{"id":409539,"date":"2024-10-20T05:36:02","date_gmt":"2024-10-20T05:36:02","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-pd-iec-ts-61850-1-22020a12022\/"},"modified":"2024-10-26T10:16:34","modified_gmt":"2024-10-26T10:16:34","slug":"bsi-pd-iec-ts-61850-1-22020a12022","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-pd-iec-ts-61850-1-22020a12022\/","title":{"rendered":"BSI PD IEC TS 61850-1-2:2020+A1:2022"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | undefined <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | Blank Page <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | CONTENTS <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | FOREWORD <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 1 Scope <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 2 Normative References <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 3 Terms and definitions <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | Blank Page <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 4 Key principles reminder 4.1 General 4.2 Namespace introduction 4.2.1 General <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 4.2.2 Basic namespaces <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 5 Main cases of extensions of IEC 61850 5.1 Namespace extensions and associated rules 5.1.1 General 5.1.2 Domain namespaces 5.1.3 Product standard namespaces 5.1.4 Transitional namespaces <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 5.1.5 Private namespaces 5.2 IEC 61850 profiles for domains 5.3 Mapping of IEC 61850 data model to other protocols at CDC level 6 What to extend in relation with IEC 61850? 6.1 List of basic requirements 6.1.1 General 6.1.2 IEC 61850 structure reminder <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | Figures Figure 1 \u2013 IEC 61850 documentation structure <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 6.1.4 Intellectual property requirements Tables Table 1 \u2013 Typical deliverables attached to IEC 61850 extensions <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 6.1.5 Editorial Recommendations 6.1.6 Data Model extension requirements <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | Blank Page <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | Blank Page <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | Table 2 \u2013 Normative information related to a namespace(for example for IEC61850\u20117\u2011420:2009A release 5) Table 3 \u2013 Informative information related to a namespace(for example for IEC61850\u20117\u2011420:2009A release 5) <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | Table 4 \u2013 Classification of Abbreviations in regardsof their contribution to form a DO Name (examples) <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | Table 5 \u2013 Semantic description frame and requirements <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 6.1.7 XML namespace extensions <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | Blank Page <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 6.1.8 Cyber-security requirements 6.1.9 Conformance Testing requirements 6.1.10 Maintenance of standard extension document <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | Figure 3 \u2013 Handling versioning information for official IEC publication <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | Figure 4 \u2013 Handling versioning information during the internal IEC writing process <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | Figure 5 \u2013 Example of tissue fix sequence and its impact on versioning information <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | Blank Page <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 6.1.11 Backward compatibility treatment Table 6 \u2013 Typical compatibility assessment Table 7 \u2013 Typical compatibility assessment and associated compatibility rules \u2013 detailed discussion <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | Table 8 \u2013 Typical compatibility table <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | 6.2 List of IEC 61850 flexibilities 6.2.1 General 6.2.2 Data Model flexibilities <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | 6.2.3 Communication services 6.2.4 SCL language <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | 6.3 Allowed flexibilities per extension cases Table 9 \u2013 Allowed flexibilities per extension cases <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | 7 The main activities for extending IEC 61850 7.1 Typical activities applying to all types of extension 7.1.1 General Figure 6 \u2013 Activities related to IEC 61850 extensions <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | 7.1.2 List the main use cases for extending IEC 61850 -> deliverable P1 7.1.3 Ensure knowledge of the existing IEC 61850 content 7.1.4 Identify possible IEC 61850 gaps 7.1.5 Build-up IEC 61850 extensions 7.1.6 Maintain IEC 61850 extensions 7.2 Define a standard namespace (product, domain or transitional) \u2013 if needed -> deliverable P2a or P2b 7.2.1 General <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | 7.2.2 Get a model manager nominated 7.2.3 Get the proposed model reviewed 7.2.4 Publish a namespace extension <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | 7.3 Define “standard” profile(s) \u2013 if needed \u2013> deliverable P3 (and P4) 7.3.1 General 7.3.2 Define interoperability objectives 7.3.3 Publish profile(s) -> deliverable P3 7.3.4 Publish profile(s) testing -> deliverable P4 <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | Annex A (informative)IEC 61850 roadmap (example) <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | Figure A.1 \u2013 Example of IEC 61850 roadmap <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Communication networks and systems for power utility automation – Guideline on extending IEC 61850<\/b><\/p>\n |