\/tr>\n
276<\/td>\n8.3 Performance acceptance
8.4 Conformance of results from previous evaluations
8.5 Use of data from previous evaluations <\/td>\n<\/tr>\n
277<\/td>\n8.6 Conformance to lower ASLs
9 Application severity levels
9.1 Thermal well load path <\/td>\n<\/tr>\n
279<\/td>\n9.2 Temperature as controlling parameter <\/td>\n<\/tr>\n
280<\/td>\n9.3 Specifications for application severity levels <\/td>\n<\/tr>\n
281<\/td>\n9.4 Selection of application severity level
10 Program blocks and tasks
10.1 Evaluation procedure overview <\/td>\n<\/tr>\n
285<\/td>\n10.2 Critical path tasks <\/td>\n<\/tr>\n
286<\/td>\n11 Program specifications
11.1 Task overview
11.2 Identification of program roles <\/td>\n<\/tr>\n
287<\/td>\n11.3 Identification of candidate connection <\/td>\n<\/tr>\n
288<\/td>\n11.4 Program options <\/td>\n<\/tr>\n
289<\/td>\n11.5 Data from prior evaluations
12 Determination of biased test population
12.1 Task overview <\/td>\n<\/tr>\n
290<\/td>\n12.2 Initial material property characterization
12.2.1 Task description, definitions, methods <\/td>\n<\/tr>\n
291<\/td>\n12.2.2 Testing conditions and scope <\/td>\n<\/tr>\n
293<\/td>\n12.2.3 Procedure for tensile tests <\/td>\n<\/tr>\n
294<\/td>\n12.2.4 Interpretation and processing of tensile test results <\/td>\n<\/tr>\n
299<\/td>\n12.3 Specimen configuration analysis
12.3.1 Task description <\/td>\n<\/tr>\n
300<\/td>\n12.3.2 Modelling and reporting requirements <\/td>\n<\/tr>\n
301<\/td>\n12.3.3 Nominal reference case <\/td>\n<\/tr>\n
302<\/td>\n12.3.4 Worst-case geometry configurations <\/td>\n<\/tr>\n
304<\/td>\n12.3.5 Seal taper analysis <\/td>\n<\/tr>\n
305<\/td>\n12.3.6 Impacts of material property variations <\/td>\n<\/tr>\n
308<\/td>\n12.3.7 Make-up torque for sealability tests <\/td>\n<\/tr>\n
310<\/td>\n12.3.8 Test versus production specimens
13 Specimen procurement
13.1 Task overview <\/td>\n<\/tr>\n
311<\/td>\n13.2 Specimen pipe procurement
13.3 Material property verification
13.3.1 Task description
13.3.2 Specimens for tensile verification tests <\/td>\n<\/tr>\n
312<\/td>\n13.3.3 Scope of tensile verification tests <\/td>\n<\/tr>\n
313<\/td>\n13.3.4 Coefficient of thermal expansion verification test <\/td>\n<\/tr>\n
314<\/td>\n13.4 Test specimen machining and gauging
13.4.1 General requirements
13.4.2 Specimen naming convention <\/td>\n<\/tr>\n
315<\/td>\n13.4.3 Specimen length and length-reference requirements <\/td>\n<\/tr>\n
316<\/td>\n13.4.4 Geometrical configurations
13.4.5 Mother pipe for specimens <\/td>\n<\/tr>\n
317<\/td>\n13.4.6 Specimen machining tolerances <\/td>\n<\/tr>\n
319<\/td>\n13.5 Markings
13.6 Specimen geometry verification
13.6.1 Gauging inspection scope <\/td>\n<\/tr>\n
320<\/td>\n13.6.2 Inspection extent \u2013 example cases
13.6.3 Geometry inspection guidelines <\/td>\n<\/tr>\n
321<\/td>\n13.7 Procurement and quality control of connection interfacial components
13.8 Specimen handling and storage
13.8.1 Handling recommendations <\/td>\n<\/tr>\n
322<\/td>\n13.8.2 Treatment of damaged specimens
14 Full-scale physical tests and supplementary analyses
14.1 Task overview <\/td>\n<\/tr>\n
323<\/td>\n14.2 Full-scale tests – general requirements
14.2.1 Ambient temperature at test site
14.2.2 Calibration of instrumentation <\/td>\n<\/tr>\n
324<\/td>\n14.2.3 Disabling of secondary seals
14.2.4 Seepage measurement and rate definitions <\/td>\n<\/tr>\n
326<\/td>\n14.2.5 Load application rates
14.2.6 Excluded connections <\/td>\n<\/tr>\n
327<\/td>\n14.3 Galling resistance test
14.3.1 Task description <\/td>\n<\/tr>\n
328<\/td>\n14.3.2 Rationale and objectives
14.3.3 Make-break specimens
14.3.4 Scope of galling resistance test <\/td>\n<\/tr>\n
329<\/td>\n14.3.5 Set-up and instrumentation <\/td>\n<\/tr>\n
330<\/td>\n14.3.6 Test procedure <\/td>\n<\/tr>\n
331<\/td>\n14.3.7 Performance assessment <\/td>\n<\/tr>\n
332<\/td>\n14.3.8 Reporting
14.4 Thermal cycle test
14.4.1 Task description
14.4.2 Rationale and objectives <\/td>\n<\/tr>\n
333<\/td>\n14.4.3 Thermal cycle specimens
14.4.4 Scope of thermal cycle test <\/td>\n<\/tr>\n
336<\/td>\n14.4.5 Mechanical strain compensations <\/td>\n<\/tr>\n
339<\/td>\n14.4.6 Set-up and instrumentation <\/td>\n<\/tr>\n
345<\/td>\n14.4.7 Test procedure <\/td>\n<\/tr>\n
350<\/td>\n14.4.8 Performance assessment <\/td>\n<\/tr>\n
351<\/td>\n14.4.9 Selection of cycled specimens for bend test and limit-strain test
14.4.10 Reporting
14.5 Bending evaluation <\/td>\n<\/tr>\n
352<\/td>\n14.6 Limit-strain test
14.6.1 Task description
14.6.2 Rationale and objectives <\/td>\n<\/tr>\n
353<\/td>\n14.6.3 Limit-strain specimens
14.6.4 Mandatory test description <\/td>\n<\/tr>\n
355<\/td>\n14.6.5 Set-up and instrumentation <\/td>\n<\/tr>\n
357<\/td>\n14.6.6 Mandatory test procedure <\/td>\n<\/tr>\n
362<\/td>\n14.6.7 Performance assessment
14.6.8 Reporting
14.7 As-tested configuration analysis
15 Evaluation and inspection reports
15.1 Reporting deliverables <\/td>\n<\/tr>\n
363<\/td>\n15.2 Reporting scope and contents <\/td>\n<\/tr>\n
367<\/td>\n15.3 Reporting templates <\/td>\n<\/tr>\n
368<\/td>\nAnnex A (informative) FEA modelling guidelines <\/td>\n<\/tr>\n
378<\/td>\nAnnex B (informative) Derivations of formulae – Strain compensation factors <\/td>\n<\/tr>\n
387<\/td>\nAnnex C (informative) Program role assignments and responsibilities <\/td>\n<\/tr>\n
394<\/td>\nAnnex D (informative) Optional program selections, tasks, and procedures <\/td>\n<\/tr>\n
417<\/td>\nBibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Tracked Changes. Qualification of casing connections for thermal wells<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2022<\/td>\n418<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":403388,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2641],"product_tag":[],"class_list":{"0":"post-403381","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-bsi","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/403381","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/403388"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=403381"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=403381"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=403381"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}