{"id":418123,"date":"2024-10-20T06:19:29","date_gmt":"2024-10-20T06:19:29","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-iso-14644-42022\/"},"modified":"2024-10-26T11:47:54","modified_gmt":"2024-10-26T11:47:54","slug":"bs-en-iso-14644-42022","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-iso-14644-42022\/","title":{"rendered":"BS EN ISO 14644-4:2022"},"content":{"rendered":"

This document specifies the process for creating a cleanroom from requirements through to its design, construction and start-up. It applies to new, refurbished and modified cleanroom installations. It does not prescribe specific technological or contractual means of achieving these requirements. It is intended for use by users, specifiers, designers, purchasers, suppliers, builders and performance verifiers of cleanroom installations. The primary cleanliness consideration is airborne particle concentration. Detailed checklists are provided for the requirements, design, construction and start-up, which include important performance parameters to be considered. Energy management design approaches are identified to support an energy-efficient cleanroom design. Construction guidance is provided, including requirements for start-up and verification. A basic element of this document is consideration of aspects, including maintenance, that will help to ensure continued satisfactory operation for the entire life cycle of the cleanroom. NOTE       Further guidance is given in Annexes A to D. ISO 14644-1, ISO 14644-2, ISO 14644-8, ISO 14644-9, ISO 14644-10, ISO 14644-12 and ISO 14644-17 provide complementary information. ISO 14644-7 offers guidance on design, construction and requirements for separative devices (clean air hoods, glove boxes, isolators and mini-environments). The following subjects are mentioned but not addressed in this document: \u2014    specific operational activities, processes to be accommodated and process equipment in the cleanroom installation; \u2014    fire and safety regulations; \u2014    ongoing operation, cleaning and maintenance activities, which are covered by ISO 14644-5.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
2<\/td>\nundefined <\/td>\n<\/tr>\n
4<\/td>\nEuropean foreword
Endorsement notice <\/td>\n<\/tr>\n
6<\/td>\nForeword <\/td>\n<\/tr>\n
7<\/td>\nIntroduction <\/td>\n<\/tr>\n
9<\/td>\n1 \u200bScope
2 \u200bNormative references
3 \u200bTerms and definitions <\/td>\n<\/tr>\n
10<\/td>\n3.1 \u200bGeneral <\/td>\n<\/tr>\n
13<\/td>\n3.2 \u200bInstallation
4 \u200bAbbreviated terms <\/td>\n<\/tr>\n
14<\/td>\n5 \u200bGeneral <\/td>\n<\/tr>\n
15<\/td>\n6 \u200bRequirements
6.1 \u200bCleanroom requirements <\/td>\n<\/tr>\n
17<\/td>\n6.2 \u200bOther requirements
6.3 \u200bDocumentation
7 \u200bDesign
7.1 \u200bGeneral <\/td>\n<\/tr>\n
18<\/td>\n7.2 \u200bConceptual design
7.3 \u200bBasic design <\/td>\n<\/tr>\n
19<\/td>\n7.4 \u200bDetailed design
7.5 \u200bChange management <\/td>\n<\/tr>\n
20<\/td>\n8 \u200bConstruction
8.1 \u200bGeneral
8.2 \u200bConstruction plan
8.2.1 \u200bGeneral
8.2.2 \u200bSchedule
8.2.3 \u200bQuality plan
8.2.4 \u200bClean build protocol <\/td>\n<\/tr>\n
21<\/td>\n8.3 \u200bConstruction verification
8.4 \u200bDocumentation
9 \u200bStart-up
9.1 \u200bGeneral <\/td>\n<\/tr>\n
22<\/td>\n9.2 \u200bCommissioning
9.2.1 \u200bGeneral
9.2.2 \u200bSetting to work
9.2.3 \u200bFunctional and performance verifications
9.3 \u200bTraining
9.4 \u200bHandover
9.5 \u200bDocumentation
9.5.1 \u200bCommissioning documentation <\/td>\n<\/tr>\n
23<\/td>\n9.5.2 \u200bPerformance-monitoring instructions
9.5.3 \u200bMaintenance instructions
9.5.4 \u200bMaintenance record
9.5.5 \u200bRecord of training <\/td>\n<\/tr>\n
24<\/td>\nAnnex A (informative) Guidance on requirements <\/td>\n<\/tr>\n
32<\/td>\nAnnex B (informative) Guidance on design <\/td>\n<\/tr>\n
53<\/td>\nAnnex C (informative) Guidance on construction <\/td>\n<\/tr>\n
59<\/td>\nAnnex D (informative) Guidance on start-up <\/td>\n<\/tr>\n
64<\/td>\nBibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Cleanrooms and associated controlled environments – Design, construction and start-up<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2022<\/td>\n66<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":418133,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[204,2641],"product_tag":[],"class_list":{"0":"post-418123","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-13-040-30","7":"product_cat-bsi","9":"first","10":"instock","11":"sold-individually","12":"shipping-taxable","13":"purchasable","14":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/418123","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/418133"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=418123"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=418123"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=418123"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}